{"id":46616,"date":"2014-08-20T14:45:56","date_gmt":"2014-08-20T14:45:56","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=96d2b993490a3971c7925141735d177e"},"modified":"2014-08-20T14:45:56","modified_gmt":"2014-08-20T14:45:56","slug":"press-release-resurfacing-and-new-road-markings-for-m53","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=46616","title":{"rendered":"Press release: Resurfacing and new road markings for M53"},"content":{"rendered":"<div class=\"govspeak\">\n<p>Ten nights of work will be carried out between Tuesday 16 September and Friday 10 October with single carriageway, junction-to-junction closures needed to allow the work to be delivered safely.<\/p>\n<p>Highways Agency project sponsor Jakub Malaj said:<\/p>\n<blockquote>\n<p class=\"last-child\">This is routine work to tackle wear and tear and ensure drivers using the M53 can continue to enjoy safe and reliable journeys.<\/p>\n<\/blockquote>\n<p>All the work will be done overnight between 10pm and 5am or 7am on Saturdays and Sundays.    Good, clearly-signed diversions will be in place when either the southbound or northbound carriageway is closed between junctions.<\/p>\n<p>In June, the Agency\u2019s North West director Alan Shepherd reassured residents that resurfacing and other repairs for the M53 were scheduled for and being delivered this year.<\/p>\n<h4 id=\"general-enquiries\">General enquiries<\/h4>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h4 id=\"media-enquiries\">Media enquiries<\/h4>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Ongoing work to tackle wear and tear along the M53 will be continuing into the autumn with a \u00a3450,000 Highways Agency project to resurface the carriageway and renew road markings along the motorway between junction 5 at Eastham and junction 8 at Ellesmere Port Docks.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/46616"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=46616"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/46616\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=46616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=46616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=46616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}