{"id":50613,"date":"2014-11-24T09:56:01","date_gmt":"2014-11-24T09:56:01","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=3cb6657e8f30c4ac777541e314dddde6"},"modified":"2014-11-24T09:56:01","modified_gmt":"2014-11-24T09:56:01","slug":"press-release-planned-roadworks-in-devon-and-cornwall-weekly-summary-for-monday-24-november-2014-sunday-30-november","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=50613","title":{"rendered":"Press release: Planned roadworks in Devon and Cornwall: Weekly summary for Monday 24 November 2014 \u2013 Sunday 30 November"},"content":{"rendered":"<div class=\"govspeak\">\n<h4 id=\"a30-sticklepath-nr-okehampton--drainage-works\">A30 Sticklepath, nr Okehampton \u2013 Drainage works<\/h4>\n<p>East and westbound lane closure from 8am to 8.30pm (24 Nov)<\/p>\n<h4 id=\"a30-between-whiddon-down-and-woodleigh-nr-okehampton--drainage-works\">A30 Between Whiddon Down and Woodleigh, nr Okehampton \u2013 Drainage works<\/h4>\n<p>24hr eastbound lane closure (24-28 Nov)<br \/>\n24hr westbound lane closure at Whiddon Down (24-26 Nov)<\/p>\n<h4 id=\"a30-tongue-end-nr-okehampton--drainage-works\">A30 Tongue End, nr Okehampton \u2013 Drainage works<\/h4>\n<p>24hr east and westbound lane closure (25-26 Nov)<\/p>\n<h4 id=\"a30-fingle-glen-nr-exeter--drainage-works\">A30 Fingle Glen, nr Exeter \u2013 Drainage works<\/h4>\n<p>24hr east and westbound lane closure (26-27 Nov)<\/p>\n<h4 id=\"a30-between-woodleigh-and-whiddon-down-nr-okehampton--drainage-works\">A30 Between Woodleigh and Whiddon Down, nr Okehampton \u2013 Drainage works<\/h4>\n<p>24hr westbound lane closure (26-27 Nov)<\/p>\n<h4 id=\"a30-ide-nr-exeter--drainage-works\">A30 Ide, nr Exeter \u2013 Drainage works<\/h4>\n<p>24hr westbound lane closure (26-27 Nov)<\/p>\n<p>A30 Meldon, nr Okehampton \u2013 Drainage works<br \/>\n24hr westbound lane closure (26-28 Nov)<\/p>\n<h4 id=\"a30-alphington-exeter--drainage-works\">A30 Alphington, Exeter \u2013 Drainage works<\/h4>\n<p>Eastbound lane closure from 8pm to 4am (28-29 Nov)<\/p>\n<h4 id=\"a38-manadon-plymouth--junction-improvement\">A38 Manadon, Plymouth \u2013 Junction improvement<\/h4>\n<p>24hr eastbound narrow lanes and 50mph limit (6 Oct \u2013 22 Dec)<\/p>\n<h4 id=\"a38-dry-bridge-nr-south-brent--new-bridge-scheme\">A38 Dry Bridge, nr South Brent \u2013 New bridge scheme<\/h4>\n<p>24hr eastbound exit sliproad closure. Access for residents only. Diversion via Dart Bridge. (30 Oct \u2013 23 April) 24hr narrow lanes and 40mph limit on main carriageway. (10 Nov \u2013 23 April 2015)<\/p>\n<h4 id=\"a38-plympton--slope-stabilisation\">A38 Plympton \u2013 Slope stabilisation<\/h4>\n<p>24hr contraflow and 50mph limit (11 Nov \u2013 4 Dec)<\/p>\n<h4 id=\"a38-kennford-nr-exeter--junction-improvement\">A38 Kennford, nr Exeter \u2013 Junction improvement<\/h4>\n<p>24hr contraflow and 50mph limit. Splatford bridge closed with access for residents only. Diversion via A380 southbound up Telegraph Hill to Great Haldon and minor road past Exeter Racecourse to A38. (17 Nov \u2013 31 March 2015)<\/p>\n<h4 id=\"a38-ashburton--resurfacing\">A38 Ashburton \u2013 Resurfacing<\/h4>\n<p>Eastbound lane closure and convoy working from 7pm to 4am Mon to Fri. Various sliproad closures with locally signed diversions. (20-29 Nov)<\/p>\n<h4 id=\"a38-drumbridge-jct-heathfield-nr-bovey-tracey--junction-improvements\">A38 Drumbridge Jct, Heathfield, nr Bovey Tracey \u2013 Junction improvements<\/h4>\n<p>Various sliproad closures (27 Nov \u2013 30 April 2015)<\/p>\n<h4 id=\"a38-deep-lane-plympton--resurfacing\">A38 Deep Lane, Plympton \u2013 Resurfacing<\/h4>\n<p>Three-way traffic signals at junction of westbound exit sliproad and Deep Lane from 7pm to 7am (27-29 Nov)<\/p>\n<h4 id=\"a30-between-launceston-and-lifton--drainage-works\">A30 Between Launceston and Lifton \u2013 Drainage works<\/h4>\n<p>24hr westbound lane closure (26-28 Nov)<\/p>\n<h4 id=\"a30-highgate-nr-bodmin--surveys\">A30 Highgate, nr Bodmin \u2013 Surveys<\/h4>\n<p>Westbound lane closure from 9am to 4pm Mon to Fri (17-25 Nov)<\/p>\n<h4 id=\"a30-roseworthy-nr-redruth--tree-works\">A30 Roseworthy, nr Redruth \u2013 Tree works<\/h4>\n<p>Westbound lane closure from 9am to 4pm (24-28 Nov)<\/p>\n<h4 id=\"a30-between-scorrier-and-avers-redruth--tree-works\">A30 Between Scorrier and Avers, Redruth \u2013 Tree works<\/h4>\n<p>Westbound lane closure from 9am to 4pm (24-28 Nov)<\/p>\n<h4 id=\"a30-five-lanes-nr-launceston--cabling-works\">A30 Five Lanes, nr Launceston \u2013 Cabling works<\/h4>\n<p>East and westbound lane closure and convoy working from 8pm to 6am (24-25 Nov)<\/p>\n<h4 id=\"a30-canons-town-nr-hayle--surveys\">A30 Canon\u2019s Town, nr Hayle \u2013 Surveys<\/h4>\n<p>Traffic signals from 7pm to 6am (25-27 Nov)<\/p>\n<h4 id=\"a30-between-innis-downs-and-callywith-nr-bodmin--drainage-works\">A30 Between Innis Downs and Callywith, nr Bodmin \u2013 Drainage works<\/h4>\n<p>East and westbound carriageway closure from 8pm to midnight. Diversion via A389 through Bodmin (25-26 Nov)<\/p>\n<h4 id=\"a30-kennards-house-nr-launceston--cabling\">A30 Kennards House, nr Launceston \u2013 Cabling<\/h4>\n<p>East and westbound lane closure and convoy working from 8pm to 6am (25-26 Nov)<\/p>\n<h4 id=\"a30-between-carminow-cross-and-innis-downs-nr-bodmin--drainage-works\">A30 Between Carminow Cross and Innis Downs, nr Bodmin \u2013 Drainage works<\/h4>\n<p>24hr east and westbound lane closure and 50mph speed limit (26 Nov \u2013 2 March)<\/p>\n<h4 id=\"a30-temple-nr-bodmin--surveys\">A30 Temple, nr Bodmin \u2013 Surveys<\/h4>\n<p>Eastbound lane closure from 9am to 4pm Mon to Fri (26 Nov \u2013 1 Dec)<br \/>\nWestbound lane closure from 9am to 4mp Mon to Fri (26 Nov \u2013 5 Dec)<\/p>\n<h4 id=\"a30-between-lifton-and-launceston--drainage-works\">A30 Between Lifton and Launceston \u2013 Drainage works<\/h4>\n<p>24hr westbound lane closure (26-28 Nov)<\/p>\n<h4 id=\"a38-between-trerulefoot-and-tideford-nr-saltash--resurfacing\">A38 Between Trerulefoot and Tideford, nr Saltash \u2013 Resurfacing<\/h4>\n<p>East and westbound carriageway closure from 7.30pm to 6am. Diversion via B3249. Traffic signals on Trerulefoot Roundabout on Monday night. (24-25 Nov)<\/p>\n<h4 id=\"a38-between-trerulefoot-and-lower-clicker-near-liskear--resurfacing\">A38 Between Trerulefoot and Lower Clicker, near Liskear \u2013 Resurfacing<\/h4>\n<p>Westbound carriageway closure from 7.30pm to 6am. Diversion via A374 and B3252 (25-28 Nov)<\/p>\n<h4 id=\"a38-between-island-shop-jct-liskeard-and-trerulefoot--resurfacing\">A38 Between Island Shop Jct, Liskeard and Trerulefoot \u2013 Resurfacing<\/h4>\n<p>Eastbound carriageway closure from 8pm to 6am. Diversion via A390 to Callington and A388 to Carkeel. (25-28 Nov)<\/p>\n<h4 id=\"a38-bodmin-parkway--signing-work\">A38 Bodmin Parkway \u2013 signing work<\/h4>\n<p>Traffic signals from 9pm to 3am (25-26 Nov)<\/p>\n<h4 id=\"a38-tamar-bridge--maintenance-works\">A38 Tamar Bridge \u2013 Maintenance works<\/h4>\n<p>Eastbound lane closure from 9.30am to 3.30pm (26 Nov)<\/p>\n<h4 id=\"a38-dobwalls--resurfacing\">A38 Dobwalls \u2013 Resurfacing<\/h4>\n<p>24hr contraflow and 40mph limit for resurfacing (13 Oct \u2013 21 May 2015)<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 21 November but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/50613"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50613"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/50613\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}