{"id":50900,"date":"2014-11-28T14:04:39","date_gmt":"2014-11-28T14:04:39","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=c7cfc81be5082de4dc75269fd412a6a0"},"modified":"2014-11-28T14:04:39","modified_gmt":"2014-11-28T14:04:39","slug":"press-release-planned-roadworks-in-bristol-gloucestershire-somerset-banes-wiltshire-west-dorset-and-devon-weekly-summary-for-monday-1-december-sunday-7-december-2014","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=50900","title":{"rendered":"Press release: Planned roadworks in Bristol, Gloucestershire, Somerset, BANES, Wiltshire, West Dorset and Devon: Weekly summary for Monday 1 December \u2013 Sunday 7 December 2014"},"content":{"rendered":"<div class=\"govspeak\">\n<h3 id=\"bristol\">Bristol<\/h3>\n<h4 id=\"m4-junction-19--18-eastbound-resurfacing\">M4 Junction 19 \u2013 18 Eastbound: Resurfacing<\/h4>\n<p>Full carriageway closure including Junction 18 exit slip will be in place nightly from 8pm Monday 1 December until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m4-junction-18-eastbound-resurfacing\">M4 Junction 18 Eastbound: Resurfacing<\/h4>\n<p>Full carriageway closure between exit slip and entry slip ay Junction 18 from 8pm Tuesday 2 December until 6am the following morning.  Diversion is via exit slip and return on entry slip.<\/p>\n<h4 id=\"m4-junction-18-eastbound-resurfacing-1\">M4 Junction 18 Eastbound: Resurfacing<\/h4>\n<p>Full slip closure on exit slip will be in place nightly from 8pm Wednesday 3 December until 6am Saturday 6 December.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m4-junction-22-westbound-structure-maintenance\">M4 Junction 22 Westbound: Structure maintenance<\/h4>\n<p>Full carriageway closure between westbound off slip and on slip with single lane running over the  Second Severn Bridge  will be in place from 8pm Saturday 6 December until 6am the following morning.  Diversion will be off exit slip and back on entry slip.<\/p>\n<h4 id=\"m48-severn-bridge-resurfacing\">M48 Severn Bridge: Resurfacing<\/h4>\n<p>Full carriageway closure from Junction 2 exit to entry will be in place daily from 9.30am Wednesday 3 December until 5pm Thursday 4 December.  Diversion is off and back on.<\/p>\n<h4 id=\"a4-avon-viaductlondon-road-rbt-surveys\">A4 Avon Viaduct\/London Road Rbt: Surveys<\/h4>\n<p>Full southbound on slip closure will take place from 11pm Wednesday 3 December until 5.30am the following morning.  Diversion will be clearly signposted.<br \/>\nFull northbound off slip closure will take place from 11pm Thursday 4 December until 5.30am the following morning.  Diversion will be clearly signposted.<\/p>\n<h3 id=\"gloucestershire\">Gloucestershire<\/h3>\n<h4 id=\"m5-junction-11a--junction-12-bridge-repairs\">M5 Junction 11a \u2013 Junction 12: Bridge repairs<\/h4>\n<p>Narrow lanes with a width restriction of 5 metres, contraflows and speed restrictions will be in place during the day and occasional slip road and full carriageway closures will take place overnight.  Work is expected to continue until January 2015.<br \/>\nFull carriageway closure southbound between Junction 11A \u2013 12 from 10pm Friday 28 November until 6am the following morning.  Diversion will be clearly signposted<br \/>\nFrom 6am Saturday 29 November through to 8pm Sunday 30 November they will be 2 lanes running northbound and southbound in contraflow on the northbound carriageway.<br \/>\nFull carriageway closure southbound between Junction 11A \u2013 12 from 10pm Sunday 30 November until 6am the following morning.  Diversion will be clearly signposted<\/p>\n<h4 id=\"m5-junction-11--10-bridge-repairs\">M5 Junction 11 \u2013 10: Bridge repairs<\/h4>\n<p>Narrow lanes and 50 mph speed restrictions will be in place until May 2015.<\/p>\n<h4 id=\"m5-junction-10-bridge-repairs\">M5 Junction 10: Bridge Repairs<\/h4>\n<p>Narrow lanes with 50mph speed restriction on the southbound carriageway will be in place until October 2015.<\/p>\n<h4 id=\"a40-longford-rbt-improvements-pinch-point-scheme\">A40 Longford rbt: Improvements Pinch Point Scheme<\/h4>\n<p>Day time lanes closures and narrows lanes at night will take place from Monday 17 November until Mid December.<\/p>\n<h4 id=\"m5-junction-14--15-barrier-works\">M5 Junction 14 \u2013 15: Barrier Works<\/h4>\n<p>Narrow lanes with 50mph speed restriction on the southbound carriageway will be in place from 6am Sunday 7 December until March 2015.<\/p>\n<h3 id=\"wiltshire\">Wiltshire<\/h3>\n<h4 id=\"a36-upton-lovell-improvements\">A36 Upton Lovell: Improvements<\/h4>\n<p>24 hour temporary traffic signals will be in operation until the end of December 2014.<br \/>\nFull carriageway closure will take place nightly from 8pm Monday 24 November until 6am Wednesday 26 November.  Diversion will be clearly signposted.<\/p>\n<h3 id=\"north-somerset\">North Somerset<\/h3>\n<h4 id=\"m5-junction-21--22-barrier-works\">M5 Junction 21 \u2013 22: Barrier works<\/h4>\n<p>Narrow lanes, with two lanes running northbound and southbound with 50mph speed restriction will be in place until late December 2014.<\/p>\n<h3 id=\"somerset\">Somerset<\/h3>\n<h4 id=\"m5-between-junction-23--24-structures\">M5 between Junction 23 \u2013 24: Structures<\/h4>\n<p>Narrow lanes with 50mph speed restrictions will be in place northbound and southbound until mid December as phase 1 of works.<\/p>\n<h4 id=\"a303-sparkford-to-mere-resurfacing\">A303 Sparkford to Mere: Resurfacing<\/h4>\n<p>Full carriageway, slip road and layby closure will be in place from 8pm until 6am, from Monday 10 November until Saturday 6 December. Lane closures will be in place between 6am and 9pm at the weekends and daytime in the week. The diversion route will be clearly signposted.<\/p>\n<h3 id=\"banes\">Banes<\/h3>\n<p>No planned works.<\/p>\n<h3 id=\"west-dorset\">West Dorset<\/h3>\n<p>No planned works.<\/p>\n<h3 id=\"devon-m5-only\">Devon (M5 only)<\/h3>\n<p>####M5 between Junction 28 \u2013 29: Barrier works<br \/>\n 24\/ 7 hardshoulder and lane 1 will be closed from 6am Monday 24 November until 5pm Friday 19 December.<\/p>\n<h4 id=\"m5-junction-27-exit-slip-improvements--pinch-point\">M5 Junction 27 exit slip: Improvements \u2013 Pinch Point<\/h4>\n<p>24\/7 hardshoulder and lane 1 closed on southbound exit slip until until end of March 2015.<\/p>\n<h3 id=\"hampshire\">Hampshire<\/h3>\n<p>No planned works<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of the above date but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/50900"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50900"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/50900\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}