{"id":50947,"date":"2014-12-01T10:43:44","date_gmt":"2014-12-01T10:43:44","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=ab6be80dcc0d245b782ca2f6ddda76bd"},"modified":"2014-12-01T10:43:44","modified_gmt":"2014-12-01T10:43:44","slug":"press-release-planned-roadworks-in-devon-and-cornwall-weekly-summary-for-monday-1-december-2014-sunday-7-december-2014","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=50947","title":{"rendered":"Press release: Planned roadworks in Devon and Cornwall: Weekly summary for Monday 1 December 2014 \u2013 Sunday 7 December 2014"},"content":{"rendered":"<div class=\"govspeak\">\n<h4 id=\"a38-manadon-plymouth--junction-improvement\">A38 Manadon, Plymouth \u2013 Junction improvement<\/h4>\n<p>24hr eastbound narrow lanes and 50mph limit (6 Oct \u2013 6 Feb)<\/p>\n<h4 id=\"a38-dry-bridge-nr-south-brent--new-bridge-scheme\">A38 Dry Bridge, nr South Brent \u2013 New bridge scheme<\/h4>\n<p>24hr eastbound exit sliproad closure. Access for residents only. Diversion via Dart Bridge. (30 Oct \u2013 23 April) 24hr narrow lanes and 40mph limit on main carriageway. (10 Nov \u2013 23 April 2015)<\/p>\n<h4 id=\"a38-plympton--slope-stabilisation\">A38 Plympton \u2013 Slope stabilisation<\/h4>\n<p>24hr contraflow and 50mph limit (11 Nov \u2013 4 Dec)<\/p>\n<h4 id=\"a38-kennford-nr-exeter--junction-improvement\">A38 Kennford, nr Exeter \u2013 Junction improvement<\/h4>\n<p>24hr contraflow and 50mph limit. Splatford bridge closed with access for residents only. Diversion via A380 southbound up Telegraph Hill to Great Haldon and minor road past Exeter Racecourse to A38. (17 Nov \u2013 31 March 2015)<\/p>\n<h4 id=\"a38-drumbridge-jct-heathfield-nr-bovey-tracey--junction-improvements\">A38 Drumbridge Jct, Heathfield, nr Bovey Tracey \u2013 Junction improvements<\/h4>\n<p>Various sliproad and roundabout closures (27 Nov \u2013 30 April 2015)<\/p>\n<h4 id=\"a38-dobwalls--resurfacing\">A38 Dobwalls \u2013 Resurfacing<\/h4>\n<p>24hr contraflow and 40mph limit for resurfacing (13 Oct \u2013 21 May 2015)<\/p>\n<h4 id=\"a38-ashburton--resurfacing\">A38 Ashburton \u2013 Resurfacing<\/h4>\n<p>Eastbound lane closure and convoy working from 7pm to 4am Mon to Fri. Various sliproad closures with locally signed diversions. (20 Nov-5 Dec)<\/p>\n<h4 id=\"a30-roseworthy-nr-redruth--tree-works\">A30 Roseworthy, nr Redruth \u2013 Tree works<\/h4>\n<p>Westbound lane closure from 9am to 4pm (24 Nov \u2013 1 Dec)<\/p>\n<h4 id=\"a30-between-carminnow-cross-and-innis-down-nr-bodmin--drainage-works\">A30 Between Carminnow Cross and Innis Down, nr Bodmin \u2013 Drainage works<\/h4>\n<p>24hr westbound lane closure and 50mph speed limit (25 Nov \u2013 2 March)<\/p>\n<h4 id=\"a30-temple-nr-bodmin--surveys\">A30 Temple, nr Bodmin \u2013 Surveys<\/h4>\n<p>Eastbound lane closure from 9am to 4pm (26 Nov \u2013 1 Dec)<br \/>\nWestbound lane closure from 9am to 4pm (27 Nov \u2013 5 Dec)<\/p>\n<h4 id=\"a30-longrock-nr-penzance--tree-works\">A30 Longrock, nr Penzance \u2013 Tree works<\/h4>\n<p>Westbound lane closure from 9am to 4pm (1-5 Dec)<\/p>\n<h4 id=\"a30-tolvaddon-nr-redruth--tree-works\">A30 Tolvaddon, nr Redruth \u2013 Tree works<\/h4>\n<p>Lane closure on westbound exit sliproad from 9am to 4pm (1 Dec)<\/p>\n<h4 id=\"a30-mitchell-nr-newquay--tree-works\">A30 Mitchell, nr Newquay \u2013 Tree works<\/h4>\n<p>Westbound lane closure from 9am to 4pm Fri and Mon (2-5 Dec)<\/p>\n<h4 id=\"a30-summercourt-nr-newquay--resurfacing\">A30 Summercourt, nr Newquay \u2013 Resurfacing<\/h4>\n<p>Eastbound lane closure and convoy working from 7pm to 5am (2-3 Dec)<\/p>\n<h4 id=\"a30-fraddon-nr-newquay--resurfacing\">A30 Fraddon, nr Newquay \u2013 Resurfacing<\/h4>\n<p>Westbound lane closure and convoy working from 7pm to 5am (3-5 Dec)<\/p>\n<h4 id=\"a30-between-chiverton-cross-and-zelah-hill-nr-truro--resurfacing\">A30 Between Chiverton Cross and Zelah Hill, nr Truro \u2013 Resurfacing<\/h4>\n<p>East and westbound carriageway closures from 8pm to 6am. Diversion via A3075 and B3285 (5-6 Dec)<\/p>\n<h4 id=\"a38-various-locations-between-tideford-and-carkeel-nr-saltash--drainage-works\">A38 Various locations between Tideford and Carkeel, nr Saltash \u2013 Drainage works<\/h4>\n<p>Traffic signals from 7pm to 4am (1-6 Dec)<\/p>\n<h4 id=\"a38-island-shop-liskeard---resurfacing\">A38 Island Shop, Liskeard &#8211; Resurfacing<\/h4>\n<p>Eastbound lane closure from 7pm to 6am<\/p>\n<h4 id=\"a38-island-shop-liskeard--resurfacing\">A38 Island Shop, Liskeard \u2013 Resurfacing<\/h4>\n<p>Eastbound exit sliproad closure from 7pm to 6am. Diversion via Trerulefoot roundabout (1-2 Dec and 5-6Dec)<\/p>\n<h4 id=\"a38-tamar-bridge-to-saltash--christmas-event-in-saltash\">A38 Tamar Bridge to Saltash \u2013 Christmas Event in Saltash<\/h4>\n<p>Lane closure on westbound exit sliproad (6 Dec)<\/p>\n<p>The Highways Agency is working with the industry and road users to reduce the risks of working on the roads.  For the safety of road workers and all road users, when you are approaching roadworks:<\/p>\n<ul>\n<li>Keep within the speed limit \u2013 it is there for your safety.<\/li>\n<li>Get into the correct lane in good time \u2013 don\u2019t keep switching.<\/li>\n<li>Concentrate on the road ahead, not the roadworks.<\/li>\n<li>Be alert for works\u2019 traffic leaving or entering roadworks.<\/li>\n<li>Keep a safe distance \u2013 there could be queues in front.<\/li>\n<li>Observe all signs \u2013 they are there to help you.<\/li>\n<\/ul>\n<h4 id=\"general-enquiries\">General enquiries<\/h4>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h4 id=\"media-enquiries\">Media enquiries<\/h4>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 28 November but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/50947"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50947"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/50947\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}