{"id":51562,"date":"2014-12-12T12:49:48","date_gmt":"2014-12-12T12:49:48","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=adcc63277aafd25df813a25572432226"},"modified":"2014-12-12T12:49:48","modified_gmt":"2014-12-12T12:49:48","slug":"press-release-traffic-bulletin-timetable-set-out-for-m25-repairs","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=51562","title":{"rendered":"Press release: Traffic bulletin: timetable set out for M25 repairs"},"content":{"rendered":"<div class=\"govspeak\">\n<p>One lane in each direction has been closed past the scene of multi-vehicle incident which happened in the early hours on Tuesday morning between junctions 26 and 27 of the M25, near Theydon Bois.<\/p>\n<p>45 metres of concrete safety barrier needs to be replaced, along with 250 sq. metres of the road surface.<\/p>\n<p>Work is well underway, and is being carried out both during the day and overnight, when additional lane closures are in place. The work involves:<\/p>\n<ul>\n<li>Breaking out and removing the damaged concrete barrier<\/li>\n<li>Installing a shutter (or mould), into which concrete will be poured and compacted to create the replacement concrete barrier <\/li>\n<li>Connecting the new barrier at each end to the existing safety barrier<\/li>\n<li>Removing equipment needed to install the barrier<\/li>\n<li>Resurface the road and removing the roadworks<\/li>\n<\/ul>\n<p>How quickly the work can be completed depends on weather conditions, with temperature and rainfall both being crucial factors in how long it takes the concrete to reach full strength.<\/p>\n<p>Highways Agency teams will work hard to keep three lanes open at all busy times, and up to date traffic information will be available on the Highways Agency\u2019s website.<\/p>\n<h4 id=\"general-enquiries\">General enquiries<\/h4>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h4 id=\"media-enquiries\">Media enquiries<\/h4>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A section of the M25 in Essex that was badly damaged in a serious collision will fully reopen early next week, the Highways Agency announced today.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/51562"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=51562"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/51562\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=51562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=51562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=51562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}