{"id":51586,"date":"2014-12-12T16:37:56","date_gmt":"2014-12-12T16:37:56","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=fff144fd363e95352b589e86691d876b"},"modified":"2014-12-12T16:37:56","modified_gmt":"2014-12-12T16:37:56","slug":"press-release-planned-roadworks-in-bristol-gloucestershire-somerset-banes-wiltshire-west-dorset-and-devon-weekly-summary-for-monday-15-december-sunday-21-december-2014","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=51586","title":{"rendered":"Press release: Planned roadworks in Bristol, Gloucestershire, Somerset, BANES, Wiltshire, West Dorset and Devon: Weekly summary for Monday 15 December \u2013 Sunday 21 December 2014"},"content":{"rendered":"<div class=\"govspeak\">\n<h4 id=\"bristol\">Bristol<\/h4>\n<h4 id=\"m4-junction-19---18-eastbound-resurfacing\">M4 Junction 19 &#8211; 18 Eastbound: Resurfacing<\/h4>\n<p>Full carriageway closure will take place from 8pm Monday 15 December until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m4-junction-19---18-eastbound-resurfacing-1\">M4 Junction 19 &#8211; 18 Eastbound: Resurfacing<\/h4>\n<p>Full carriageway closure will take place from 8pm Friday 19 December until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m4m5-almondsbury-interchange-communications\">M4\/M5 Almondsbury Interchange: Communications<\/h4>\n<p>M5 southbound link with M4 eastbound link,  M4 eastbound link with M5 northbound and M4 eastbound link with M5 southbound will be closed from 9pm Thursday 18 December until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m5-junction-17--communications\">M5 Junction 17:  Communications<\/h4>\n<p>The northbound carriageway will be closed between the exit and entry slip from 8pm Monday 15 December until 6am the following morning.   Diversion will be off and back on the slips.<\/p>\n<h4 id=\"m5-junction-17-communications\">M5 Junction 17: Communications<\/h4>\n<p>Full southbound exit slip will take place from 9pm Tuesday 19 December until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m48-severn-bridge-resurfacing\">M48 Severn Bridge: Resurfacing<\/h4>\n<p>Full carriageway closure from Junction 2 exit to entry will be in place daily from 9.30am Tuesday 16 December until 5pm Thursday 18 December.  Diversion is off and back on.<\/p>\n<h4 id=\"gloucestershire\">Gloucestershire<\/h4>\n<h4 id=\"m5-junction-11a--junction-12-bridge-repairs\">M5 Junction 11a \u2013 Junction 12: Bridge repairs<\/h4>\n<p>Narrow lanes with a width restriction of 5 metres, contraflows and speed restrictions will be in place during the day and occasional slip road and full carriageway closures will take place overnight.  Work is expected to continue until mid December 2014<\/p>\n<h4 id=\"m5-junction-11a--12-removal-of-traffic-management\">M5 Junction 11a \u2013 12: Removal of Traffic Management<\/h4>\n<p>Full southbound carriageway closure will take place from 9pm Monday 15 December until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m5-junction-12--11-removal-of-traffic-management\">M5 Junction 12 \u2013 11: Removal of Traffic Management<\/h4>\n<p>Full northbound carriageway closure will take place from 9pm Tuesday 16 December until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m5-junction-11--10-bridge-repairs\">M5 Junction 11 \u2013 10: Bridge repairs<\/h4>\n<p>Narrow lanes and 50 mph speed restrictions will be in place until May 2015.<\/p>\n<h4 id=\"m5-junction-10-bridge-repairs\">M5 Junction 10: Bridge Repairs<\/h4>\n<p>Narrow lanes with 50mph speed restriction on the southbound carriageway will be in place until October 2015.<\/p>\n<h4 id=\"m5-junction-10-bridge-repairs-1\">M5 Junction 10: Bridge Repairs<\/h4>\n<p>Full southbound exit slip closure will take place nightly from 9pm Thursday 18 December until Saturday 20 December.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"a40-longford-rbt-improvements-pinch-point-scheme\">A40 Longford rbt: Improvements Pinch Point Scheme<\/h4>\n<p>Day time lanes closures and narrows lanes at night will take place from Monday 17 November until Mid December.<\/p>\n<h4 id=\"m5-junction-14--15-geotechnical-works\">M5 Junction 14 \u2013 15: Geotechnical works<\/h4>\n<p>Narrow lanes with 50mph speed restriction on the southbound carriageway will be in place until March 2015.<\/p>\n<h4 id=\"wiltshire\">Wiltshire<\/h4>\n<h4 id=\"a36-upton-lovell-improvements\">A36 Upton Lovell: Improvements<\/h4>\n<p>24 hour temporary traffic signals will be in operation until the end of December 2014.<\/p>\n<p>Full carriageway closure will take place nightly from 8pm Friday 112 December until 6am Tuesday 16 December.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m4-junction-18-resurfacing\">M4 Junction 18: Resurfacing<\/h4>\n<p>Eastbound exit slip will be closed from 8pm Wednesday 17 December until 6am the following morning. Diversion will be clearly signposted.<\/p>\n<h4 id=\"north-somerset\">North Somerset<\/h4>\n<p>No planned works<\/p>\n<h4 id=\"somerset\">Somerset<\/h4>\n<h4 id=\"m5-between-junction-23--24-structures\">M5 between Junction 23 \u2013 24: Structures<\/h4>\n<p>Phase 2 or works consist of narrow lanes with a width restriction of 4.8 metres on the southbound carriageway, contraflows and speed restrictions will be in place during the day. Work is expected to continue until mid January 2015 when phase 3 will be implemented.<\/p>\n<h4 id=\"a303-eastbound-sparkford-to-wincanton-resurfacing\">A303 Eastbound Sparkford to Wincanton: Resurfacing<\/h4>\n<p>Full carriageway, will be in place nightly from 8pm until 6am, from Tuesday16 December until Saturday 20 December. The diversion route will be clearly signposted.<\/p>\n<h4 id=\"a303-westbound-sparkford-to-wincanton-resurfacing\">A303 Westbound Sparkford to Wincanton: Resurfacing<\/h4>\n<p>Full carriageway, will be in place nightly from 8pm until 6am, from Wednesday 17 December until 6am the following morning. The diversion route will be clearly signposted.<\/p>\n<h4 id=\"banes\">BANES<\/h4>\n<p>No planned works.<\/p>\n<h4 id=\"west-dorset\">West Dorset<\/h4>\n<p>No planned works.<\/p>\n<h4 id=\"devon-m5-only\">Devon (M5 only)<\/h4>\n<h4 id=\"m5-between-junction-28--29-barrier-works\">M5 between Junction 28 \u2013 29: Barrier works<\/h4>\n<p>24\/ 7 hardshoulder and lane 1 will be closed from 6am Monday 24 November until 5pm Friday 19 December.<\/p>\n<h4 id=\"m5-junction-27-exit-slip-improvements--pinch-point\">M5 Junction 27 exit slip: Improvements \u2013 Pinch Point<\/h4>\n<p>24\/7 hardshoulder and lane 1 closed on southbound exit slip until until end of March 2015.<\/p>\n<h4 id=\"hampshire\">Hampshire<\/h4>\n<p>No planned works<\/p>\n<h4 id=\"general-enquiries\">General enquiries<\/h4>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h4 id=\"media-enquiries\">Media enquiries<\/h4>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of the above date but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/51586"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=51586"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/51586\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=51586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=51586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=51586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}