{"id":52132,"date":"2015-01-02T11:50:50","date_gmt":"2015-01-02T11:50:50","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=8fecb8b62c70111519d792fd87525dff"},"modified":"2015-01-02T11:50:50","modified_gmt":"2015-01-02T11:50:50","slug":"press-release-planned-roadworks-in-bristol-gloucestershire-somerset-banes-wiltshire-west-dorset-and-devon-weekly-summary-for-monday-5-january-sunday-11-january-2015","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=52132","title":{"rendered":"Press release: Planned roadworks in Bristol, Gloucestershire, Somerset, BANES, Wiltshire, West Dorset and Devon: Weekly summary for Monday 5 January \u2013 Sunday 11 January 2015"},"content":{"rendered":"<div class=\"govspeak\">\n<h3 id=\"bristol\">Bristol<\/h3>\n<p>M4 Junction 18 : Resurfacing<br \/>\nFull Eastbound exit slip will be closed nightly from from 9pm Friday 9 January until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h3 id=\"gloucestershire\">Gloucestershire<\/h3>\n<p>M5 Junction 11a \u2013 12: Bridge repairs<br \/>\nNarrow lanes and 50 mph speed restrictions will be in place until April 2015.<\/p>\n<p>M5 Junction 11 \u2013 10: Bridge repairs<br \/>\nNarrow lanes and 50 mph speed restrictions will be in place until May 2015.<\/p>\n<p>M5 Junction 10: Bridge Repairs<br \/>\nNarrow lanes with 50mph speed restriction on the southbound carriageway will be in place until October 2015.<\/p>\n<p>A40 Longford rbt to Elmbridge Court rbt: Resurfacing<br \/>\nFull carriageway closure will take place nightly from 8pm Tuesday 6 January until 6am Saturday 10 January.  Diversion will be clearly signposted.<\/p>\n<p>A40 Over Rbt: Improvements Pinch Point Scheme<br \/>\nDay time lanes closures  with narrows lanes 24\/7 will take place from  9pm Sunday 4 Jan.  Works are likely to be in place until end of March 2015.<\/p>\n<h3 id=\"wiltshire\">Wiltshire<\/h3>\n<p>A36 Upton Lovell: Improvements<br \/>\n24 hour temporary traffic signals will be in operation until the mid February 2015.<\/p>\n<p>M4 Junction 15: Resurfacing<br \/>\nFull Eastbound exit slip will be closed nightly from 10pm Tuesday 16 January until 6am Wednesday 14 January.  Diversion will be clearly signposted.<\/p>\n<h3 id=\"north-somerset\">North Somerset<\/h3>\n<p>No planned works<\/p>\n<h3 id=\"somerset\">Somerset<\/h3>\n<p>M5 between Junction 23 \u2013 24: Structures<br \/>\nPhase 2 or works consist of narrow lanes with a width restriction of 4.8 metres on the southbound carriageway, contraflows and speed restrictions will be in place during the day. Work is expected to continue until mid January 2015 when phase 3 will be implemented.<\/p>\n<p>M5 Junction 23 and 24: Resurfacing<br \/>\nFull carriageway closure northbound and southbound including Junction 23 southbound entry slip and Junction24 northbound entry slip will take place from 8pm Thursday 8 Jan until 8am the following morning.  Diversion will be clearly signposted.<\/p>\n<h3 id=\"banes\">BANES<\/h3>\n<p>No planned works.<\/p>\n<h3 id=\"west-dorset\">West Dorset<\/h3>\n<p>No planned works.<\/p>\n<h3 id=\"devon-m5-only\">Devon (M5 only)<\/h3>\n<p>M5 between Junction 28 \u2013 29: Barrier works<br \/>\n24\/ 7 hardshoulder and lane 1 will be closed from 6am Monday 5 January and will be in place at various locations until end March 2015.<\/p>\n<h3 id=\"m5-junction-27-exit-slip-improvements--pinch-point\">M5 Junction 27 exit slip: Improvements \u2013 Pinch Point<\/h3>\n<p>24\/7 hardshoulder and lane 1 closed on southbound exit slip until end of March 2015.<br \/>\nFull southbound exit slip will be closed  from 9pm Sunday 4th January until 6am the following morning. Diversion will be clearly signposted.<\/p>\n<h3 id=\"hampshire\">Hampshire<\/h3>\n<p>No planned works<\/p>\n<h4 id=\"general-enquiries\">General enquiries<\/h4>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h4 id=\"media-enquiries\">Media enquiries<\/h4>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of the above date but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/52132"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=52132"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/52132\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=52132"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=52132"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=52132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}