{"id":52912,"date":"2015-01-26T14:45:18","date_gmt":"2015-01-26T14:45:18","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=42d8ede15565ac76e5adf7d15e8d4db3"},"modified":"2015-01-26T14:45:18","modified_gmt":"2015-01-26T14:45:18","slug":"press-release-planned-roadworks-in-bristol-gloucestershire-somerset-banes-wiltshire-west-dorset-and-devon-weekly-summary-for-monday-26-january-sunday-1-february-2015","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=52912","title":{"rendered":"Press release: Planned roadworks in Bristol, Gloucestershire, Somerset, BANES, Wiltshire, West Dorset and Devon: Weekly summary for Monday 26 January \u2013 Sunday 1 February 2015"},"content":{"rendered":"<div class=\"govspeak\">\n<h3 id=\"bristol\">Bristol<\/h3>\n<h4 id=\"m5-junction-16-pinch-point-improvement-scheme\">M5 Junction 16: Pinch Point Improvement Scheme<\/h4>\n<p>Narrow lanes will be in operation until mid April 2015.<\/p>\n<h4 id=\"m4-junction18-resurfacing\">M4 Junction18: Resurfacing<\/h4>\n<p>Eastbound closure will take place nightly from 8pm Tuesday 27 January until 6am Saturday 31 January. Diversion will be via exit slip road then back on entry slip road.<\/p>\n<h3 id=\"gloucestershire\">Gloucestershire<\/h3>\n<h4 id=\"m5-junction-11a--12-bridge-repairs\">M5 Junction 11a \u2013 12: Bridge repairs<\/h4>\n<p>Narrow lanes and 50 mph speed restrictions will be in place until April 2015.<\/p>\n<h4 id=\"m5-junction-11--10-bridge-repairs\">M5 Junction 11 \u2013 10: Bridge repairs<\/h4>\n<p>Narrow lanes and 50 mph speed restrictions will be in place until May 2015.<\/p>\n<h4 id=\"m5-junction-10-bridge-repairs\">M5 Junction 10: Bridge repairs<\/h4>\n<p>Narrow lanes with 50mph speed restriction on the southbound carriageway will be in place until October 2015.<\/p>\n<h4 id=\"m5-junction-14--15-geotechnical-works\">M5 Junction 14 \u2013 15: Geotechnical works<\/h4>\n<p>Narrow lanes with 50mph speed restriction on the southbound carriageway will be in place until March 2015.<\/p>\n<h4 id=\"a40-over-roundabout-pinch-point-improvement-scheme\">A40 Over Roundabout: Pinch Point Improvement Scheme<\/h4>\n<p>Narrows lanes will be in place and day time lanes closures will take place until end of March 2015. <\/p>\n<h3 id=\"wiltshire\">Wiltshire<\/h3>\n<h4 id=\"a36-upton-lovell-improvements\">A36 Upton Lovell: Improvements<\/h4>\n<p>24 hour temporary traffic signals will be in operation until the mid February 2015.<\/p>\n<h4 id=\"m4-junction-17--18-barrier-installation\">M4 Junction 17 \u2013 18: Barrier installation<\/h4>\n<p>Narrow lanes with 50mph speed restriction on both carriageways will be in place until mid April 2015.<\/p>\n<h4 id=\"m4-junction-16--17-geotechnical-works\">M4 Junction 16 \u2013 17: Geotechnical works<\/h4>\n<p>Narrow lanes with 50mph speed restriction on the westbound carriageway will be in place until mid March 2015.<\/p>\n<h4 id=\"a303-countess-roundabout-to-solstice-park-resurfacing\">A303 Countess Roundabout to Solstice Park: Resurfacing<\/h4>\n<p>The eastbound carriageway will be closed overnight from Friday 30 January until Monday 2 February between 8pm and 6am the following morning.<\/p>\n<p>Diversion will be clearly signposted.<\/p>\n<p>North Somerset<\/p>\n<p>No planned works<\/p>\n<h3 id=\"somerset\">Somerset<\/h3>\n<h4 id=\"m5-between-junction-23--24-structures\">M5 between Junction 23 \u2013 24: Structures<\/h4>\n<p>Narrow lanes with a width restriction of 4.8 metres, contraflows and speed restrictions will be in place on the southbound carriageway from Saturday 24 January until mid February 2015.<\/p>\n<h4 id=\"a303-sparkford-to-mere-resurfacing\">A303 Sparkford to Mere: Resurfacing<\/h4>\n<p>The eastbound carriageway will be closed overnight from Thursday 22 January until Saturday 24 February between 8pm and 6am the following morning.<\/p>\n<p>Diversion will be clearly signposted.<\/p>\n<h3 id=\"banes\">BANES<\/h3>\n<h4 id=\"a36-monkton-combe-geotechnical-works\">A36 Monkton Combe: Geotechnical works<\/h4>\n<p>The A36 will be closed overnight from Monday 26 January  until Friday 30 January between 8pm and 6am the following morning. Diversions will be clearly signposted.<\/p>\n<h4 id=\"west-dorset\">West Dorset<\/h4>\n<p>No planned works.<\/p>\n<h3 id=\"devon-m5-only\">Devon (M5 only)<\/h3>\n<h4 id=\"m5-between-junction-28--29-barrier-works\">M5 between Junction 28 \u2013 29: Barrier works<\/h4>\n<p>The hard shoulder and lane 1 will be temporarily closed at various locations until the end March 2015.<\/p>\n<h4 id=\"m5-junction-27-pinch-point-improvement-scheme\">M5 Junction 27: Pinch Point Improvement scheme<\/h4>\n<p>The hard shoulder and lane 1 of the southbound exit slip road will be closed until end of March 2015. A full overnight closure of the southbound exit slip road will take place from 9pm on Monday 19 January until 6am the following morning.  Diversion will be clearly signposted.<\/p>\n<h4 id=\"m5-junction-28-barrier-improvements\">M5 Junction 28: Barrier Improvements<\/h4>\n<p>The northbound exit slip road and the southbound entry slip road will be closed overnight from 8pm on Monday 26 January until 6am the following morning.<\/p>\n<p>The southbound exit slip road will be closed overnight from 8pm Tuesday 27 January until 6am the following morning.<\/p>\n<p>The northbound exit and entry slip roads will be closed overnight from 8pm on Friday 30 January until 6am the following morning.<\/p>\n<p>The southbound entry slip road will be closed overnight from 8pm on Sunday 1 February until 6am the following morning.<\/p>\n<p>Diversions will be clearly signposted.<\/p>\n<p>Narrow lanes will be in operation in both directions until June 2015.  <\/p>\n<h4 id=\"hampshire\">Hampshire<\/h4>\n<p>No planned works<\/p>\n<h4 id=\"general-enquiries\">General enquiries<\/h4>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h4 id=\"media-enquiries\">Media enquiries<\/h4>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.\t<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of the above date but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/52912"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=52912"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/52912\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=52912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=52912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=52912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}