{"id":53562,"date":"2015-02-06T17:43:44","date_gmt":"2015-02-06T17:43:44","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=8c3237209f0f8b7f2d935ba1ee501ea3"},"modified":"2015-02-06T17:43:44","modified_gmt":"2015-02-06T17:43:44","slug":"press-release-1-4-million-resurfacing-investment-on-m5-between-junction-9-and-10","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=53562","title":{"rendered":"Press release: \u00a31.4 Million resurfacing investment on M5 between Junction 9 and 10"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The work, starting on the night of Monday, 9 February, will take place along approximately a three mile stretch of the sothbound motorway. It will be carried out at night between 8.00pm and 6.00am and will require various lane closures. The southbound entry sliproad at Junction 9 will also need to be closed on occasion. The work will be completed by mid April. <\/p>\n<p>Project sponsor Dave Frampton said,<\/p>\n<blockquote>\n<p>This work will ensure this section of the M5 remains safe and reliable for drivers for many years to come.<\/p>\n<p>In addition to the surfacing we will be taking the opportunity to replace a damaged kerb.<\/p>\n<p class=\"last-child\">Every effort has been made to ensure disruption is kept to a minimum by scheduling the works at night and we are not expecting any delays for road users.<\/p>\n<\/blockquote>\n<p>During closure of the southbound entry sliproad a clearly signed diversion route will be in place advising drivers to join the M5 northbound at Junction 9, continue until Junction 8 and return on the M5 southbound.<\/p>\n<h4 id=\"general-enquiries\">General enquiries<\/h4>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h4 id=\"media-enquiries\">Media enquiries<\/h4>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.\t<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Resurfacing work totalling \u00a31.4 million will start next week on the M5 in Gloucestershire improving journeys between Junctions 9 and 10 southbound.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/53562"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=53562"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/53562\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=53562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=53562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=53562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}