{"id":53615,"date":"2015-02-09T14:08:06","date_gmt":"2015-02-09T14:08:06","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=00d489f962fcd48b2c8a0ac3b1d44387"},"modified":"2015-02-09T14:08:06","modified_gmt":"2015-02-09T14:08:06","slug":"press-release-planned-roadworks-in-devon-and-cornwall-weekly-summary-for-monday-9-february-2014-sunday-15-february-2014","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=53615","title":{"rendered":"Press release: Planned roadworks in Devon and Cornwall: Weekly summary for Monday 9 February 2014 \u2013 Sunday 15 February 2014"},"content":{"rendered":"<div class=\"govspeak\">\n<p>This summary could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h4 id=\"a30-whiddon-down--drainage-works\">A30 Whiddon Down \u2013 Drainage works<\/h4>\n<p>24hr westbound lane closure and 50mph speed limit (18 Jan \u2013 6 March)<\/p>\n<h4 id=\"a30-between-whiddon-down-and-woodleigh-nr-exeter--drainage-works\">A30 Between Whiddon Down and Woodleigh, nr Exeter \u2013 Drainage works<\/h4>\n<p>24hr westbound lane closure and 50mph limit (10-12 Feb)<\/p>\n<h4 id=\"a38-manadon-plymouth--junction-improvement\">A38 Manadon, Plymouth \u2013 Junction improvement<\/h4>\n<p>24hr eastbound narrow lanes and 50mph speed limit. (6 Oct \u2013 31 March)<br \/>\n24hr westbound narrow lanes and 50mph limit. 24hr westbound entry sliproad closure. Diversion via St Budeaux (6 Jan \u2013 21 Feb)<\/p>\n<h4 id=\"a38-dry-bridge-nr-south-brent--new-bridge-scheme\">A38 Dry Bridge, nr South Brent \u2013 New bridge scheme<\/h4>\n<p>24hr eastbound exit sliproad closure. Access for residents only. Diversion via Dart Bridge. (30 Oct 14 \u2013 23 April 15) 24 hr narrow lanes and 40mph limit on main carriageway (10 Nov 14 \u2013 23 April 15)<\/p>\n<h4 id=\"a38-kennford-nr-exeter--junction-improvements\">A38 Kennford, nr Exeter \u2013 Junction improvements<\/h4>\n<p>24hr contraflow and 50mph speed limit. Splatford entry sliproad closed. Diversion via southbound A38, A380 and minor road past Exeter Racecourse to rejoin A38 northbound. (17 Nov \u2013 31 March)<\/p>\n<p>Westbound lane closures from 8pm to 6am (8 Jan \u2013 28 Feb)<\/p>\n<p>Eastbound lane closure from 8pm to 6am (11-12 Feb)<\/p>\n<h4 id=\"a38-drumbridges-nr-bovey-tracey--junction-improvement\">A38 Drumbridges, nr Bovey Tracey \u2013 Junction improvement<\/h4>\n<p>Various lane closures on sliproads and roundabout (27 Nov 14 \u2013 31 March 15)<\/p>\n<h4 id=\"a38-between-dart-bridge-and-marley-head-nr-south-brent--new-bridge-scheme\">A38 Between Dart Bridge and Marley head, nr South Brent \u2013 New bridge scheme<\/h4>\n<p>East and westbound carriageway closure. Sat 6pm to 10am, Sun 7pm to 6am and Mon and Tues 8pm to 6am. Diversion via A385 to Dartington and A384 to Dart Bridge. (7-11 Feb)<\/p>\n<h4 id=\"a38-bittaford-nr-plymouth--drainage-works\">A38 Bittaford, nr Plymouth \u2013 Drainage works<\/h4>\n<p>East and westbound lane closure from 7pm to 6am (9-12 Feb)<\/p>\n<h4 id=\"a38-lee-mill-nr-ivybridge--drainage-works\">A38 Lee Mill, nr Ivybridge \u2013 Drainage works<\/h4>\n<p>Westbound lane closure from 7pm to 6am (12-14 Feb)<\/p>\n<h4 id=\"a30-lifton-nr-launceston--resurfacing\">A30 Lifton, nr Launceston \u2013 Resurfacing<\/h4>\n<p>Eastbound lane closure from 7pm to 6am Mon to Fri (5 Feb \u2013 6 March)<\/p>\n<h4 id=\"a30-between-liftondown-and-sourton-cross-nr-okehampton--resurfacing\">A30 Between Liftondown and Sourton Cross, nr Okehampton \u2013 Resurfacing<\/h4>\n<p>Eastbound carriageway closure from 7pm to 6am Mon \u2013 Fri. Diversion via Liton, Sprytown, Lewdown and Bridestow. Daytime eastbound lane closure.  (5 Feb \u2013 6 March)<\/p>\n<h4 id=\"a30-between-carminow-cross-and-innis-downs-nr-bodmin--drainage-works\">A30 Between Carminow Cross and Innis Downs, nr Bodmin \u2013 Drainage works<\/h4>\n<p>24hr east and westbound lane closure and 50mph limit (25 Nov 14 \u2013 1 April 15)<\/p>\n<h4 id=\"a30-plusha-nr-launceston--surveys\">A30 Plusha, nr Launceston \u2013 Surveys<\/h4>\n<p>24hr westbound lane closure Mon \u2013 Fri (4-10 Feb)<\/p>\n<h4 id=\"a30-fraddon-nr-newquay--surveys\">A30 Fraddon, nr Newquay \u2013 Surveys<\/h4>\n<p>Westbound lane closure from 7.30pm to 4am (9-10 Feb)<\/p>\n<p>Eastbound lane closure from 7.30pm to 4am (10-11Feb)<\/p>\n<h4 id=\"a30-scorrier-nr-redruth--surveys\">A30 Scorrier, nr Redruth \u2013 Surveys<\/h4>\n<p>Westbound lane closure from 7.30pm to 4am (11-13 Feb)<\/p>\n<h4 id=\"a30-between-innis-downs-and-callywith-nr-bodmin--drainage-works\">A30 Between Innis Downs and Callywith, nr Bodmin \u2013 Drainage works<\/h4>\n<p>Eastbound carriageway closure from 8pm to 6am. Diversion via A389 through Bodmin. (11-12 Feb)<\/p>\n<h4 id=\"a30-cannaframe-nr-launceston--bt-works\">A30 Cannaframe, nr Launceston \u2013 BT works<\/h4>\n<p>Westbound lane closure from 9pm to 6am (11-12 Feb)<\/p>\n<h4 id=\"a38-dobwalls-bypass--resurfacing\">A38 Dobwalls Bypass \u2013 Resurfacing<\/h4>\n<p>24hr contraflow and 40mph speed limit (13 Oct 14 to 21 May 15)<\/p>\n<h4 id=\"a38-landrake-nr-saltash--bus-shelter-installation\">A38 Landrake, nr Saltash \u2013 Bus shelter installation<\/h4>\n<p>Traffic signals from 7pm to 6am (11-12 Feb)<\/p>\n<h4 id=\"a38-carminow-nr-bodmin--surveys\">A38 Carminow, nr Bodmin \u2013 Surveys<\/h4>\n<p>Traffic signals from 8pm to 6am (13-14 Feb)<\/p>\n<p>The Highways Agency is working with the industry and road users to reduce the risks of working on the roads.  For the safety of road workers and all road users, when you are approaching roadworks:<\/p>\n<ul>\n<li>Keep within the speed limit \u2013 it is there for your safety.<\/li>\n<li>Get into the correct lane in good time \u2013 don\u2019t keep switching.<\/li>\n<li>Concentrate on the road ahead, not the roadworks.<\/li>\n<li>Be alert for works\u2019 traffic leaving or entering roadworks.<\/li>\n<li>Keep a safe distance \u2013 there could be queues in front.<\/li>\n<li>Observe all signs \u2013 they are there to help you.<\/li>\n<\/ul>\n<h2 id=\"general-enquiries\">General enquiries<\/h2>\n<p>Members of the public should contact the Highways Agency Information Line on 0300 123 5000.<\/p>\n<h2 id=\"media-enquiries\">Media enquiries<\/h2>\n<p>Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.\t<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 9 February.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/53615"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=53615"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/53615\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=53615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=53615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=53615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}