{"id":56420,"date":"2015-04-17T15:49:34","date_gmt":"2015-04-17T15:49:34","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=3cfa54997c8969935e68eb3c11884118"},"modified":"2015-04-17T15:49:34","modified_gmt":"2015-04-17T15:49:34","slug":"press-release-planned-roadworks-in-devon-and-cornwall-weekly-summary-for-monday-20-april-2015-sunday-26-april-2015","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=56420","title":{"rendered":"Press release: Planned roadworks in Devon and Cornwall: Weekly summary for Monday 20 April 2015 \u2013 Sunday 26 April 2015"},"content":{"rendered":"<div class=\"govspeak\">\n<h3 id=\"a38-dry-bridge-nr-south-brent--new-bridge-scheme\">A38 Dry Bridge, nr South Brent \u2013 New bridge scheme<\/h3>\n<p>24hr eastbound exit sliproad closure. Access for residents only. Diversion via Dart Bridge. (30 Oct 14 \u2013 23 April 15) 24 hr narrow lanes and 40mph limit on main carriageway (10 Nov 14 \u2013 23 April 15)<\/p>\n<h3 id=\"a38-between-dart-bridge--marley-head-east-of-plymouth--bridge-scheme\">A38 Between Dart Bridge &amp; Marley Head, east of Plymouth \u2013 Bridge Scheme<\/h3>\n<p>Westbound carriageway closure 2000 &#8211; 0600 hrs Mon &#8211; Fri for new bridge scheme.  Diversion via A384 to Dartington &amp; A385 to Marley Head.<br \/>\nEastbound carriageway closure 2000 &#8211; 0600 hrs Mon &#8211; Fri for new bridge scheme.  Diversion via A385 to Dartington &amp; A384 to Dart Bridge.<br \/>\n(13 April \u2013 23 April)<\/p>\n<h3 id=\"a38-dobwalls-bypass--resurfacing\">A38 Dobwalls Bypass \u2013 Resurfacing<\/h3>\n<p>24hr contraflow and 40mph speed limit (13 Oct 14 to 21 May 15)<\/p>\n<h3 id=\"a38-drumbridges-nr-bovey-tracey--junction-improvement\">A38 Drumbridges, nr Bovey Tracey \u2013 Junction improvement<\/h3>\n<p>Various lane closures on sliproads and roundabout (27 Nov \u2013 30 June)<\/p>\n<h3 id=\"a38-kennford-nr-exeter--junction-improvement\">A38 Kennford, nr Exeter \u2013 Junction improvement<\/h3>\n<p>24hr contraflow and 50mph speed limit (17 Nov 14 \u2013 30 June 15)<br \/>\nEastbound lane closure from 8pm to 6am (24 March \u2013 20 April)<\/p>\n<h3 id=\"a38-carkeel-rdbt-saltash--junction-improvement\">A38 Carkeel Rdbt, Saltash \u2013 Junction improvement<\/h3>\n<p>30mph speed limit (28 Feb \u2013 31 May)<\/p>\n<h3 id=\"a30--alphington-exeter----survey\">A30  Alphington, Exeter  &#8211; Survey<\/h3>\n<p>Eastbound lane closure 1900 &#8211; 0600 hrs Mon &#8211; Fri for surveys (14 April-21 April)<\/p>\n<h3 id=\"a30---liftondown-east-of-launceston--bridge-work\">A30 &#8211; Liftondown, east of Launceston \u2013 Bridge work<\/h3>\n<p>24hr westbound lane closure &amp; 50 mph speed limit for bridge works. (12 April \u2013 20 April)<\/p>\n<h3 id=\"a30-between-carminow-cross-and-innis-downs-nr-bodmin--drainage-works\">A30 Between Carminow Cross and Innis Downs, nr Bodmin \u2013 Drainage works<\/h3>\n<p>24hr eastbound lane closure and 50mph limit (26 Nov 14 \u2013 6 May 15)<br \/>\n24hr westbound lane closure and 50mph speed limit. Traffic management removed in both directions for Easter break (25 Nov 14 \u2013 6 May)<\/p>\n<h3 id=\"a30-whiddon-down-east-of-okehampton--drainage-work\">A30 Whiddon Down, east of Okehampton \u2013 Drainage work.<\/h3>\n<p>24hr westbound westbound lane closure. (20 April- 24 April)<\/p>\n<h3 id=\"a30-tongue-end-east-of-oakhampton--drainage-work\">A30 Tongue End, east of Oakhampton \u2013 drainage work<\/h3>\n<p>24hr lane closure. (20 April-24 April).<\/p>\n<h3 id=\"a38-south-brent-east-of-plymouth-tree-work\">A38 South Brent, east of Plymouth \u2013tree work<\/h3>\n<p>Eastbound lane closure 7pm-4am (20 April-22 April)<\/p>\n<h3 id=\"a38-between-chudleigh-and-drumbridges-south-of-exeter-resurfacing-works\">A38 between Chudleigh and Drumbridges, south of Exeter \u2013resurfacing works<\/h3>\n<p>Westbound carriageway closure 1900 &#8211; 0600 hrs for resurfacing.  Diversion via B3193, A380, A383 &amp; A382<br \/>\n7pm-6am (23 April-24 April)<\/p>\n<h3 id=\"a38-chudleigh-south-of-exeter--resurfacing-work\">A38 Chudleigh, South of Exeter \u2013 resurfacing work<\/h3>\n<p>Westbound lane closure 7pm-6am (23 April-24 April)<\/p>\n<h3 id=\"a38-marley-head-east-of-plymouth--resurfacing-work\">A38 Marley Head, east of Plymouth \u2013 resurfacing work<\/h3>\n<p>Westbound  lane closure 7pm-6am (23 April- 24April)<\/p>\n<h3 id=\"a38-marley-head-east-of-plymouth--resurfacing-work-1\">A38 Marley Head, east of Plymouth \u2013 resurfacing work<\/h3>\n<p>Westbound sliproad  closure diversion via Lower Dean 7pm-6am (23 April-24 April)<\/p>\n<h3 id=\"a38-carkeel-roundabout-west-of-plymouth--improvement-scheme\">A38 Carkeel roundabout west of Plymouth \u2013 improvement scheme<\/h3>\n<p>Eastbound lane closure 0900 &#8211; 1530 hrs for junction improvement scheme (20 April-24 April)<\/p>\n<h3 id=\"a38-carkeel-roundabout-west-of-plymouth--improvement-scheme-1\">A38 Carkeel roundabout west of Plymouth \u2013 improvement scheme<\/h3>\n<p>Westbound lane closure 9.30am 3.30pm &#8211;  (21 April-24 April)<\/p>\n<h3 id=\"a38-landrake-west-of-plymouth--drainage-works\">A38 Landrake, west of Plymouth \u2013 drainage works<\/h3>\n<p>Traffic signals 8pm-4am 20 April-22 April<\/p>\n<h3 id=\"a38-tamar-bridge-west-of-plymouth--survey-work\">A38 Tamar Bridge, west of Plymouth \u2013 survey work<\/h3>\n<p>Eastbound lane closures 7.30pm &#8211; 4am 22 April-23April<\/p>\n<h3 id=\"a38-between-carkeel-roundabout-and-saltash-tunnel--improvement-scheme\">A38 Between Carkeel Roundabout and Saltash Tunnel \u2013 improvement scheme<\/h3>\n<p>Eastbound carriageway closure. Friday 7pm-Sat 8am and sat 7pm- Sun 9am. Diversion via B3271.<\/p>\n<h3 id=\"a38-between-carkeel-roundabout-and-saltash-tunnel--improvement-scheme-1\">A38 Between Carkeel Roundabout and Saltash Tunnel \u2013 improvement scheme<\/h3>\n<p>Westbound carriageway closure. Friday 7pm-Sat 8am and Sat 7pm- Sun 9am. Diversion via B3271.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct of April 17 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/56420"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=56420"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/56420\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=56420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=56420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=56420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}