{"id":56480,"date":"2015-04-22T09:59:17","date_gmt":"2015-04-22T09:59:17","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=1afe48c37aa072ca1a654c7a22ced419"},"modified":"2015-04-22T09:59:17","modified_gmt":"2015-04-22T09:59:17","slug":"press-release-m4-overnight-resurfacing-near-heathrow","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=56480","title":{"rendered":"Press release: M4 overnight resurfacing near Heathrow"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The work will be carried out overnight and involve carriageway and slip road closures to allow 3.7 miles of resurfacing. It is expected to be completed, weather permitting, in mid-May.<\/p>\n<p>It will involve the overnight closures, in various phases, of the eastbound M4 between junctions 4 and 3, the westbound carriageway between the exit and entry slip roads at junction 4b, the westbound entry slip road at junction 4 and the westbound exit slip road at junction 5.<\/p>\n<p>The work will be carried out overnight between the following times: <\/p>\n<ul>\n<li>Monday to Thursday 10pm to 5.30am<\/li>\n<li>Friday 11pm to 6am<\/li>\n<li>Saturday 10pm to 6am<\/li>\n<li>Sunday 10.30pm to 5.30am<\/li>\n<\/ul>\n<p>Clearly signed diversion routes will be in place during the closures.<\/p>\n<p>Details of each closure will be publicised in advance.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sections of the M4 will be closed in a series of overnight closures near Heathrow for three weeks from Monday (27 April).<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/56480"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=56480"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/56480\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=56480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=56480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=56480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}