{"id":56626,"date":"2015-05-01T07:57:35","date_gmt":"2015-05-01T07:57:35","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=955c6f2717bdf7ce48cc5d76561b06ff"},"modified":"2015-05-01T07:57:35","modified_gmt":"2015-05-01T07:57:35","slug":"press-release-bascule-bridge-work-finishes-early","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=56626","title":{"rendered":"Press release: Bascule Bridge work finishes early"},"content":{"rendered":"<div class=\"govspeak\">\n<p>Work to replace major components on the A12 Bascule Bridge in Lowestoft has finished a day early.<\/p>\n<p>The work, which began on 7 April, involved extremely technical works on one of four sets of hydraulic motors on the Bascule Bridge which had developed faults and needed replacing to help prevent the need for further maintenance work and to keep Bascule Bridge in a safe condition.<\/p>\n<p>Highways England Asset Development Manager, Brian Pitkin, said:<\/p>\n<blockquote>\n<p>We\u2019re pleased we got the work done as quickly and efficiently as possible and that we finished earlier than planned.<\/p>\n<p class=\"last-child\">We worked hard to carry out the work during the spring to avoid disrupting busy seasons and I\u2019d like to thank local businesses and residents for their patience during the works.<\/p>\n<\/blockquote>\n<p>The work consisted of replacing the hydraulic motors which power the bridge\u2019s lifting mechanism  and supporting steelwork.<\/p>\n<p>Highways England provides live traffic information via its <a rel=\"external\" href=\"http:\/\/www.highways.gov.uk\/traffic\">website<\/a>, iPhone app, local radio travel bulletins and electronic road signs. Travel information is also available by phone from the Highways England Customer Contact Centre on 0300 123 5000 and updates will be provided via Twitter @HAtraffic_east.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Work to replace major components on the A12 Bascule Bridge in Lowestoft has finished a day early.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/56626"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=56626"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/56626\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=56626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=56626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=56626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}