{"id":62838,"date":"2015-10-14T15:08:24","date_gmt":"2015-10-14T15:08:24","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=853982e79ca9dbadf6b98c23afc03fd6"},"modified":"2015-10-14T15:08:24","modified_gmt":"2015-10-14T15:08:24","slug":"press-release-new-start-for-2-cumbria-schools-with-20-million-rebuild","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=62838","title":{"rendered":"Press release: New start for 2 Cumbria schools with \u00a320 million rebuild"},"content":{"rendered":"<div class=\"govspeak\">\n<p>Pupils from 2 Cumbria schools have marked the start of work on a modern, multi-million pound building through the government\u2019s flagship rebuilding programme.  <\/p>\n<p>Workington Academy is being built through the \u00a34.4 billion <a href=\"https:\/\/www.gov.uk\/government\/collections\/priority-school-building-programme-psbp\">priority school building programme (<abbr title=\"priority school building programme\">PSBP<\/abbr>)<\/a>, which is transforming some of the most run-down schools in the country.<\/p>\n<p>As a result of the \u00a320.1 million investment, 2 schools &#8211; Stainburn School and Science College and Southfield Technology College &#8211; will come together in a modern, fit-for-purpose new 2-storey facility. Work is due to be completed by June 2017.<\/p>\n<p>Schools Minister Lord Nash said:<\/p>\n<blockquote>\n<p>Our investment in school buildings across the country is transforming the learning environment for tens of thousands of pupils and their teachers.<\/p>\n<p>The start of construction at Workington Academy is a key milestone for the <abbr title=\"priority school building programme\">PSBP<\/abbr> in Cumbria.<\/p>\n<p class=\"last-child\">Ensuring all children have access to the best possible schools and facilities is just one part of our commitment to help all young people reach their potential regardless of their background. These buildings will provide modern, fit-for-purpose schools for pupils for many years to come.<\/p>\n<\/blockquote>\n<p>Lorrayne Hughes, Executive Headteacher of William Howard Trust, said:<\/p>\n<blockquote>\n<p class=\"last-child\">These are really exciting times for the community of Workington, with a fantastic new building underway that will provide excellent facilities and an outstanding learning environment.<\/p>\n<\/blockquote>\n<p>A spokesman for Sir Robert McAlpine said:<\/p>\n<blockquote>\n<p>Sir Robert McAlpine are extremely excited about being involved in this prestigious project. We have a wealth of experience of designing and constructing schools all over the country which we will bring to Workington to provide the excellent facility which the town has long required.<\/p>\n<p class=\"last-child\">We are also confident that the construction phase itself will boost the local economy. For instance the work has already commenced using local contractors, we have placed future orders with other members of the local supply chain and additionally a number of our management staff live in the local area.<\/p>\n<\/blockquote>\n<p>Thanks to the <abbr title=\"priority school building programme\">PSBP<\/abbr>, school buildings are being rebuilt faster and cheaper than those built under the previous school building initiative &#8211; Building Schools for the Future (<abbr title=\"building schools for the future\">BSF<\/abbr>). Under the <abbr title=\"building schools for the future\">BSF<\/abbr> it took 3 years for construction work to begin. This was slashed to 1 year for the <abbr title=\"priority school building programme\">PSBP<\/abbr>, with projects costing around a third less.<\/p>\n<p>A total of 537 schools will benefit from construction through the 2 phases of the <abbr title=\"priority school building programme\">PSBP<\/abbr>. <\/p>\n<h2 id=\"notes-to-editors\">Notes to editors<\/h2>\n<ol>\n<li>\n<p>The priority school building programme was established in 2011. A total of  <a href=\"https:\/\/www.gov.uk\/government\/publications\/psbp-list-of-successful-applicants\">260 schools<\/a> will have their condition needs addressed through the first phase of the programme. <\/p>\n<\/li>\n<li>\n<p>Thanks to decisions which have been taken to improve efficiency and reduce waste, significant work on those projects is already underway. In September, 22 buildings re-opened through <abbr title=\"priority school building programme\">PSBP<\/abbr> thanks to \u00a3160 million of construction work, and the total number to have been re-opened through the first phase of <abbr title=\"priority school building programme\">PSBP<\/abbr> is now 49. <\/p>\n<\/li>\n<li>\n<p>In May 2014, the government announced a further <a href=\"https:\/\/www.gov.uk\/government\/speeches\/education-spending\">\u00a32 billion for the second phase of the programme<\/a>. We published a list of the <a href=\"https:\/\/www.gov.uk\/government\/publications\/priority-school-building-programme-2-list-of-successful-schools\">277 schools to benefit from the second phase of the <abbr title=\"priority school building programme\">PSBP<\/abbr><\/a> on 9 February 2015.<\/p>\n<\/li>\n<\/ol>\n<div class=\"contact \" id=\"contact_997\">\n<div class=\"content\">\n<h3>DfE enquiries<\/h3>\n<div class=\"vcard contact-inner\">\n<div class=\"email-url-number\">\n<p class=\"tel\">\n              <span class=\"type\">Central newsdesk<\/span><br \/>\n              020 7783 8300\n            <\/p>\n<p class=\"tel\">\n              <span class=\"type\">General enquiries<\/span><br \/>\n              0370 000 2288\n            <\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>New academy in Workington being built through the government\u2019s flagship \u00a34.4 billion rebuilding programme.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/62838"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=62838"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/62838\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=62838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=62838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=62838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}