{"id":63712,"date":"2015-11-04T15:32:03","date_gmt":"2015-11-04T15:32:03","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=7ec4dd4a9fd364876e0f6b1b212bcc25"},"modified":"2015-11-04T15:32:03","modified_gmt":"2015-11-04T15:32:03","slug":"press-release-planned-roadworks-in-bristol-gloucestershire-somerset-banes-wiltshire-west-dorset-and-devon-weekly-summary-for-monday-2-november-to-sunday-8-november-2015","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=63712","title":{"rendered":"Press release: Planned roadworks in Bristol, Gloucestershire, Somerset, BANES, Wiltshire, West Dorset and Devon: weekly summary for Monday 2 November to Sunday 8 November 2015"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of the above date but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"bristol\">Bristol<\/h2>\n<h2 id=\"m4-between-junction-19-to-20-bridge-repairs\">M4 between junction 19 to 20: bridge repairs<\/h2>\n<p>Narrow lanes will be in place eastbound and westbound during the day with single lane running nightly from 9pm 2 September until mid-November.<\/p>\n<h2 id=\"m4-second-severn-crossing-bridge-repairs\">M4 Second Severn Crossing: bridge repairs<\/h2>\n<p>The westbound carriageway will be closed from 8pm 6 November until 6am the following morning. A diversion will be clearly signposted.<\/p>\n<h2 id=\"a4-crowley-way-resurfacing\">A4 Crowley Way: resurfacing<\/h2>\n<p>The southbound carriageway will be closed nightly including the link road to St Brendans roundabout from 8pm 2 November until 6am 4 November. A diversion will be clearly signposted.<\/p>\n<h2 id=\"a4-st-brendans-roundabout-resurfacing\">A4 St Brendans roundabout: resurfacing<\/h2>\n<p>The eastbound exit and westbound entry to St Brendans roundabout will be closed nightly from 8pm 4 November until 6am 7 November. A diversion will be clearly signposted.<\/p>\n<h2 id=\"a4-crowley-way-resurfacing-1\">A4 Crowley Way: resurfacing<\/h2>\n<p>The full carriageway will be closed from 5pm 7 November until 8am 8 November. A diversion will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-18a-resurfacing\">M5 junction 18a: resurfacing<\/h2>\n<p>The northbound exit slip road will be closed nightly from 8pm 2 November until 6am 7 November.  A diversion will be clearly signposted.<\/p>\n<h2 id=\"gloucestershire\">Gloucestershire<\/h2>\n<h2 id=\"m5-junction-10-bridge-repairs\">M5 junction 10: bridge repairs<\/h2>\n<p>Narrow lanes with 50mph speed restrictions will be in place on the southbound and northbound carriageway until November 2015.<\/p>\n<h2 id=\"m5-junction-13-to-15-installation-of-narrow-lanes-for-drainage-works\">M5 junction 13 to 15: installation of narrow lanes for drainage works<\/h2>\n<p>Narrow lanes with 50mph speed restrictions will be in place on the southbound and northbound carriageway until March 2016.<\/p>\n<h2 id=\"wiltshire\">Wiltshire<\/h2>\n<h2 id=\"m4-junction-16-resurfacing\">M4 junction 16: resurfacing<\/h2>\n<p>The westbound entry slip road will be closed nightly from 8pm 2 November until 6am 7 November. A diversion will be clearly signposted.<\/p>\n<h2 id=\"a36-deptford-interchange-signal-renewal\">A36 Deptford interchange: signal renewal<\/h2>\n<p>The northbound exit slip road will be closed from 8pm 2 November until 6am the following morning. A diversion will be clearly signposted.<\/p>\n<h2 id=\"a303-deptford-interchange-signal-renewal\">A303 Deptford interchange: signal renewal<\/h2>\n<p>The westbound exit slip road will be closed from 8pm 2 November until 6am the following morning. A diversion will be clearly signposted.<\/p>\n<h2 id=\"north-somerset\">North Somerset<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"somerset\">Somerset<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"banes\">BANES<\/h2>\n<h2 id=\"a4a46-batheaston-structure-maintenance\">A4\/A46 Batheaston: structure maintenance<\/h2>\n<p>The northbound carriageway will be closed from 8pm 5 November until 6am the following morning. A diversion will be clearly signposted.<\/p>\n<h2 id=\"west-dorset\">West Dorset<\/h2>\n<p>No planned works.<\/p>\n<h2 id=\"devon-m5-only\">Devon (M5 only)<\/h2>\n<h2 id=\"m5-junction-30-to-29-resurfacing\">M5 junction 30 to 29: resurfacing<\/h2>\n<p>The northbound carriageway will be closed nightly, including junction 30 entry slip road, from 8pm 2 November until 6am 5 November. Diversion will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-29-to-30-installation-of-narrow-lanes\">M5 junction 29 to 30: installation of narrow lanes<\/h2>\n<p>The southbound carriageway will be closed nightly, including junction 29 entry slip road, from 9pm 6 November until 6am 8 November. A diversion will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-30-to-29-installation-of-narrow-lanes\">M5 junction 30 to 29: installation of narrow lanes<\/h2>\n<p>The northbound carriageway will be closed nightly, including junction 30 entry slip road, from 9pm 6 November until 6am 8 November. A diversion will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-30-to-29-bridge-maintenance\">M5 junction 30 to 29: bridge maintenance<\/h2>\n<p>The northbound and southbound lane 3 will be closed 24\/7 with narrow lanes in operation from 6am 7 November until early December 2016.<\/p>\n<h2 id=\"hampshire\">Hampshire<\/h2>\n<p>No planned works<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/63712"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=63712"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/63712\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=63712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=63712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=63712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}