{"id":65073,"date":"2015-12-07T11:21:22","date_gmt":"2015-12-07T11:21:22","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=7cf9c2c7fa880c9a3ea6975258c3c782"},"modified":"2015-12-07T11:21:22","modified_gmt":"2015-12-07T11:21:22","slug":"press-release-planned-roadworks-in-west-midlands-weekly-summary-for-monday-7-to-sunday-13-december-2015","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=65073","title":{"rendered":"Press release: Planned roadworks in West Midlands: weekly summary for Monday 7 to Sunday 13 December 2015"},"content":{"rendered":"<div class=\"govspeak\">\n<h2 id=\"a38---a5121-branston-junction-west-midlands-resurfacing-works\">A38 &#8211; A5121 Branston junction, West Midlands: Resurfacing works<\/h2>\n<p>The carriageway will be closed in both directions overnight between 7pm and 7am from 7 December until 13 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a45-stivichall-junction-to-toll-bar-end-west-midlands-carriageway-resurfacing-and-temporary-barriers\">A45 Stivichall junction to Toll Bar End, West Midlands: Carriageway resurfacing and temporary barriers<\/h2>\n<p>The carriageway will be closed in both directions overnight between 8pm and 6am from 7 December until 13 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--between-a4113-and-b4368-west-midlands-parapet-repairs\">A49 \u2013 Between A4113 and B4368, West Midlands: Parapet repairs<\/h2>\n<p>The A49 carriageway between A4113 and B4368 will be closed in both directions from 11 December until 13 December. Please note, these are 24 hour full carriageway closure over the weekend. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5-churchbridge-to-washbrook-lane-west-midlands-footway-widening\">A5 Churchbridge to Washbrook Lane, West Midlands: Footway widening<\/h2>\n<p>The eastbound carriageway will be closed overnight between 8pm and 6am from 7 December until 13 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5-mancetter-island-west-midlands-column-installation\">A5 Mancetter Island, West Midlands: Column installation<\/h2>\n<p>The carriageway will be closed in both directions overnight for one night from 8pm 7 December until 5am the following morning (8 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50-meir-tunnel-west-midlands-maintenance-works\">A50 Meir Tunnel, West Midlands: Maintenance works<\/h2>\n<p>The carriageway will be closed in both directions overnight for two nights between 8pm and 5.30am from 9 December until 11 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--a5006-campbell-road-over-the-a500-west-midlands-bridge-inspections\">A500 \/ A5006 Campbell Road (over the A500), West Midlands: Bridge inspections<\/h2>\n<p>The carriageway will be closed in both directions overnight for two nights between 10pm and 6am from 7 December until 9 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-1-entry-slip-west-midlands-routine-maintenance\">M42 junction 1 entry slip, West Midlands: Routine maintenance<\/h2>\n<p>The northbound entry slip will be closed overnight for one night from 10pm 7 December until 5am the following morning (8 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-2-entry-slip-west-midlands-routine-maintenance\">M42 junction 2 entry slip, West Midlands: Routine maintenance<\/h2>\n<p>The southbound entry slip will be closed overnight for one night from 10pm 7 December until 5am the following morning (8 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-2-entry-slip-west-midlands-routine-maintenance-1\">M42 junction 2 entry slip, West Midlands: Routine maintenance<\/h2>\n<p>The northbound entry slip will be closed overnight for one night from 10pm 8 December until 5am the following morning (9 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-2-exit-slip-west-midlands-routine-maintenance\">M42 junction 2 exit slip, West Midlands: Routine maintenance<\/h2>\n<p>The southbound entry slip will be closed overnight for one night from 10pm 8 December until 5am the following morning (9 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-2-exit-slip-west-midlands-routine-maintenance-1\">M42 junction 2 exit slip, West Midlands: Routine maintenance<\/h2>\n<p>The northbound exit slip will be closed overnight for one night from 10pm 9 December until 5am the following morning (10 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-3-entry-slip-west-midlands-routine-maintenance\">M42 junction 3 entry slip, West Midlands: Routine maintenance<\/h2>\n<p>The southbound entry slip will be closed overnight for one night from 10pm 9 December until 5am the following morning (10 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-3-exit-slip-west-midlands-routine-maintenance\">M42 junction 3 exit slip, West Midlands: Routine maintenance<\/h2>\n<p>The northbound exit slip will be closed overnight for one night from 10pm 10 December until 5am the following morning (11 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42-junction-8-to-junction-7-west-midlands-gantry-works\">M42 junction 8 to junction 7, West Midlands: Gantry works<\/h2>\n<p>The southbound link to M6 south link will be closed overnight for one night from 10pm 10 December until 5am the following morning (11 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-5-exit-slip-west-midlands-junction-improvement-works\">M5 junction 5 exit slip, West Midlands: Junction improvement works<\/h2>\n<p>The southbound exit slip will be closed overnight between 8pm and 6am from 7 November until 13 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-5-slip-roads-west-midlands-mobilisation-in-advance-of-scheme\">M5 junction 5 slip roads, West Midlands: Mobilisation in advance of scheme<\/h2>\n<p>The slip roads will be closed in both directions overnight between 8pm and 6am from 7 December until 13 December. A diversion route will be clearly signposted. <\/p>\n<h2 id=\"m5-junction-6-slip-roads-west-midlands-mobilisation-in-advance-of-scheme\">M5 junction 6 slip roads, West Midlands: Mobilisation in advance of scheme<\/h2>\n<p>The slip roads will be closed in both directions overnight between 8pm and 6am from 7 December until 13 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-5-to-junction-4a-west-midlands-removal-of-permanent-roads-studs\">M5 Junction 5 to Junction 4a, West Midlands: Removal of permanent roads studs<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 7am from 7 December until 10 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-4a-west-midlands-removal-of-permanent-roads-studs\">M5 Junction 4a, West Midlands: Removal of permanent roads studs<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 7am from 9 December until 11 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5-junction-1-entry-slip-west-midlands-repairs-to-signals\">M5 Junction 1 entry slip, West Midlands: Repairs to signals<\/h2>\n<p>The northbound entry slip will be closed overnight for one night from 10pm 9 December until 5am the following morning (10 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54-junction-1-entry-slips-west-midlands-barrier-repairs\">M54 Junction 1 entry slips, West Midlands: Barrier repairs<\/h2>\n<p>The entry slips will be closed in both directions overnight for one night from 8pm 9 December until 6am the following morning (10 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54-junction-4-to-junction-3-west-midlands-concrete-barrier-repairs\">M54 junction 4 to junction 3, West Midlands: Concrete barrier repairs<\/h2>\n<p>The eastbound carriageway will be closed overnight for two nights between 8pm and 6am from 11 December until 13 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6-junction-9-entry-slipwestern-arm-south-west-midlands-re-waterproofing--structural-repairs\">M6 junction 9 entry slip\/Western Arm South, West Midlands: Re-waterproofing &amp; structural repairs<\/h2>\n<p>There will be a full 24hour southbound entry slip closure ongoing until Christmas. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6-junction-16-to-junction-15-west-midlands-resurfacing-works\">M6 junction 16 to junction 15, West Midlands: Resurfacing works<\/h2>\n<p>The southbound carriageway will be closed overnight between 9.30pm and 6am from 7 December until 11 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6-junction-2-entry-slip-west-midlands-bridge-inspection\">M6 junction 2 entry slip, West Midlands: Bridge inspection<\/h2>\n<p>The southbound entry slip will be closed overnight for one night from 9pm 9 December until 6am the following morning (10 December). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m69-junction-1-to-m6-junction-2-west-midlands-carriageway-resurfacing\">M69 junction 1 to M6 junction 2, West Midlands: Carriageway resurfacing<\/h2>\n<p>The carriageway will be closed in both directions overnight between 9pm and 6am from 7 December until 13 December. A diversion route will be clearly signposted. <\/p>\n<h2 id=\"m69-northbound-link-from-m6-junction-2-southbound-west-midlands-carriageway-resurfacing\">M69 northbound link from M6 junction 2 southbound, West Midlands: Carriageway resurfacing<\/h2>\n<p>The carriageway will be closed overnight between 8pm and 6am from 8 December until 10 December. A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 4 December 2015 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/65073"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=65073"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/65073\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=65073"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=65073"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=65073"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}