{"id":65706,"date":"2015-12-18T13:20:35","date_gmt":"2015-12-18T13:20:35","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=14f0fd508deac7334e6dd601203828dc"},"modified":"2015-12-18T13:20:35","modified_gmt":"2015-12-18T13:20:35","slug":"press-release-planned-roadworks-in-bristol-gloucestershire-somerset-banes-wiltshire-west-dorset-and-devon-weekly-summary-for-monday-21-december-to-sunday-27-december-2015","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=65706","title":{"rendered":"Press release: Planned roadworks in Bristol, Gloucestershire, Somerset, BANES, Wiltshire, West Dorset and Devon: weekly summary for Monday 21 December to Sunday 27 December 2015"},"content":{"rendered":"<div class=\"govspeak\">\n<h2 id=\"bristol\">Bristol<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"gloucestershire\">Gloucestershire<\/h2>\n<h3 id=\"m5-junction-13---15-drainage-works\">M5 junction 13 &#8211; 15: drainage works<\/h3>\n<p>Narrow lanes with 50mph speed restrictions will be in place on the southbound and northbound carriageway until March 2016.<\/p>\n<h3 id=\"m5-junction-14---12-bridge-maintenance\">M5 junction 14 &#8211; 12: bridge maintenance<\/h3>\n<p>Narrow lanes with 50mph speed restrictions will be in place on northbound carriageway until October 2016.<\/p>\n<h3 id=\"a40-huntley-traffic-signal-renewals\">A40 Huntley: traffic signal renewals<\/h3>\n<p>24 hour multiway lights in operation from 6am on 23 November until 6pm on 8 January 2016.<\/p>\n<h2 id=\"wiltshire\">Wiltshire<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"north-somerset\">North Somerset<\/h2>\n<p>No planed works<\/p>\n<h2 id=\"somerset\">Somerset<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"banes\">BANES<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"west-dorset\">West Dorset<\/h2>\n<p>No planned works.<\/p>\n<h2 id=\"devon-m5-only\">Devon (M5 only)<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"hampshire\">Hampshire<\/h2>\n<p>No planned works<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of the above date but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/65706"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=65706"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/65706\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=65706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=65706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=65706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}