{"id":68207,"date":"2016-03-04T11:57:35","date_gmt":"2016-03-04T11:57:35","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=d27376ed93f9985b2900aa19a15d148b"},"modified":"2016-03-04T11:57:35","modified_gmt":"2016-03-04T11:57:35","slug":"press-release-planned-roadworks-in-bristol-gloucestershire-somerset-banes-wiltshire-west-dorset-and-devon-weekly-summary-for-monday-7-march-to-sunday-13-march-2016","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=68207","title":{"rendered":"Press release: Planned roadworks in Bristol, Gloucestershire, Somerset, BANES, Wiltshire, West Dorset and Devon: weekly summary for Monday 7 March to Sunday 13 March 2016"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of the above date but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"bristol\">Bristol<\/h2>\n<h3 id=\"m32-junction-1-to-2-metro-bus-scheme-bristol-city-council-work\">M32 junction 1 to 2: Metro Bus Scheme (Bristol City Council work)<\/h3>\n<p>There will be narrow lanes with 50mph speed restrictions in operation northbound and southbound until the end of September 2016.<\/p>\n<h3 id=\"m5-junction-18a-to-17-hallen-hill-drainage-and-carriageway-repairs\">M5 junction 18a to 17 (Hallen Hill): drainage and carriageway repairs<\/h3>\n<p>There will be three narrow lanes in operation on northbound carriageway during the day with overnight full closure from 9pm until 6am on 20 March. The diversion will be clearly signposted. <\/p>\n<h3 id=\"m4-second-severn-crossing-structural-work\">M4 Second Severn Crossing: structural work<\/h3>\n<p>A full eastbound closure will take place from 8pm on 10 March until 6am the following morning.  The diversion will be clearly signposted.<\/p>\n<h2 id=\"gloucestershire\">Gloucestershire<\/h2>\n<h3 id=\"m5-junction-13-to-15-drainage-work\">M5 junction 13 to 15: drainage work<\/h3>\n<p>Narrow lanes with 50mph speed restrictions will be in place on the southbound and northbound carriageway until April 2016.<\/p>\n<h3 id=\"m5-junction-14-to-12-bridge-maintenance\">M5 junction 14 to 12: bridge maintenance<\/h3>\n<p>Narrow lanes with 50mph speed restrictions will be in place on the southbound and northbound carriageway until February 2017.<\/p>\n<h3 id=\"m5-junction-11a-surveying\">M5 junction 11A: surveying<\/h3>\n<p>The northbound exit slip road will be closed from 8pm on 10 March until 6am the following morning.  The diversion will be clearly signposted.<\/p>\n<h3 id=\"a417-zoons-court-roundabout-to-business-park-roundabout-resurfacing\">A417 Zoons Court Roundabout to Business Park Roundabout: resurfacing<\/h3>\n<p>The eastbound carriageway will be closed nightly from 8pm on 7 March until 6am on 9 March. Diversion will be clearly signposted.<\/p>\n<h3 id=\"a417-zoons-court-roundabout-to-business-park-roundabout-resurfacing-1\">A417 Zoons Court Roundabout to Business Park Roundabout: resurfacing<\/h3>\n<p>The westbound carriageway will be closed nightly from 8pm on 8 March until 6am on 10 March. The diversion will be clearly signposted.<\/p>\n<h2 id=\"wiltshire\">Wiltshire<\/h2>\n<h3 id=\"m4-junction-16-to-17-embankment-works\">M4 junction 16 to 17: embankment works<\/h3>\n<p>Narrow lanes with 50mph speed restrictions will be in place on the westbound carriageway until mid-March.  <\/p>\n<h3 id=\"a303-mere-to-zeals-resurfacing\">A303 Mere to Zeals: resurfacing<\/h3>\n<p>There will be a full closure of slip roads nightly between 8pm on 9 March until 6am on 12 March. The diversions will be clearly signposted.<\/p>\n<h3 id=\"a36-wolverton-to-beckington-white-lining\">A36 Wolverton to Beckington: white lining<\/h3>\n<p>The carriageway will be closed nightly from 9pm on 7 March until 6am on 10 March.  The diversion will be clearly signposted.<\/p>\n<h3 id=\"a36-beckington-a361-junction-to-a350-junction-white-lining\">A36 Beckington (A361 junction to A350 junction): white lining<\/h3>\n<p>The carriageway will be closed nightly from 9pm on 10 March until 6am on 12 March.  The diversion will be clearly signposted.<\/p>\n<h2 id=\"north-somerset\">North Somerset<\/h2>\n<h3 id=\"m5-junction-21-surveys\">M5 junction 21: surveys<\/h3>\n<p>The northbound entry slip road will be closed nightly from 8pm on 7 March until 6am on 12 March.  The diversion will be clearly signposted.<\/p>\n<h2 id=\"somerset\">Somerset<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"banes\">BANES<\/h2>\n<h3 id=\"a36-limpley-stoke-third-party-works--wales-and-west-utilities\">A36 Limpley Stoke: third party works \u2013 Wales and West Utilities<\/h3>\n<p>24\/7 traffic signals will be in operation until mid-March.<\/p>\n<h2 id=\"west-dorset\">West Dorset<\/h2>\n<p>No planned works.<\/p>\n<h2 id=\"devon\">Devon<\/h2>\n<p>No planned works<\/p>\n<h2 id=\"hampshire\">Hampshire<\/h2>\n<p>No planned works<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/68207"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=68207"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/68207\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=68207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=68207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=68207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}