{"id":70057,"date":"2016-04-29T09:40:20","date_gmt":"2016-04-29T09:40:20","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=1b014dc1798ec0acc8eb08b89c164009"},"modified":"2016-04-29T09:40:20","modified_gmt":"2016-04-29T09:40:20","slug":"press-release-planned-road-works-in-west-midlands-weekly-summary-for-monday-2-may-2016-to-sunday-8-may-2016","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=70057","title":{"rendered":"Press release: Planned road works in West Midlands: weekly summary for  Monday 2 May 2016 to Sunday 8 May 2016"},"content":{"rendered":"<div class=\"govspeak\">\n<h2 id=\"a38--branston-to-y-pass-junction-bridge-repairs\">A38 \u2013 Branston to Y Pass Junction: bridge repairs<\/h2>\n<p>The northbound carriageway will be closed overnight for one night from 8pm 5 May until 6am the following morning (6 May). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--junction-6-roundabout-carriageway-inspections\">A449 \u2013 junction 6 roundabout: carriageway inspections<\/h2>\n<p>The roundabout will be closed overnight between 8pm and 6am from 3 May until 5 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--junction-6-roundabout-carriageway-inspections-1\">A449 \u2013 junction 6 roundabout: carriageway inspections<\/h2>\n<p>The roundabout will be closed overnight for one night from 8pm 5 May until 6am the following morning (6 May). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--chesford-interchange-slip-roads-installation-of-traffic-management\">A46 \u2013 Chesford Interchange slip roads: installation of traffic management<\/h2>\n<p>The slip roads will be closed overnight between 9pm and 5.30am from 2 May until 4 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--stoneleigh-slip-roads-installation-of-traffic-management\">A46 \u2013 Stoneleigh slip roads: installation of traffic management<\/h2>\n<p>The slip roads will be closed overnight for one night from 9pm 5 May until 5.30am the following morning (6 May). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-to-a500-signing-and-lining-scheme\">A50 \u2013 Heron Cross to A500: signing and lining scheme<\/h2>\n<p>The westbound carriageway will be closed overnight for one night from 8pm 5 May until 5.30am the following morning (6 May). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-7a-to-junction-8-carriageway-resurfacing\">M42 \u2013 junction 7a to junction 8: carriageway resurfacing<\/h2>\n<p>The northbound carriageway will be closed overnight between 10pm and 5am from 5 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-slip-road-to-a45-carriageway-works\">M42 \u2013 junction 6 slip road to A45: carriageway works<\/h2>\n<p>The slip road will be closed overnight for one night from midnight on 8 May until 8am that morning (8 May). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-carriageway-works\">M50 \u2013 junction 2: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 7pm and 7am from 3 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-carriageway-works-1\">M50 \u2013 junction 2: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 7pm and 7am from 3 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-3-to-junction-2-carriageway-inspections\">M54 \u2013 junction 3 to junction 2: carriageway inspections<\/h2>\n<p>The eastbound carriageway will be closed overnight between 9pm and 5am from 2 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-1-to-m6-drainage-works\">M54 \u2013 junction 1 to M6: drainage works<\/h2>\n<p>The westbound carriageway will be closed overnight between 9pm and 6am from 3 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-1-including-entry-slip-road-to-m6-junction-10a-electrical-works\">M54 \u2013 junction 1 including entry slip road to M6 junction 10A: electrical works<\/h2>\n<p>The eastbound carriageway including the entry slip road will be closed overnight for one night from 10.30pm 3 May until 5am the following morning (4 May). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6---junction-5-entry-slip-road-viaduct-repairs\">M6 &#8211; junction 5 entry slip road: viaduct repairs<\/h2>\n<p>The southbound entry slip road will be closed for 24 hours ongoing from 11 January until 30 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-to-junction-8-including-the-slip-roads-carriageway-resurfacing\">M6 \u2013 junction 10 to junction 8 including the slip roads: carriageway resurfacing<\/h2>\n<p>The southbound carriageway including associated slip roads will be closed overnight between 9pm and 6am from 5 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-13-to-junction-12-including-junction-13-entry-slip-and-junction-12-exit-slip-road-carriageway-resurfacing\">M6 \u2013 junction 13 to junction 12 including junction 13 entry slip and junction 12 exit slip road: carriageway resurfacing<\/h2>\n<p>The southbound carriageway including the entry and exit slip roads will be closed overnight between 10pm and 8am from 2 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-3a-link-to-m42-junction-8-carriageway-resurfacing\">M6 \u2013 junction 3a link to M42 junction 8: carriageway resurfacing<\/h2>\n<p>The northbound link road will be closed overnight between 10pm and 5am from 2 May until 5 May. A diversion route will be clearly signposted<\/p>\n<h2 id=\"m6--junction-4a-to-junction-4-electrical-works\">M6 \u2013 junction 4a to junction 4: electrical works<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 10pm 3 May until 5am the following morning (4 May). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m69--junction-1-entry-slip-road-carriageway-resurfacing\">M69 \u2013 junction 1 entry slip road: carriageway resurfacing<\/h2>\n<p>The southbound slip road will be closed overnight between 8pm and 6am from 3 May until 8 May. A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/70057"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=70057"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/70057\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=70057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=70057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=70057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}