{"id":70870,"date":"2016-05-24T15:36:55","date_gmt":"2016-05-24T15:36:55","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=4326c5ba352fe6d4b19e59c23389f860"},"modified":"2016-05-24T15:36:55","modified_gmt":"2016-05-24T15:36:55","slug":"press-release-nearly-600-miles-of-roadworks-removed-for-late-may-getaway","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=70870","title":{"rendered":"Press release: Nearly 600 miles of roadworks removed for late May getaway"},"content":{"rendered":"<div class=\"govspeak\">\n<p>Parents may not be able to rely on the British weather for bank holiday fun, but Highways England hopes it can help make the break better for all drivers as it lifts roadworks from Friday.<\/p>\n<p>Highways England aims to complete or lift 188 sets of roadworks from Friday 27 May \u2013 leaving 97.4% of its 9,534 mile network free of roadworks in time for the holidays. <a rel=\"external\" href=\"https:\/\/drive.google.com\/open?id=1iHjmhmf5bi-V176LhKVaBch1vws&amp;usp=sharing\">A map showing the locations of lifted and completed schemes<\/a> is available to view.<\/p>\n<p>The government is investing \u00a315 billion to deliver the biggest upgrade to motorways and major A-roads in a generation. Building new roads and creating smart motorways that keep traffic moving even in the busiest periods will cut congestion.<\/p>\n<p>Highways England is delivering the upgrade and taking action now to reduce delays over this bank holiday break.<\/p>\n<p>Key schemes which are being completed include 2.5 miles of repairs at junction 15 near Heathrow and six miles of work on the M6 southbound near Penkridge between junctions 13 and 12.<\/p>\n<p>In addition, work on the M23 between junctions 9 and 11 near Gatwick is being stopped for the break.<\/p>\n<p>Roads Minister Andrew Jones said:<\/p>\n<blockquote>\n<p>We are delivering the biggest improvement to roads since the 1970s to improve journeys for drivers in the busiest periods and to create new capacity.<\/p>\n<p class=\"last-child\">We do not want work to stand in the way of families during their bank holiday getaway, so I am pleased roadworks are being removed at so many locations.<\/p>\n<\/blockquote>\n<p>Highways England Director of Operations, Mike Wilson, said:<\/p>\n<blockquote>\n<p>This May bank holiday, we\u2019re helping drivers with their journeys by clearing roadworks across the majority of motorways and major A-roads in England.<\/p>\n<p>As a parent, I know all too well how challenging a long journey with young children especially can be, so we\u2019re keen to do what we can do to help families enjoy the late spring break.<\/p>\n<p>We\u2019ve worked closely with other transport providers to ensure our network can cope with increased demand.<\/p>\n<p class=\"last-child\">Of course, we still advise drivers to plan their journeys, check the latest traffic and travel updates, and the weather forecast, before setting out.<\/p>\n<\/blockquote>\n<p>People travelling with caravans and trailers are also urged to check their vehicles before they take to the roads for the first time this year \u2013 especially their tyres, to ensure they are not worn or damaged \u2013 to help avoid a potential breakdown or incident and help keep traffic flowing.<\/p>\n<p>Highways England will complete 405 miles of roadworks at 136 locations before the bank holiday.<\/p>\n<p>A further 52 sets of roadworks and lane restrictions will be removed across 184 miles of carriageway by 6am on Friday 27 May, until just after midnight on Tuesday 31 May.<\/p>\n<p>By suspending or completing roadworks, more lanes will be open and many of the associated speed restrictions will be lifted.<\/p>\n<p>For the safety of drivers and their passengers, lane restrictions or temporary speed limits will need to remain at 56 locations.<\/p>\n<p>During the holidays, people may travel further and on unfamiliar roads. For advice about driving on smart motorways, <a href=\"http:\/\/www.gov.uk\/guidance\/how-to-drive-on-a-smart-motorway\">visit the smart motorways guidance page<\/a>. Drivers planning to use the Dartford Crossing are reminded to pay Dart Charge in advance or by midnight the day after crossing.<\/p>\n<p>Drivers can get the <a rel=\"external\" href=\"http:\/\/www.trafficengland.com\/\">latest travel information from Traffic England<\/a>.<\/p>\n<p>The full list of schemes which will be completed and lifted over the late May bank holiday period is as follows:<\/p>\n<h2 id=\"completed\">Completed<\/h2>\n<p>Stinsford Roundabout to Bere Regis Roundabout (near Tolpuddle)<br \/>\nSurfacing and associated maintenance<br \/>\n20 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M4\/M5 Almondsbury Interchange (near Almondsbury)<br \/>\nTechnology maintenance<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M5 junction 30 (near Exeter)<br \/>\nDeflectograph and coring works<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A46 Cold Ashton &#8211; London Rd roundabout (near Bath)<br \/>\nLoop cutting<br \/>\n4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A303\/A36 Deptford Interchange (near Deptford)<br \/>\nDeflectograph surveys<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>Turnpike to Cricklade (near Swindon &amp; Cricklade)<br \/>\nCyclic maintenance<br \/>\n4.15 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>Cricklade to Lady Lane (near Swindon &amp; Cricklade)<br \/>\nCyclic maintenance<br \/>\n3.9 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>Cricklade to Spine Road (near Cricklade &amp; Cirencester)<br \/>\nCyclic maintenance<br \/>\n3.55 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>Spine Road to Cricklade  (near Cricklade &amp; Cirencester)<br \/>\nCyclic maintenance<br \/>\n3.85 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>Spine Road to Burford Road (near Cirencester)<br \/>\nCyclic maintenance<br \/>\n4.8 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>Burford Road to Spine Road (near Cirencester)<br \/>\nCyclic maintenance<br \/>\n4.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A46 junction to Air Balloon Roundabout (near Cheltenham &amp; Gloucester)<br \/>\nCyclic maintenance<br \/>\n2.55 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>Air Balloon Roundabout to A46 junction (near Cheltenham &amp; Gloucester)<br \/>\nCyclic maintenance<br \/>\n2.4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A2 Lydden (near Canterbury)<br \/>\nLitter clearance<br \/>\n23 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A2 Jubilee Way (near Dover)<br \/>\nLighting repair works<br \/>\n1.3 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A249 Stockbury (near Medway)<br \/>\nWhite lining<br \/>\n8.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A259 Rye (near Rye)<br \/>\nLighting investigation<br \/>\n1.2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A27 Polegate (near Polegate)<br \/>\nWind farm construction<br \/>\n1.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A27 Lancing (near Lancing)<br \/>\nRoutine tunnel investigations<br \/>\n1.4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M20 junction 4 to junction 7 (near Maidstone)<br \/>\nCarriageway investigations<br \/>\n5.2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 27 to junction 28 (near Brentwood)<br \/>\nCarriageway repairs<br \/>\n10.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M11 junction 6 to junction 6<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 M11 southbound to M25 clockwise link (near Epping)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M11 junction 5 to junction 6 (near Chigwell)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 M11 northbound to M25 clockwise link (near Chigwell)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A282 DRC East Tunnel (near Dartford)<br \/>\nStructure &#8211; new\/reconstruction<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction16 to junction15 (near Gerrards Cross)<br \/>\nCarriageway repairs<br \/>\n2.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 M40 westbound link to M25 anticlockwise (near Gerrards Cross)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 M40 eastbound link to M25 anticlockwise (near Gerrards Cross)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 15 (near Heathrow)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 junction 6 to junction 5 (near Watford)<br \/>\nCarriageway repairs<br \/>\n1.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 junction 6 to junction 5 (near Watford)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 20 exit slip road (near Kings Langley)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 8 to junction 9 (near Leatherhead)<br \/>\nElectrical works<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 9 to junction 8 (near Leatherhead)<br \/>\nElectrical works<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 11 to junction 10 (near Chertsey)<br \/>\nCarriageway repairs<br \/>\n3 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 11 anticlockwise entry slip (near Chertsey)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 11 to junction 10 (near Chertsey)<br \/>\nCarriageway repairs<br \/>\n3 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 12 to junction 10 (near Chertsey)<br \/>\nCarriageway repairs<br \/>\n2.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 junction 2 entry slip road northbound (near Hendon)<br \/>\nConstruction &#8211; improvement\/upgrading<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 junction 1 to MSA (near Hendon)<br \/>\nStructure maintenance<br \/>\n1.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 MSA to junction 1 (near Hendon)<br \/>\nStructure maintenance<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A2 TfL to A2018 (near Bexley)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A2 A2018 entry slip road (near Bexley)<br \/>\nCarriageway repairs<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 18 to junction 16 (near Rickmansworth)<br \/>\nWhite lining\/road markings<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 (near Heathrow)<br \/>\nWhite lining\/road markings<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 15 to junction 16 (near Uxbridge)<br \/>\nWhite lining\/road markings<br \/>\n1.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 15 to junction 16 (near Uxbridge)<br \/>\nWhite lining\/road markings<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 24 to junction 25 (near Potters Bar)<br \/>\nElectrical works<br \/>\n1.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 27 to junction 26 (near Epping)<br \/>\nElectrical works<br \/>\n1.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 6 to junction 5 (near Godstone)<br \/>\nElectrical works<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M25 junction 30 to junction 29 (near Romford)<br \/>\nSigns &#8211; maintenance<br \/>\n2.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1\/B1041 junction (near St Neots)<br \/>\nSafety barrier renewal<br \/>\n3 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A421 (near various)<br \/>\nGrass cutting under mobile lane closures<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 (near various)<br \/>\nGrass cutting under mobile lane closures<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 (near various)<br \/>\nGrass cutting under mobile lane closures<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A428 (near various)<br \/>\nGrass cutting under mobile lane closures<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1M (near various)<br \/>\nGrass cutting under mobile lane closures<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M11 junction 11 to junction 13 (near Cambridge)<br \/>\nGeneral bridge inspection<br \/>\n3 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M11 junction 11 to junction 13 (near Cambridge)<br \/>\nGeneral bridge inspection<br \/>\n3 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 (near Peterborough)<br \/>\nCarriageway resurfacing<br \/>\n0.8 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A11 (near various)<br \/>\nGrass cutting under mobile lane closures<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M11 junction 14 to junction 9 (near Cambridge)<br \/>\nGrass cutting under mobile lane closures<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 (near Peterborough)<br \/>\nCarriageway resurfacing<br \/>\n8 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A12 junction 29 (near Colchester)<br \/>\nEmbankment stabilisation works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A414 (near St Albans)<br \/>\nGrass cutting under mobile lane closures<br \/>\n6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1\/B1081 (near Stamford)<br \/>\nCarriageway resurfacing<br \/>\n5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 Wittering (near Peterborough)<br \/>\nInspection\/survey<br \/>\n4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A14 junction 55 to junction 56 (near Ipswich)<br \/>\nGeneral bridge inspection<br \/>\n4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A14 junction 57 to junction 56 (near Ipswich)<br \/>\nGeneral bridge inspection<br \/>\n4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A14 junction 58 to junction 57 (near Ipswich)<br \/>\nGeneral bridge inspection<br \/>\n4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A14 junction 57 to junction 58 (near Ipswich)<br \/>\nGeneral bridge inspection<br \/>\n4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A5 (near Dunstable)<br \/>\nImprovement works<br \/>\n0.1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A47 junction 19 to junction 20 (near Peterborough)<br \/>\nCarriageway resurfacing<br \/>\n10 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A47 junction 15 (near Peterborough)<br \/>\nCarriageway resurfacing<br \/>\n0.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A47 junction 16 to junction 17 (near Peterborough)<br \/>\nCarriageway resurfacing<br \/>\n1.2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A47 junction 20 (near Peterborough)<br \/>\nCarriageway resurfacing<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M40 junction 3 to junction 4 (near High Wycombe)<br \/>\nMessage sign renewal<br \/>\n2.4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A428 (near Cambridge)<br \/>\nEmbankment repairs to Cambridge Rd Bridge<br \/>\n3 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A14  junction 31 to 34 (near Cambridge)<br \/>\nSafety barrier renewal<br \/>\n7.25 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 junction 19 to junction 24 (near Leicester)<br \/>\nHorticultural works<br \/>\n5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 junction 20 to 19 (near Rugby)<br \/>\nBridge inspection<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M1 junction 15a (near Northampton)<br \/>\nBridge inspection<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 Newark on Trent &#8211; Apleyhead (near Newark on Trent)<br \/>\nCarriageway repair<br \/>\n2.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A5 Catthorpe (near Rugby)<br \/>\nBridge inspection<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A5 Magna Park &#8211; Wibtoft (near Rugby)<br \/>\nCarriageway repair<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A5 M69 Roundabout (near Nuneaton)<br \/>\nCarriageway repair<br \/>\n1.25 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A14 junction 1 to junction 13 (near Kettering)<br \/>\nElectrical works<br \/>\n5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A38 junction 28 (M1) &#8211; Burnaston (near Derby)<br \/>\nHorticultural works<br \/>\n5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A45 Wilby Way to Skew Bridge (near Wellingborough)<br \/>\nCarriageway improvements<br \/>\n0.25 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A46 Newark on Trent (near Newark on Trent)<br \/>\nBridge works<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 North Hykeham &#8211; Swinderby (near Lincoln)<br \/>\nCarriageway repair<br \/>\n2.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A46 Willoughby on the Wolds (near Loughborough)<br \/>\nBridge inspection<br \/>\n3.75 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A46 junction 21 (M1) &#8211; Widmerpool (near Leicester)<br \/>\nHorticultural works<br \/>\n5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A52 Saxondale &#8211; Barrowby (near Grantham)<br \/>\nCarriageway repair<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M6 southbound junction 13 to junction 12 (near Penkridge)<br \/>\nResurfacing of existing carriageway and new road markings and studs.<br \/>\n6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M6 junction 38 (near Tebay)<br \/>\nGround investigation work<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M6 junction 42 (near Carlisle)<br \/>\nPre-design surveys\/Coring works<br \/>\n1.4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Cockermouth)<br \/>\nRaising of the carriageway profile and improvement of carriageway drainage<br \/>\n3.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Keswick)<br \/>\nCarriageway upgrade works<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Kirkby Thore)<br \/>\nInstallation of safety improvements<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Brough)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Penrith)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Brough)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Brough)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Brough)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 (near Kirkby Thore)<br \/>\nDeflectograph survey works<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A590 (near Lindale)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A590 (near Lindale)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M55 junction 1 (near Broughton)<br \/>\nDeflectograph survey works<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M55 junction 3 to junction 4 (near Wesham)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M55 junction 1to junction 3 (near Kirkham)<br \/>\nDeflectograph survey works<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M55 junction 1 (near Broughton)<br \/>\nReplacing gantry mounted Variable Message Signs<br \/>\n2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1M junction 38 to junction 37 (near Doncaster)<br \/>\nBarrier renewal<br \/>\n1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A64 Hopgrove (near York)<br \/>\nPavement patching renewal<br \/>\n2.4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A64 Barton to Whitwell (near York)<br \/>\nPavement patching renewal<br \/>\n1.2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M18 junction 4 to junction 5 (near Doncaster)<br \/>\nBoundary fence renewal<br \/>\n2.4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M18 junction 6 to junction 7 (near Doncaster)<br \/>\nGantry renewals<br \/>\n7.2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M18 junction 2 (near Doncaster)<br \/>\nGantry renewals<br \/>\n0.4 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M18 junction 4 to junction 3 (near Doncaster)<br \/>\nBridge waterproofing works<br \/>\n0.7 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M181 Frodingham to Midmoor (near Scunthorpe)<br \/>\nPavement patching renewal<br \/>\n5.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M62 junction 24 to junction 25 (near Huddersfield)<br \/>\nDrainage works<br \/>\n2.9 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M62 junction 36 to junction 35 (near Goole)<br \/>\nPavement patching renewal<br \/>\n2.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M62 junction 34 (near Doncaster)<br \/>\nPavement patching renewal<br \/>\n2.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M62 junction 32 to junction 31 (near Castleford)<br \/>\nBoundary fence renewal<br \/>\n0.2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M62 junction 32 to junction 31 (near Castleford)<br \/>\nBridge works<br \/>\n0.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>M62 junction 31 (near Castleford)<br \/>\nResurfacing renewal<br \/>\n1.7 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 Eaglescliffe to Yarm Road (near Stockton on Tees)<br \/>\nPavement investigations<br \/>\n5.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 Neasham Road Interchange (near Darlington)<br \/>\nElectrical work<br \/>\n0.1 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A66 Cumbrian Border to Scotch Corner (near Barnard Castle)<br \/>\nSurveys<br \/>\n16 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 Birtley (near Gateshead)<br \/>\nElectrical work<br \/>\n1.6 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 Gateshead Western Bypass (near Gateshead)<br \/>\nInspections<br \/>\n15 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 North Brunton Interchange (near Newcastle Upon Tyne)<br \/>\nResurfacing<br \/>\n0.5 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 Felton to Denwick (near Alnwick)<br \/>\nInspections<br \/>\n19 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 Felton (near Alnwick)<br \/>\nPavement investigations<br \/>\n1.2 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<p>A1 Alnwick (near Alnwick)<br \/>\nStructural refurbishment<br \/>\n6.7 mile(s) of roadworks completed for Spring Bank Holiday period.<\/p>\n<h2 id=\"lifted\">Lifted<\/h2>\n<p>A38 Plympton (near Plymouth)<br \/>\nBridge replacement<br \/>\n1.9 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A21 Tonbridge (near Tonbridge)<br \/>\nBridge reinstatement<br \/>\n6.43 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A27 Westhampnett (near Arundel)<br \/>\nCarriageway resurfacing<br \/>\n2.4 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M2 junction 5 (near Medway)<br \/>\nBearing replacement<br \/>\n31 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M23 junction 9 (near Crawley)<br \/>\nSign installation<br \/>\n21 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M23 junction 9 to junction 11 (near Crawley)<br \/>\nCarriageway resurfacing<br \/>\n18 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M23 junction 10 to junction 11 southbound (near Crawley)<br \/>\nCarriageway resurfacing<br \/>\n2.7 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Yarmouth Road<br \/>\nBentley Drive\/Leisure Way roundabout (near Lowestoft)<br \/>\nLighting column upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Yarmouth Road &#8211; Station Road to Gunton St Peters Avenue (near Lowestoft)<br \/>\nLighting column upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Yarmouth Road &#8211; Station Road to Gunton St Peters Avenue (near Lowestoft)<br \/>\nRemoval of existing anti parking measures along the eastern footway. Resurfacing, signing and lighting column upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Yarmouth Road &#8211; Station Road to Gunton St Peters Avenue (near Lowestoft)<br \/>\nRemoval of existing anti parking measures along the eastern footway. Resurfacing, signing and lighting column upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Camden Street High Street (near Lowestoft)<br \/>\nLighting column upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Camden Street High Street (near Lowestoft)<br \/>\nLighting column upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Jubilee Way &#8211; St Peters Street roundabout &#8211; Compass Street (near Lowestoft)<br \/>\nLighting column upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Jubilee Way &#8211; St Peters Street roundabout &#8211; Compass Street (near Lowestoft)<br \/>\nLighting column upgrading works<br \/>\n5 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>Katwijk Way,<br \/>\nSt Peter street roundabout to Milton Road East (near Lowestoft)<br \/>\nInstallation of a new toucan crossing &amp; widen the existing footway on St Peters Street to create a shared use cycle path. Install a shared use cycleway to Katwijk Way east verge<br \/>\n0.5 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>Katwijk Way,<br \/>\nSt Peter street roundabout to Milton Road East (near Lowestoft)<br \/>\nInstallation and removal of street Lighting columns &amp; white lining<br \/>\n0.5 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Artillary Way &#8211; St Peters St roundabout to Whapload Road roundabout (near Lowestoft)<br \/>\nLighting column &amp; traffic signal upgrading works<br \/>\n0.3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A12 Artillary Way &#8211; St Peters St roundabout to Whapload Road roundabout (near Lowestoft)<br \/>\nLighting column &amp; traffic signal upgrading works<br \/>\n0.3mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A14\/A1307 Girton, Huntigndon Rd bridge (near Cambridge )<br \/>\nResurfacing &amp; joint repairs.<br \/>\n0.75 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A14WB junction 33 Geo Repairs (near Cambridge)<br \/>\nEmbankment repairs<br \/>\n1.75 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A14 eastbound to junction 31 Grange Farm Geo repairs (near Cambridge)<br \/>\nEmbankment repairs<br \/>\n0.75 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M1 junction 22 (near Leicester)<br \/>\nCarriageway improvements<br \/>\n0.75 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M1 junction 24a to junction 25 (near Derby)<br \/>\nBridge works<br \/>\n3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M6 junction 1 to junction 19 (M1) (near Rugby)<br \/>\nCarriageway sweeping<br \/>\n3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M45 Dunchurch to junction 17 (M1) (near Rugby)<br \/>\nCarriageway resurfacing<br \/>\n2.5mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A1 Little Ponton-Colsterworth (near Grantham)<br \/>\nTechnology works<br \/>\n1 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A42 (near Ashby-de-la-Zouch)<br \/>\nHorticulture<br \/>\n3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A43 Abthorpe Roundabout (near Towcester)<br \/>\nCarriageway improvements<br \/>\n0.75 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A45 junction 15 (M1) to junction 13 (A14) (near Wellingborough)<br \/>\nHorticulture<br \/>\n3 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A46 junction 21 (M1) &#8211; Widmerpool (near Leicester)<br \/>\nHorticulture<br \/>\n3mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A52 Harlequin junction (near Nottingham)<br \/>\nCarriageway resurfacing<br \/>\n2 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A5\/A452 Rising Sun Roundabout and Approaches (near Brownhills)<br \/>\nRe-alignment of carriageway, construction of combined footway\/cycleway. Installation of kerbs. Surfacing works<br \/>\n1.2 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A5 Rising Sun Roundabout to Washbrook Lane (near Cannock\/Brownhills)<br \/>\nConstruction of combined footway\/cycleway<br \/>\n1 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A452 and A446 (near Coleshill)<br \/>\nResurfacing of existing carriageway. New road markings and studs.<br \/>\n4 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M621\/M62 junction 27 to junction 1 (near Leeds)<br \/>\nLighting renewal<br \/>\n3.2 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M1 junction 37 to junction 36 (near Barnsley)<br \/>\nBoundary fence renewal<br \/>\n0.4 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M18 junction 6 to junction 5 (near Doncaster)<br \/>\nPavement patching<br \/>\n2 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M180 junction 3 to junction 4 (near Scunthorpe)<br \/>\nBridge repair works<br \/>\n16 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M606 junction 3 (near Bradford)<br \/>\nResurfacing renewal<br \/>\n0.6 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M62 junction 33 to junction 34 (near Pontefract)<br \/>\nBridge works<br \/>\n6.2 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M62 junction 33 to junction 34 (near Pontefract)<br \/>\nBoundary fence renewal<br \/>\n0.9 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M621 junction 2 to junction 3 (near Leeds)<br \/>\nSign lighting renewal<br \/>\n2.1 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M621 junction 7 to junction 4 (near Leeds)<br \/>\nSign lighting renewal<br \/>\n2.6 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A616 (near Barnsley)<br \/>\nRoadmarkings and studs renewal<br \/>\n7.9 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A616 (near Barnsley)<br \/>\nResurfacing renewal<br \/>\n1.9 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A1M junction 36 to junction 37 (near Doncaster)<br \/>\nBarrier renewal<br \/>\n1 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A1M junction 36 to junction 37 (near Doncaster)<br \/>\nBarrier renewal<br \/>\n1 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M1 junction 37 (near Barnsley)<br \/>\nPavement patching renewal<br \/>\n0.6 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A66 Blands Corner to Blackwell (near Darlington)<br \/>\nResurfacing<br \/>\n9 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>A696 Kenton Bar Interchange (near Newcastle Upon Tyne)<br \/>\nImprovement Work<br \/>\n0.7 mile(s) of roadworks lifted for Spring Bank Holiday period.<\/p>\n<p>M1 junction 41 to junction 42 (near Wakefield)<br \/>\nUpgrading motorway to smart motorway<br \/>\n4.7 mile(s) of roadworks lifted for Spring Bank Holiday period<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Nearly 600 miles of roadworks will be lifted on motorways and major A roads by Highways England to help families have smoother journeys over the bank holiday and half-term break.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/70870"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=70870"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/70870\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=70870"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=70870"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=70870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}