{"id":71154,"date":"2016-06-03T10:02:41","date_gmt":"2016-06-03T10:02:41","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=d1f4834eb0cfd0762b13c9cf84c9b1ec"},"modified":"2016-06-03T10:02:41","modified_gmt":"2016-06-03T10:02:41","slug":"press-release-planned-road-works-in-west-midlands-weekly-summary-for-monday-6-june-to-sunday-12-june-2016","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=71154","title":{"rendered":"Press release: Planned road works in West Midlands: weekly summary for Monday 6 June to Sunday 12 June 2016"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 2 June 2016 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a45--stonebridge-eastbound-improvement-scheme\">A45 \u2013 Stonebridge eastbound: improvement scheme<\/h2>\n<p>The eastbound carriageway will be closed overnight between 8pm and 6am on 6 June until 12 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--coventry-southbound-improvement-scheme\">A46 \u2013 Coventry southbound: improvement scheme<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 8pm on 12 June until 6am the following morning (13 June). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--church-bridge-island-to-parade-junction-footway-widening-scheme\">A5 \u2013 Church bridge island to parade junction: footway widening scheme<\/h2>\n<p>The eastbound carriageway will be closed overnight between 8pm and 8am from 6 June until 12 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-carriageway-repairs\">A50 \u2013 Meir tunnel: carriageway repairs<\/h2>\n<p>The carriageway will be closed in both directions overnight between 8pm and 5.30am from 6 June until 12 June. Please note the carriageway will be closed in one direction each night. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-to-5-northbound-carriageway-major-scheme-work\">M5 \u2013 junction 6 to 5 northbound carriageway: major scheme work<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am on 6 and 7 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-to-4a-northbound-carriageway-major-scheme-work\">M5 \u2013 junction 6 to 4a northbound carriageway: major scheme work<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am on 8, 9, and 10 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-4a-northbound-carriageway-major-scheme-work\">M5 \u2013 junction 5 to 4a northbound carriageway: major scheme work<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am on 12 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-15-entry-safety-barrier-installation\">M6 \u2013 junction 15 entry: safety barrier installation<\/h2>\n<p>The northbound entry slip road will be closed overnight between 8pm and 6am from 6 June until 11 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--a38-inner-city-links-barrier-repairs\">M6 \u2013 A38 inner city links: barrier repairs<\/h2>\n<p>The D-C and F-C link roads will be closed overnight for one night from 8pm 9 June until 6am the following morning (10 June). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-11-exit-slip-road-barrier-repairs\">M6 \u2013 junction 11 exit slip road: barrier repairs<\/h2>\n<p>The northbound exit slip road will be closed overnight for one night from 8pm 10 June until 6am the following morning (11 June). A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/71154"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=71154"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/71154\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=71154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=71154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=71154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}