{"id":71344,"date":"2016-06-10T15:19:03","date_gmt":"2016-06-10T15:19:03","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=f58b30786567e2757f9b943fb7f9b59c"},"modified":"2016-06-10T15:19:03","modified_gmt":"2016-06-10T15:19:03","slug":"press-release-planned-road-works-in-west-midlands-weekly-summary-for-monday-13-june-to-sunday-19-june-2016","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=71344","title":{"rendered":"Press release: Planned road works in West Midlands: weekly summary for Monday 13 June to Sunday 19 June 2016"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 10 June 2016 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a45--stonebridge-highway-eastbound-carriageway-works\">A45 \u2013 Stonebridge Highway eastbound: carriageway works<\/h2>\n<p>The eastbound carriageway will be closed overnight between 8pm and 6am from 11 June until the morning of 13 June and again on 19 June.  A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--coventry-eastern-bypass-southbound-carriageway-reconstruction\">A46 \u2013 Coventry eastern bypass southbound: carriageway reconstruction<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am from 16 June until 18 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--coventry-bypass-northbound-carriageway-reconstruction\">A46 \u2013 Coventry bypass northbound: carriageway reconstruction<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am on 16 June until 17 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a45--london-road-eastbound-carriageway-reconstruction\">A45 \u2013 London Road eastbound: carriageway reconstruction<\/h2>\n<p>The eastbound carriageway will be closed overnight between 8pm and 6am from 17 June to 18 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--church-bridge-island-to-parade-junction-footway-widening-scheme\">A5 \u2013 Church bridge Island to Parade junction: footway widening scheme<\/h2>\n<p>The eastbound carriageway will be closed overnight between 8pm and 8am from 13 June until 19 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-carriageway-repairs\">A50 \u2013 Meir Tunnel: carriageway repairs<\/h2>\n<p>The carriageway will be closed in both directions overnight between 8pm and 5.30am from 13 June until 19 June. Please note the carriageway will be closed in one direction each night. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-10-entry-slip-road-carriageway-resurfacing\">M42 \u2013 junction 10 entry slip road: carriageway resurfacing<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 13 June until 15 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-9-entry-slip-road-carriageway-resurfacing\">M42 \u2013 junction 9 entry slip road: carriageway resurfacing<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 13 June until 17 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-3-exit-slip-road-drainage-repairs\">M42 \u2013 junction 3 exit slip road: drainage repairs<\/h2>\n<p>The westbound exit slip road will be closed overnight between 9pm and 6am from 13 June until 17 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-3-to-junction-4-electrical-works\">M42 \u2013 junction 3 to junction 4: electrical works<\/h2>\n<p>The Northbound Carriageway will be closed overnight for one night from 10pm 14th June until 5am the following morning (15th June). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-4a-to-5-southbound-carriageway-major-scheme-works\">M5 \u2013 junction 4a to 5 southbound carriageway: major scheme works<\/h2>\n<p>The southbound carriageway will be closed in both directions overnight between 8pm and 6am from 13 June until 18 June. Please note the carriageway will be closed in one direction each night. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-4a-to-5-northbound-carriageway-major-scheme-works\">M5 \u2013 junction 4a to 5 northbound carriageway: major scheme works<\/h2>\n<p>The northbound carriageway will be closed in both directions overnight between 8pm and 6am from 13 June until 17 June. Please note the carriageway will be closed in one direction each night. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-15-entry-slip-road-safety-barrier-installation\">M6 \u2013 junction 15 entry slip road: safety barrier installation<\/h2>\n<p>The northbound entry slip road will be closed overnight between 8pm and 6am from 13 June until 18 June. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-sound-board-repairs\">M6 \u2013 junction 7 entry slip road: sound board repairs<\/h2>\n<p>The northbound entry slip road will be closed overnight for one night form 8pm 14 June until 5am the following morning (15 June). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-m5-link-road-sound-board-repairs\">M6 \u2013 junction 7 to M5 link road: sound board repairs<\/h2>\n<p>The northbound link road will be closed overnight for one night form 8pm 14 June until 5am the following morning (15 June). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-slip-roads-carriageway-surveys\">M6 \u2013 junction 10 slip roads: carriageway surveys<\/h2>\n<p>The slip roads will be closed overnight between 8pm and 6am from 13 June until 19 June. A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/71344"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=71344"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/71344\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=71344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=71344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=71344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}