{"id":72495,"date":"2016-07-19T09:24:14","date_gmt":"2016-07-19T09:24:14","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=e44c75a074208c149496c8da1e8cbaed"},"modified":"2016-07-19T09:24:14","modified_gmt":"2016-07-19T09:24:14","slug":"press-release-planned-roadworks-in-west-midlands-weekly-summary-for-monday-18-july-to-sunday-24-july-2016","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=72495","title":{"rendered":"Press release: Planned roadworks in West Midlands: weekly summary for Monday 18 July to Sunday 24 July 2016"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 14 July 2016 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--streethay-slip-road-carriageway-work\">A38 \u2013 Streethay slip road: carriageway work<\/h2>\n<p>The southbound slip road will be closed overnight from 7pm on 20 July until 7am on 21 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38-m--m6-links-from-out-of-city-a38-m-carriageway-work\">A38 (M) \u2013 M6 links from out of city A38 (M): carriageway work<\/h2>\n<p>The links from out of city A38 (M) will be closed overnight, 9pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38-m--tyburn-road-merge-onto-a38-m-structural-and-carriageway-work\">A38 (M) \u2013 Tyburn Road merge onto A38 (M): structural and carriageway work<\/h2>\n<p>The link roads from Tyburn Road to A38 (M)  towards City Aston Expressway will be closed overnight, 9pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38-m--m6-junction-6-into-city-slip-road-carriageway-work\">A38 (M) \u2013 M6 junction 6 into city slip road: carriageway work<\/h2>\n<p>The into city link road will be closed overnight, 9pm to 6am, from 21 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38-m--m6-junction-6-into-city-slip-road-carriageway-work-1\">A38 (M) \u2013 M6 junction 6 into city slip road: carriageway work<\/h2>\n<p>The into city link road will be closed overnight, 9pm to 6am, from 21 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a458--middletown-to-wollaston-resurfacing\">A458 \u2013 Middletown to Wollaston: resurfacing<\/h2>\n<p>The carriageway will be closed in both directions overnight, 9pm to 7am, from 20 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--warwick-bypass-resurfacing\">A46 \u2013 Warwick bypass: resurfacing<\/h2>\n<p>The northbound carriageway will be closed overnight, 7pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--longbridge-junction-to-m40-junction-15-carriageway-work\">A46 \u2013 Longbridge junction to M40 junction 15: carriageway work<\/h2>\n<p>The southbound carriageway will be closed overnight, 9pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--llandinabo-to-wormlow--marsh-lane-to-tump-lane-resurfacing\">A49 \u2013 Llandinabo to Wormlow \u2013 Marsh Lane to Tump Lane: resurfacing<\/h2>\n<p>The Carriageway will be closed in both directions overnight, 9pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--between-a49a489-grove-junction-and-a49b4370-marshbrook-junction-pavement-renewal\">A49 \u2013 between A49\/A489 Grove junction and A49\/B4370 Marshbrook junction: pavement renewal<\/h2>\n<p>The carriageway will be closed in both directions overnight, 8pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--tump-lane-slip-road-cctv-work\">A49 \u2013 Tump Lane slip road: CCTV work<\/h2>\n<p>The slip road will be closed overnight, 9pm to 6am, from 18 July until 20 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--onibury-level-crossing-network-rail-work\">A49 \u2013 Onibury Level Crossing: Network Rail work<\/h2>\n<p>The carriageway will be closed in both directions overnight from 11pm on 24 July until 5am on 25 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--a5006-from-michelin-roundabout-and-a500-northbound-sideway-slip-road-material-deliveries\">A500 \u2013 A5006 from Michelin roundabout and A500 northbound sideway slip road: material deliveries<\/h2>\n<p>The northbound carriageway and slip road will be closed overnight between 8pm and 6am from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5127--gravelly-hill-merge-onto-a38-m-into-city-aston-expressway-carriageway-work\">A5127 \u2013 Gravelly Hill merge onto A38 (M) into city Aston Expressway: carriageway work<\/h2>\n<p>The link road will be closed overnight between 9pm and 6am from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-10-to-junction-7-carriageway-resurfacing\">M42 \u2013 junction 10 to junction 7: carriageway resurfacing<\/h2>\n<p>The southbound carriageway will be closed overnight between 9pm and 6am from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-including-entry-slip-road-to-junction-8-electrical-work\">M42 \u2013 junction 6, including entry slip road, to junction 8: electrical work<\/h2>\n<p>The northbound carriageway and slip road be closed overnight from 10.30pm on 19 July until 5am on 20 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-6-major-scheme-work\">M5 \u2013 junction 5 to junction 6: major scheme work<\/h2>\n<p>The southbound carriageway will be closed overnight, from 8pm to 6am, from 18 July until 24 July. A diversion route will be clearly signposted<\/p>\n<h2 id=\"m50--junction-1-exit-and-entry-slip-roads-vegetation-work\">M50 \u2013 junction 1 exit and entry slip roads: vegetation work<\/h2>\n<p>The westbound entry and exit slip roads will be closed overnight from 9pm on 18 July until 6am on 19 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-exit-slip-road-vegetation-work\">M50 \u2013 junction 2 exit slip road: vegetation work<\/h2>\n<p>The eastbound exit slip road will be closed overnight from 9pm on 19 July until 1am on 20 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-entry-slip-road-vegetation-work\">M50 \u2013 junction 2 entry slip road: vegetation work<\/h2>\n<p>The westbound entry slip road will be closed overnight from 1am on 20 July until 6am on 20 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-exit-slip-road-vegetation-work-1\">M50 \u2013 junction 2 exit slip road: vegetation work<\/h2>\n<p>The westbound exit slip road will be closed overnight from 9pm on 20 July until 1am on 21July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-entry-slip-road-vegetation-work-1\">M50 \u2013 junction 2 entry slip road: vegetation work<\/h2>\n<p>The eastbound entry slip road will be closed overnight from 1am to 6am on 21 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-3-exit-and-entry-slip-roads-vegetation-work\">M50 \u2013 junction 3 exit and entry slip roads: vegetation work<\/h2>\n<p>The eastbound exit and entry slip roads will be closed overnight from 9pm on 21 July until on 22 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-3-exit-and-entry-slip-roads-vegetation-work-1\">M50 \u2013 junction 3 exit and entry slip roads: vegetation work<\/h2>\n<p>The westbound exit and entry slip roads will be closed overnight from 1am on 22 July until 6am on 22 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-3-exit-and-entry-slip-roads-vegetation-work-2\">M50 \u2013 junction 3 exit and entry slip roads: vegetation work<\/h2>\n<p>The eastbound exit and entry slip roads will be closed overnight from 9pm on 22 July until 1am on 23 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-3-entry-slip-road-grass-cutting\">M54 \u2013 junction 3 entry slip road: grass cutting<\/h2>\n<p>The eastbound entry slip road will be closed overnight from 9pm on 18 July until 6am on 19 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-3-exit-slip-road-grass-cutting\">M54 \u2013 junction 3 exit slip road: grass cutting<\/h2>\n<p>The westbound exit slip road will be closed from 9pm on 18 July until 6am on 19 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-1-to-m6-junction-10a-bridge-expansion\">M54 \u2013 junction 1 to M6 junction 10a: bridge expansion<\/h2>\n<p>The eastbound carriageway will be closed overnight, 9pm to 6am, from 18 July until 22 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-3-exit-slip-road-grass-cutting-1\">M54 \u2013 junction 3 exit slip road: grass cutting<\/h2>\n<p>The eastbound exit slip road will be closed overnight from 9pm on 19 July until 6am on 20 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-3-entry-slip-road-grass-cutting-1\">M54 \u2013 Junction 3 entry slip road: grass cutting<\/h2>\n<p>The westbound entry slip road will be closed overnight from 9pm on 19 July until 6am on 20 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-exit-slip-road-grass-cutting\">M54 \u2013 junction 4 exit slip road: grass cutting<\/h2>\n<p>The westbound exit slip road will be closed overnight from 9pm on 20 July until 6am on 21 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-entry-slip-road-grass-cutting\">M54 \u2013 junction 4 entry slip road: grass cutting<\/h2>\n<p>The eastbound entry slip road will be closed overnight from 9pm on 20 July until 6am on 21 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-exit-slip-road-grass-cutting-1\">M54 \u2013 junction 4 exit slip road: grass cutting<\/h2>\n<p>The eastbound exit slip road will be closed overnight from 9pm on 21 July until 6am  on 22nd July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-entry-slip-road-grass-cutting-1\">M54 \u2013 junction 4 entry slip road: grass cutting<\/h2>\n<p>The westbound entry slip road will be closed overnight from 9pm on 21 July until 6am on 22 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-entry-slip-road-grass-cutting-litter-picking-and-gully-cleaning\">M54 \u2013 junction 5 entry slip road: grass cutting, litter picking, and gully cleaning<\/h2>\n<p>The westbound entry slip road will be closed overnight from 9pm on 22 July until 6am on 23 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-exit-slip-road-grass-cutting-litter-picking-and-gully-cleaning\">M54 \u2013 junction 5 exit slip road: grass cutting, litter picking, and gully cleaning<\/h2>\n<p>The westbound exit slip road will be closed overnight from 9pm on 22 July until 6am on 23 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-salford-circus-to-m6-re-waterproofing-and-structural-repair\">M6 \u2013 junction 6 Salford Circus to M6: re-waterproofing and structural repair<\/h2>\n<p>Carriageway closure will be in place in both directions until 23 December 2017. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-8-carriageway-work\">M6 \u2013 junction 7 to junction 8: carriageway work<\/h2>\n<p>The northbound carriageway will be closed in both directions overnight, 9pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-exit-slip-road-carriageway-work\">M6 \u2013 junction 7 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight, 9pm to 6am, from 18 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-to-junction-11-electrical-work\">M6 \u2013 junction 10 to junction 11: electrical work<\/h2>\n<p>The northbound carriageway will be closed overnight from 8pm on 18 July until 6am on 19 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-bridge-inspection\">M6 \u2013 junction 10: bridge inspection<\/h2>\n<p>The northbound carriageway will be closed overnight from 10pm on 18 July until 6am on 19 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-4-exit-slip-road-traffic-signal-replacement\">M6 \u2013 junction 4 exit slip road: traffic signal replacement<\/h2>\n<p>The northbound exit slip road will be closed overnight from 10pm on 19 July until 6am on 20 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-bridge-inspection-1\">M6 \u2013 junction 10: bridge inspection<\/h2>\n<p>The southbound carriageway will be closed overnight from 10pm on 19 July until 6am on 20 July). Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-16-to-junction-15-installation-of-narrow-lanes\">M6 \u2013 junction 16 to junction 15: installation of narrow lanes<\/h2>\n<p>The northbound carriageway will be closed overnight, 10pm to 6am, from 19 July until 23 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-electrical-work\">M6 \u2013 junction 7 entry slip road: electrical work<\/h2>\n<p>The southbound entry slip road will be closed overnight from 8.30pm on 20 July until 5am on 21 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-exit-slip-road-electrical-work\">M6 \u2013 junction 7 exit slip road: electrical work<\/h2>\n<p>The northbound exit slip road will be closed overnight from 8.30pm on 21 July until 5am on 22 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-into-city-slip-road-carriageway-repair\">M6 \u2013 junction 6 into city slip road: carriageway repair<\/h2>\n<p>A 24-hour slip road closure will be in place from 21 July until 23 December 2017. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-carriageway-repair\">M6 \u2013 junction 6: carriageway repair<\/h2>\n<p>A 24-hour carriageway closure will be in place from 21 July until 23 December 2017. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-from-city-slip-roads-carriageway-repair\">M6 \u2013 junction 6 from city slip roads: carriageway repair<\/h2>\n<p>24-hour slip road closures will be in place from 21 July until 23 December 2017. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-to-m5-southbound-link-electrical-work\">M6 \u2013 junction 7 entry slip road to M5 southbound link: electrical work<\/h2>\n<p>The northbound entry slip road will be closed overnight from 8.30pm on 22 July until 5am on 23 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-work\">M6 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight, 9pm to 6am, from 22 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-work-1\">M6 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The southbound exit slip road will be closed overnight, 9pm to 6am, from 22 July until 24 July. Diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/72495"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=72495"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/72495\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=72495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=72495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=72495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}