{"id":73342,"date":"2016-08-18T11:02:39","date_gmt":"2016-08-18T11:02:39","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=2c35db9efdced0e3ae3f76f6625b3323"},"modified":"2016-08-18T11:02:39","modified_gmt":"2016-08-18T11:02:39","slug":"press-release-370-miles-of-roadworks-completed-or-lifted-in-time-for-the-august-bank-holiday","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=73342","title":{"rendered":"Press release: 370 miles of roadworks completed or lifted in time for the August bank holiday"},"content":{"rendered":"<div class=\"govspeak\">\n<p>Highways England will remove the roadworks by early Friday morning on 26 August 2016 to help people get away on bank holiday journeys with as little disruption from roadworks as possible.<\/p>\n<p>Almost 98% of England\u2019s motorway and major A roads, the strategic road network, will have no roadworks over the August bank holiday period. We are removing 373 miles of roadworks: 179 sets of roadworks, totalling 319 miles, will be completed and 22 sets suspended, totalling 54 miles ahead of the holiday.<\/p>\n<p>The government is investing \u00a315 billion to deliver the biggest upgrade to motorways and major A roads in a generation. Building new roads and creating smart motorways that keep traffic moving even in the busiest periods will cut congestion \u2013 and Highways England is taking action to reduce delays over the bank holiday break.<\/p>\n<p>A <a rel=\"external\" href=\"https:\/\/drive.google.com\/open?id=1PMYx_Cjule42oVnKHOPWmGiMfmM&amp;usp=sharing\">map showing the locations of lifted and completed schemes<\/a> is available to view.<\/p>\n<p>Highways England Chief Executive, Jim O\u2019Sullivan said:<\/p>\n<blockquote>\n<p>This August bank holiday, we\u2019re helping drivers with their journeys by clearing roadworks across the majority of our motorways and major A roads in England.<\/p>\n<p>Our traffic officers will also be on patrol and working with partners to help clear any incidents; the vast majority of which will be dealt with in under an hour.<\/p>\n<p class=\"last-child\">We\u2019re asking people to be prepared too. Make sure you have everything you need for your journey should there be any delays, check before and during your journey and also make sure you\u2019re aware of the signs and signals on motorways.<\/p>\n<\/blockquote>\n<p>Our website can help <a rel=\"external\" href=\"http:\/\/www.highways.gov.uk\/traffic-information\">drivers plan their journeys<\/a>, and by listening to local radio stations, or by calling our information line (0300 123 5000) they can keep up to date with conditions on the roads.<\/p>\n<p>Highways England is advising drivers of the resources on offer to help them arrive at their destinations safely, including <a href=\"http:\/\/www.gov.uk\/guidance\/how-to-drive-on-a-smart-motorway\">advice about driving on smart motorways<\/a> where signs and signals are used to help ease the flow of traffic to improve journeys.<\/p>\n<p>People travelling with caravans and trailers are also urged to check their vehicles before they take to the roads \u2013 especially their tyres, to ensure they are not worn or damaged \u2013 to help avoid a potential breakdown or incident and help keep traffic flowing.<\/p>\n<p>The roadworks will be completed or suspended from 6am on 26 August until 12.01am on 30 August. By suspending or completing roadworks, more lanes will be open and many of the associated speed restrictions will be lifted.<\/p>\n<p>For the safety of drivers and their passengers, lane restrictions or temporary speed limits will need to remain at 46 locations.<\/p>\n<p>Drivers planning to use the Dartford Crossing are reminded to pay Dart Charge in advance or by midnight the day after crossing.<\/p>\n<h2 id=\"full-list-of-completed-or-lifted-schemes\">Full list of completed or lifted schemes<\/h2>\n<p>The full list of schemes which will be lifted and completed over the August bank holiday period is as follows.<\/p>\n<h3 id=\"roadworks-lifted\">Roadworks lifted<\/h3>\n<p>A1 J77 (near Newcastle Upon Tyne)<br \/>\nResurfacing<br \/>\n4.3mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A66 Newton Grange to Elton (near Darlington)<br \/>\nResurfacing<br \/>\n6.6mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A66 near to Cumbria border (near Barnard Castle)<br \/>\nReplacement of snow poles<br \/>\n1.3mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>M62 J6 (near Tarbock\/Huyton\/Whiston)<br \/>\nInstallation of new lighting columns to roundabout and slip roads on and off roundabout. Cycle scheme upgrading around roundabout gyratory.<br \/>\n0.75mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>M6 J39-38 (near Shap)<br \/>\nBridge expansion joint replacement and fencing renewals<br \/>\n2mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A66 (near Keswick)<br \/>\nResurfacing and road markings with sign face replacements<br \/>\n2mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A590 (near Swarthmoor)<br \/>\nResurfacing works<br \/>\n1mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>M1 J27 (near Mansfield)<br \/>\nEntry and exit slip road closures for local authority works on A608<br \/>\n5mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A43 Brackley Bypass (near Brackley)<br \/>\nDrainage works<br \/>\n5mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A49\/Holme Lack Road Junction (near Hereford)<br \/>\nResurfacing<br \/>\n0.5mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>North of A49 and B4371 junction (near Church Stretton)<br \/>\nResurfacing<br \/>\n2mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A449 Brewood Road Roundabout to Gailey Roundabout NB (near Penkridge)<br \/>\nDrainage<br \/>\n6mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A12 Yarmouth Road &#8211; Station Road to Gunton St Peters Avenue (near Lowestoft)<br \/>\nConnection works for upgraded street lighting<br \/>\n0.15mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A428 (near St Neots)<br \/>\nCarriageway resurfacing works under full carriageway closures<br \/>\n6mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A14 J36 to J22 (near Cambridge)<br \/>\nRepair work<br \/>\n3mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>M11 J6 to J9 (near Harlow)<br \/>\nAsset inspections under lane closures<br \/>\n3mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A12 Corton Long Lane to St Peters Street  (near Lowestoft)<br \/>\nCycleway improvement works<br \/>\n0.2mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>M20 J11 &#8211; 9 (near Kent)<br \/>\nSurveys under lane 1, hardshoulder closure<br \/>\n1mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A27 Worthing (near Worthing)<br \/>\nStreet lighting renewal<br \/>\n1mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A38 Saltash Tunnel (near Saltash)<br \/>\nOvernight tunnel closures for CCTV &amp; PA system replacement<br \/>\n0.35mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<p>A38 Island Shop (near Liskeard)<br \/>\n24hr lane closures for drainage defect repairs &amp; upgrades<br \/>\n1.5mile(s) of roadworks lifted for August Bank Holiday period.<\/p>\n<h3 id=\"roadworks-completed\">Roadworks completed<\/h3>\n<p>A66 Cumbrian Border to Bowes (near Barnard Castle)<br \/>\nResurfacing<br \/>\n11 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1 J65 to 66 (near Gateshead)<br \/>\nSurveys<br \/>\n1.8 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1 J71 (near Newcastle Upon Tyne)<br \/>\nElectrical<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1 J71 (near Newcastle Upon Tyne)<br \/>\nDrainage<br \/>\n2.1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A696 Kenton Bar to Airport (near Newcastle Upon Tyne)<br \/>\nSurveys<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A66 Fox Hall Inn (near Barnard Castle)<br \/>\nSurveys<br \/>\n0.2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1 Brownieside (near Alnwick)<br \/>\nResurfacing<br \/>\n9 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1 West Moor to Coquet (near Alnwick)<br \/>\nSurveys<br \/>\n0.6 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1 Alnwick (near A1 Alnwick)<br \/>\nResurfacing<br \/>\n8.7 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M62 J35 &#8211; 34 (near Doncaster)<br \/>\nPatching scheme<br \/>\n9 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A66 (near Penrith)<br \/>\nResurfacing works.<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A66 (near Brough)<br \/>\nPatching works and reinstatement of road markings.<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A595 (near Blackbeck)<br \/>\nRenewal of existing road signing and carriageway markings.<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J19-24 (near Loughborough)<br \/>\nHorticultural works<br \/>\n5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J27 (near Mansfield)<br \/>\nTechnology works<br \/>\n2.75 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J27-26 (near Hucknall)<br \/>\nTechnology works<br \/>\n2.1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J26 (near Nottingham)<br \/>\nTechnology works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J27-28 (near Mansfield)<br \/>\nTechnology works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M45 Kilsby to Dunchurch (near Rugby)<br \/>\nTechnology works<br \/>\n0.75 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M45 Dunchurch (near Rugby)<br \/>\nTechnology works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M69 J2-1 (near Hinckley)<br \/>\nTechnology works<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M69 J2-3 (near Hinckley)<br \/>\nTechnology works<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A5 Wibtoft and Lutterworth (near Nuneaton)<br \/>\nDrainage works<br \/>\n1.7 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A5 Gibbets Roundabout &#8211; DIRFT (near Rugby)<br \/>\nCarriageway resurfacing<br \/>\n0.6 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A43 Wood Burcote (near Silverstone)<br \/>\nDrainage works<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A50 J1 (near Derby)<br \/>\nCarriageway repairs<br \/>\n0.75 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>Southbound J15 (Sawtry) to 14 (A14M Spur) (near Huntingdon &amp; Peterborough)<br \/>\nMajor Maintenance Scheme (Carriageway Improvement Works)<br \/>\n4.2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1307 Huntingdon Road (near Cambridge)<br \/>\nBridge joint replacement and surfacing.<br \/>\n0.75 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J7 (near Harlow)<br \/>\nReplacement of matrix signals<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1M J6-7 (near Stevenage)<br \/>\nReplacement of matrix signals<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J8 &#8211; 9 (near Birchanger\/Stansted)<br \/>\nReplacement of matrix signals<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J7 &#8211; 8 (near Birchanger\/Stansted)<br \/>\nReplacement of matrix signals<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J13-14 (near Milton Keynes)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J13-14 (near Milton Keynes)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J13-14 (near Milton Keynes)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J14-15 (near Northampton)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J15-14 (near Northampton)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J14-15 (near Northampton)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J14-15 (near Northampton)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J14-13 (near Milton Keynes)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J14-13 (near Milton Keynes)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J14-13 (near Milton Keynes)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J13-14 (near Milton Keynes)<br \/>\nLoop cutting<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J7-8 (near Harlow)<br \/>\n Message Sign Replacement<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J7-8 (near Harlow)<br \/>\n Message Sign Replacement<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A12 J14-15 (near Chelmsford)<br \/>\n Message Sign Replacement<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A12 J14-15 (near Chelmsford)<br \/>\n Message Sign Replacement<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A12 J20a -19 (near Chelmsford)<br \/>\n Message Sign Replacement<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A12 J20a -19 (near Chelmsford)<br \/>\n Message Sign Replacement<br \/>\n0 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J11 to J12 (near Dunstable)<br \/>\nImprovement works<br \/>\n8 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J13 to J15 (near Milton Keynes)<br \/>\nRoutine maintenance to technology equipment<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1J14 to J15 (near Milton Keynes)<br \/>\nCarriageway resurfacing works<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1 (near Huntingdon)<br \/>\nRoutine bridge maintenance<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A14 J33 to J23 (near Cambridge)<br \/>\nCarriageway resurfacing works<br \/>\n5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A14 J30 to J31 (near Cambridge)<br \/>\nBridge inspections<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J8 (near Bishop\u2019s Stortford)<br \/>\n Traffic Signal controller repairs<br \/>\n0.2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J8 to J7 (near Bishop\u2019s Stortford)<br \/>\nRoutine technology equipment maintenance<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 J7 to J9 (near Harlow)<br \/>\nRoutine technology equipment maintenance<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A12 J14 to J20B (near Chelmsford)<br \/>\n Variable message sign maintenance<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A120 (near Great Dunmow)<br \/>\nRoutine technology equipment maintenance<br \/>\n6 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J8 to J10 (near Hemel Hempstead)<br \/>\nRoutine technology equipment maintenance<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A1M J6 to J7 (near Stevenage)<br \/>\nRoutine technology equipment maintenance<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A12 (near Lowestoft)<br \/>\nRoutine Bridge Maintenance<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A14 J45 (near Bury St Edmunds)<br \/>\nConstruction of new relief road<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A421 (near Bedford)<br \/>\nCarriageway resurfacing works<br \/>\n5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A27  Cophall, Polegate  (near Polegate)<br \/>\nBuilding Wind farm<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A27 Ashcombe to Tangmere  (near Sussex)<br \/>\nVegetation clearance under mobile lane closure<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J22 &#8211; 24 (near South Mimms)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J23 Entry Slip (near South Mimms)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J23 &#8211; 25 (near Potters Bar)<br \/>\nSweeping of carriageway<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J24 Exit Slip (near Potters Bar)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J24 Entry Slip (near Potters Bar)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J24- 25  (near Potters Bar)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J24 &#8211; 25 (near Potters Bar)<br \/>\nSweeping of carriageway<br \/>\n2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J25 &#8211; 26 (near Waltham Cross)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J25 &#8211; 27 (near Waltham Cross)<br \/>\nSweeping of carriageway<br \/>\n4 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M26 J2a &#8211; M25 (near Seven Oaks)<br \/>\nSweeping of carriageway<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J5 &#8211; 6 (near Seven Oaks)<br \/>\nSweeping of carriageway<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A21 northbound link to M25 (near Seven Oaks)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J5 &#8211; 6 (near Seven Oaks)<br \/>\nSweeping of carriageway<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J5 &#8211; 6 (near Seven Oaks)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 Clacket Lane Services Exit slip (near Oxted)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 Clacket Lane MSA Entry Slip (near Oxted)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J5 &#8211; 6 (near Oxted)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J5 &#8211; 7 (near Godstone)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J6 exit slip (near Godstone)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J6 Entry Slip (near Godstone)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J6 &#8211; 8 (near Godstone)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 Jn 6 Anticlockwise Exit Slip (near Godstone)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J6 &#8211; 5 (near Godstone)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J6 &#8211; 5 (near Godstone)<br \/>\nSweeping of carriageway<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 Clacket Lane Services Exit slip (near Oxted)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 Clacket Lane Anticlockwise Entry Slip (near Oxted)<br \/>\nSweeping of carriageway<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J27- 26 (near Waltham Abbey)<br \/>\nTunnel maintenance<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J26-25 (near Waltham Abbey)<br \/>\nTunnel maintenance<br \/>\n2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J5-5 (near Slough)<br \/>\nTunnel maintenance<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J5-5 (near Slough)<br \/>\nTunnel maintenance<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J11-12 (near Addlestone)<br \/>\nSign erection<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J13-12 (near Staines)<br \/>\nSign erection<br \/>\n3.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J10 &#8211; 11 (near Cobham)<br \/>\nSign erection<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J10 -11 (near Cobham)<br \/>\nCarriageway reconstruction and repair<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J7-8 (near Merstham)<br \/>\nInspection survey<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J26-27 (near Waltham Abbey)<br \/>\nTunnel maintenance<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J26-27 (near Waltham Abbey)<br \/>\nTunnel maintenance<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J9-8 (near Reigate)<br \/>\nTunnel maintenance<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J8-9 (near Reigate)<br \/>\nTunnel maintenance<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J4 westbound entry (near Hayes)<br \/>\nConstruction improvement upgrading<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 clockwise link to M4 westbound (near West Drayton)<br \/>\nConstruction improvement upgrading<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J1b clockwise exit slip (near Dartford)<br \/>\nCarriageway reconstruction and repair<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J2 (near Dartford)<br \/>\nCarriageway reconstruction and repair<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J2 clockwise exit (near Dartford)<br \/>\nCarriageway reconstruction and repair<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A20 M25 roundabout (near Dartford)<br \/>\nCarriageway reconstruction and repair<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 clockwise link to M20 eastbound (near Swanley)<br \/>\nCarriageway reconstruction and repair<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A2 M25 roundabout (near Dartford)<br \/>\nCarriageway reconstruction and repair<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A2 M25 &#8211; A2018 (near Dartford)<br \/>\nCarriageway reconstruction and repair<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J12 &#8211; 11 (near Chertsey)<br \/>\nCarriageway reconstruction and repair<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J11-10 (near Addlestone)<br \/>\nCarriageway reconstruction and repair<br \/>\n5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J11 Entry Slip (near Addlestone)<br \/>\nCarriageway reconstruction and repair<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J 12-11 (near Addlestone)<br \/>\nCarriageway reconstruction and repair<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J 11-10 (near Addlestone)<br \/>\nCarriageway reconstruction and repair<br \/>\n5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J11 entry slip (near Addlestone)<br \/>\nCarriageway reconstruction and repair<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J18-20 (near Rickmonworth)<br \/>\nSigns maintenance<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J27-25 (near Waltham Abbey)<br \/>\nSigns maintenance<br \/>\n4 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J5-6 (near Seven Oaks)<br \/>\nSigns maintenance<br \/>\n2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J15-17 (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J17-15 (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J15-17 (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 clockwise link to M40 eastbound (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J 16-15 (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 anticlockwise link to M40 westbound (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J24 exit slip (near Potters Bar)<br \/>\nEmergency works<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J24 entry slip (near Potters Bar)<br \/>\nEmergency works<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J24 exit slip (near Potters Bar)<br \/>\nElectrical works<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J11-10 (near Addlestone)<br \/>\nCarriageway reconstruction and repair<br \/>\n2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J4b-5 (near West Drayton)<br \/>\nConstruction improvement upgrading<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J16-15 (near Gerrards Cross)<br \/>\nElectrical works<br \/>\n2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J15-J16 (near West Drayton)<br \/>\nElectrical works<br \/>\n2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A282 DRC east tunnel (near Dartford)<br \/>\nTunnel maintenance<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J5-4 (near Seven Oaks)<br \/>\nInspection survey<br \/>\n2 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M1 J4- MSA (near Edgware)<br \/>\nInspection survey<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 southbound link to M25 clockwise (near Epping)<br \/>\nInspection survey<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J19-18 (near Watford)<br \/>\nElectrical works<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J19-29 (near Watford)<br \/>\nElectrical works<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M11 southbound to link to M25 (near Epping)<br \/>\nInspection survey<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J4a-4 (near Heathrow)<br \/>\nConstruction improvement upgrading<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J23-24 (near South Mimms)<br \/>\nElectrical works<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M40 eastbound link to M25  (near Gerrards Cross)<br \/>\nCarriageway reconstruction and repair<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J10-11 (near Addlestone)<br \/>\nInspection survey<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J2-3 (near Swanley)<br \/>\nCarriageway reconstruction and repair<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 link to M40 westbound (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J16 to M40 eastbound (near Gerrards Cross)<br \/>\nInspection survey<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M3 J1-2 (near Sunbury)<br \/>\nSweeping of carriageway<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J3-2 (near Swanley)<br \/>\nElectrical works<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J2-4 (near Hayes)<br \/>\nConstruction improvement upgrading<br \/>\n3.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J3 westbound entry slip (near Hayes)<br \/>\nConstruction improvement upgrading<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J17-19 (near Rickmansworth)<br \/>\nElectrical works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J22-21A (near London Colney)<br \/>\nElectrical works<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J14 exit slip (near Heathrow)<br \/>\nHorticulture<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A3113 westbound (near Heathrow)<br \/>\nHorticulture<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J14 exit Slip (near Heathrow)<br \/>\nHorticulture<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J14 roundabout (near Heathrow)<br \/>\nHorticulture<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J4B -3 (near Heathrow)<br \/>\nConstruction improvement upgrading<br \/>\n3 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A13\/A1012 to A1306 (near Thurrock)<br \/>\nConstruction improvement upgrading<br \/>\n5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 anticlockwise link to M4 eastbound (near West Drayton)<br \/>\nConstruction improvement upgrading<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J4 eastbound entry slip (near West Drayton)<br \/>\nConstruction improvement upgrading<br \/>\n1 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A20 M25 to B2173 (near Swanley)<br \/>\nHorticulture<br \/>\n2.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A3113 eastbound (near Heathrow)<br \/>\nElectrical works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A3113 westbound (near Heathrow)<br \/>\nElectrical works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M25 J11-10 (near Addlestone)<br \/>\nCarriageway reconstruction and repair<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A3113 eastbound to M25 J14 (near Heathrow)<br \/>\nElectrical works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A3113 westbound (near Heathrow)<br \/>\nElectrical works<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M3 J1 (near Sunbury)<br \/>\nInspection survey<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A316 westbound entry slip (near Sunbury)<br \/>\nInspection survey<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M3 J1-J1 (near Sunbury)<br \/>\nInspection survey<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A316 J1 to M3 (near Sunbury)<br \/>\nInspection survey<br \/>\n1.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A38 (near Chudleigh)<br \/>\nResurfacing<br \/>\n5.4 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M4 J18 &#8211; 19 (near Tormarton)<br \/>\nDismantling of netting from scaffold tower over the carriageway<br \/>\n8 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>M5 J29 northbound entry slip  (near Exeter)<br \/>\nSurvey works<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<p>A36\/A303 exit slip (near Deptford)<br \/>\nSurvey works<br \/>\n0.5 mile(s) of roadworks completed for August Bank Holiday period.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Over 370 miles of roadworks will be lifted or completed on motorways and major A roads to help families have smoother journeys over the August bank holiday.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/73342"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=73342"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/73342\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=73342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=73342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=73342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}