{"id":73591,"date":"2016-08-26T13:10:28","date_gmt":"2016-08-26T13:10:28","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=db2975b009879084d9720d1f789965bf"},"modified":"2016-08-26T13:10:28","modified_gmt":"2016-08-26T13:10:28","slug":"press-release-resurfacing-work-at-4-a66-locations","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=73591","title":{"rendered":"Press release: Resurfacing work at 4 A66 locations"},"content":{"rendered":"<div class=\"govspeak\">\n<p>Highways England is spending \u00a3357,000 on the overnight repairs which will take place for a week at Kemplay roundabout and along the westbound carriageway between the roundabout and Carleton Hall from Thursday (1 September).   This will be followed by a week of repairs along the westbound Temple Sowerby bypass and then, in mid-September, repairs between Low Moor and Kirkby Thore \u2013 again for a week.<\/p>\n<p>Highways England project manager Peter Gee said:<\/p>\n<blockquote>\n<p>These are routine wear and tear repairs to ensure drivers can continue to enjoy safe and smooth journeys along this section of the A66.<\/p>\n<p class=\"last-child\">We\u2019re carrying out all the work overnight when the route is at its quietest to minimise inconvenience to road users.<\/p>\n<\/blockquote>\n<p>Traffic will be controlled using a mixture of lane closures and temporary traffic signals, with closures of junctions at Morland Road and Cliburn Road required for short durations.  Signed diversions will be in place during these.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A short programme of resurfacing work to iron out potholes and other wear and tear along sections of the A66 near Penrith is taking place next month.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/73591"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=73591"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/73591\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=73591"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=73591"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=73591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}