{"id":74018,"date":"2016-09-09T14:21:43","date_gmt":"2016-09-09T14:21:43","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=3e06a5b08fcba6e3ac6c9536fd4c82b0"},"modified":"2016-09-09T14:21:43","modified_gmt":"2016-09-09T14:21:43","slug":"press-release-planned-road-works-in-west-midlands-weekly-summary-for-monday-12-september-to-sunday-18-september-2016","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=74018","title":{"rendered":"Press release: Planned road works in West Midlands: weekly summary for Monday 12 September to Sunday 18 September 2016"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 9 September 2016 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--streethay-slip-road-carriageway-work\">A38 \u2013 Streethay slip road: carriageway work<\/h2>\n<p>The slip road will be closed for 24 hours a day from 8 August ongoing until 11 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--hilliards-cross-northbound-exit-slip-developer-work\">A38 \u2013 Hilliards Cross northbound exit slip: developer work<\/h2>\n<p>The northbound exit slip road will be closed for 24 hours a day from 24 August ongoing until 21 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--claymills-to-branston-sign-inspections\">A38 \u2013 Claymills to Branston: sign inspections<\/h2>\n<p>The southbound carriageway including all associated slip roads will be closed overnight for one night from 8.30pm 12 September until 6am the following morning (13 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--branston-to-claymills-sign-inspections\">A38 \u2013 Branston to Claymills: sign inspections<\/h2>\n<p>The northbound carriageway including all associated slip roads will be closed overnight for one night from 8.30pm 12 September until 6am the following morning (13 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--toyota-to-claymills-sign-inspection\">A38 \u2013 Toyota to Claymills: sign inspection<\/h2>\n<p>The southbound carriageway including all associated slip roads will be closed between 8.30pm and 6am from 13 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--claymills-to-toyota-sign-inspection\">A38 \u2013 Claymills to Toyota: sign inspection<\/h2>\n<p>The northbound carriageway including all associated slip roads will be closed between 8.30pm and 6am from 13 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38m--m6-links-from-out-of-city-a38m-carriageway-work\">A38M \u2013 M6 Links from Out of City A38M: carriageway work<\/h2>\n<p>The Links from Out of City A38M will be closed overnight between 9pm and 6am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38m--tyburn-road-merge-onto-a38m-into-city-aston-expressway-f-c-links-carriageway-work\">A38M \u2013 Tyburn Road merge onto A38M into City Aston Expressway (F-C Links) carriageway work<\/h2>\n<p>The Road into City A38M will be closed overnight between 9pm and 6am from 12 September until 21 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--southbound-from-m69-exit-to-b4082-roundabout-drainage-work\">A46 \u2013 southbound from M69 exit to B4082 roundabout: drainage work<\/h2>\n<p>The southbound exit onto B4082 roundabout will be closed overnight between 10pm and 6am from 12 September until 17 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--church-stretton-to-leebotwood-carriageway-resurfacing\">A49 \u2013 Church Stretton to Leebotwood: carriageway resurfacing<\/h2>\n<p>The carriageway will be closed in both directions overnight between 10pm and 6am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--tump-lane-to-belmont-carriageway-resurfacing\">A49 \u2013 Tump Lane to Belmont: carriageway resurfacing<\/h2>\n<p>The carriageway will be closed in both directions overnight between 10pm and 6am from 12 September until 14 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--churchbridge-to-washbrook-lane-electrical-work\">A5 \u2013 Churchbridge to Washbrook Lane: electrical work<\/h2>\n<p>The carriageway will be closed in both directions overnight between 8pm and 6am from 12 September until 17 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--welsh-border-to-a5-mile-end-electrical-work\">A5 \u2013 Welsh Border to A5 Mile End: electrical work<\/h2>\n<p>The carriageway will be closed in both directions overnight between 8pm and 6am from 12 September until 14 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--chick-bank-welsh-border-to-weir-brook-carriageway-work\">A5 \u2013 Chick Bank (Welsh Border) to Weir Brook: carriageway work<\/h2>\n<p>The carriageway will be closed in both directions overnight between 9pm and 6am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50-queensway-to-herons-cross-entry-and-exit-slip-road-grass-cutting\">A50\u2013 Queensway to Herons Cross entry and exit slip road: grass cutting<\/h2>\n<p>The eastbound entry and exit slip roads will be closed overnight for one night from 9pm 13 September until 6am the following morning (14 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50-queensway-to-foley-road-entry-and-exit-slip-roads-grass-cutting\">A50\u2013 Queensway to Foley Road entry and exit slip roads: grass cutting<\/h2>\n<p>The eastbound entry and exit slip roads will be closed overnight for one night from 9pm 14 September until 6am the following morning (15 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50-heron-cross-to-longton-entry-and-exit-slip-road-grass-cutting\">A50\u2013 Heron Cross to Longton entry and exit slip road: grass cutting<\/h2>\n<p>The eastbound entry and exit slip roads will be closed overnight for one night from 9pm 15 September until 6am the following morning (16 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50-longton-to-normacot-entry-and-exit-slip-roads-grass-cutting\">A50\u2013 Longton to Normacot entry and exit slip roads: grass cutting<\/h2>\n<p>The eastbound entry and exit slip roads will be closed overnight for one night from 9pm 16 September until 6am the following morning (17 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--a5006-from-michelin-roundabout-and-a500-northbound-sideway-slip-road-material-deliveries\">A500 \u2013 A5006 From Michelin roundabout and A500 northbound sideway slip road: material deliveries<\/h2>\n<p>The northbound carriageway and slip road will be closed overnight between 8pm and 6am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--eutoria-entry-slip-road-bridge-work\">A500 \u2013 Eutoria entry slip road: bridge work<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 12 September until 17 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--handford-exit-slip-road-grass-cutting\">A500 \u2013 Handford exit slip road: grass cutting<\/h2>\n<p>The southbound exit slip road will be closed overnight for one night from 9pm 12 September until 6am the following morning (13 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5127--gravelly-hill-merge-onto-a38m-into-city-aston-expressway-d-c-link-carriageway-repairs\">A5127 \u2013 Gravelly Hill merge onto A38M into City Aston Expressway (D-C Link): carriageway repairs<\/h2>\n<p>The slip into City Aston Expressway will be closed overnight between 9pm and 6am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-exit-slip-road-carriageway-work\">M40 \u2013 junction 15 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 10pm and 6am from 12 September until 16 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-16-exit-slip-road-carriageway-work\">M40 \u2013 junction 16 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 10pm and 6am from 13 September until 17 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-16-entry-slip-road-carriageway-work\">M40 \u2013 junction 16 entry slip road: carriageway work<\/h2>\n<p>The northbound entry slip road will be closed overnight between 10pm and 6am from 13 September until 16 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-exit-slip-road-carriageway-work-1\">M40 \u2013 junction 15 exit slip road: carriageway work<\/h2>\n<p>The southbound exit slip road will be closed overnight between 10pm and 6am from 13 September until 16 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-entry-slip-road-carriageway-work\">M40 \u2013 junction 15 entry slip road: carriageway work<\/h2>\n<p>The southbound entry slip road will be closed overnight between 10pm and 6am from 13 September until 17 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-entry-slip-road-carriageway-work-1\">M40 \u2013 junction 15 entry slip road: carriageway work<\/h2>\n<p>The northbound entry slip road will be closed overnight between 10pm and 6am from 13 September until 16 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-11-to-junction-10-including-junction-11-entry-slip-road-carriageway-work\">M42 \u2013 junction 11 to junction 10 including junction 11 entry slip road: carriageway work<\/h2>\n<p>The southbound carriageway and entry slip road will be closed overnight for one night from 9pm 12 September until 6am the following morning (13 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-3-exit-slip-road-pavement-investigations\">M42 \u2013 junction 3 exit slip road: pavement investigations<\/h2>\n<p>The southbound exit slip road will be closed overnight between 9pm and 5am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-3-entry-slip-road-pavement-investigations\">M42 \u2013 junction 3 entry slip road: pavement investigations<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 5am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-3-exit-slip-road-pavement-investigations-1\">M42 \u2013 junction 3 exit slip road: pavement investigations<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 5am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-10-to-junction-11-including-junction-10-entry-slip-road-installation-of-traffic-signals\">M42 \u2013 junction 10 to junction 11 including junction 10 entry slip road: installation of traffic signals<\/h2>\n<p>The northbound carriageway and entry slip road will be closed overnight for one night from 9pm 13 September until 6am the following morning (14 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-10-to-junction-11-including-junction-10-entry-slip-road-installation-of-traffic-signals-1\">M42 \u2013 junction 10 to junction 11 including junction 10 entry slip road: installation of traffic signals<\/h2>\n<p>The northbound carriageway and entry slip road will be closed overnight for one night from 9pm 14 September until 6am the following morning (15 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-6-major-scheme-work\">M5 \u2013 junction 5 to junction 6: major scheme work<\/h2>\n<p>The southbound carriageway will be fully closed in overnight between 8pm and 6am on 13, 15, 16 and 17 September. A diversion route will be clearly signposted<\/p>\n<h2 id=\"m5--junction-4a-to-junction-5-major-scheme-work\">M5 \u2013 junction 4a to junction 5: major scheme work<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am on 14 and 16 September. A diversion route will be clearly signposted<\/p>\n<h2 id=\"m5--junction-6-to-junction-5-major-scheme-work\">M5 \u2013 junction 6 to junction 5: major scheme work<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am on 14 and 17 September. A diversion route will be clearly signposted<\/p>\n<h2 id=\"m50--junction-2-exit-slip-road-safety-fence-repairs\">M50 \u2013 junction 2 exit slip road: safety fence repairs<\/h2>\n<p>The southbound carriageway and slip roads will be closed overnight for one night from 9pm 12 September until 6am the following morning (13 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-to-junction-1-including-slip-roads-carriageway-repairs\">M50 \u2013 junction 2 to junction 1 including slip roads: carriageway repairs<\/h2>\n<p>The eastbound entry slip road will be closed overnight for one night from 10pm 15 September until 6am the following morning (16 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-1-exit-slip-road-carriageway-work\">M54 \u2013 junction 1 exit slip road: carriageway work<\/h2>\n<p>The eastbound exit slip will be closed overnight for one night from 9pm 15 September until 6am the following morning (16 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-salford-circus-to-m6-rewaterproofing-and-structural-repairs\">M6 \u2013 junction 6 Salford Circus to M6: rewaterproofing and structural repairs<\/h2>\n<p>There will be a 24-hour carriageway closure in both directions from 8 July 2016 ongoing until 23 December 2017. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-exit-slip-road-carriageway-work\">M6 \u2013 junction 7 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 6am from 12 September until 18 September. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-work\">M6 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The southbound exit slip road will be closed overnight between 9pm and 6am from 12 September until 18 September.  A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-work-1\">M6 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 6am from 12 September until 18 September.  A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-1-exit-slip-road-carriageway-work\">M6 \u2013 junction 1 exit slip road: carriageway work<\/h2>\n<p>The southbound exit slip road will be closed overnight for one night from 10pm 12 September until 6am the following morning (13 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-1-entry-slip-road-carriageway-work\">M6 \u2013 junction 1 entry slip road: carriageway work<\/h2>\n<p>The northbound entry slip road will be closed overnight for one night from 10pm 13 September until 6am the following morning (14 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-exit-slip-road-to-m69-carriageway-work\">M6 \u2013 junction 2 exit slip road to M69: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight for one night from 10pm 13 September until 6am the following morning (14 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-and-exit-slip-roads-carriageway-work\">M6 \u2013 junction 2 entry and exit slip roads: carriageway work<\/h2>\n<p>The northbound entry and exit slip roads will be closed overnight for one night from 10pm 13 September until 6am the following morning (14 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-and-exit-slip-roads-carriageway-work-1\">M6 \u2013 junction 2 entry and exit slip roads: carriageway work<\/h2>\n<p>The southbound entry and exit slip roads will be closed overnight for one night from 10pm 14 September until 6am the following morning (15 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-3-entry-and-exit-slip-roads-carriageway-work\">M6 \u2013 junction 3 entry and exit slip roads: carriageway work<\/h2>\n<p>The northbound entry and exit slip roads will be closed overnight for one night from 10pm 15 September until 6am the following morning (16 September). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-3-entry-and-exit-slip-roads-carriageway-work-1\">M6 \u2013 junction 3 entry and exit slip roads: carriageway work<\/h2>\n<p>The southbound entry and exit slip roads will be closed overnight for one night from 10pm 16 September until 6am the following morning (17 September). A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/74018"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=74018"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/74018\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=74018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=74018"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=74018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}