{"id":76292,"date":"2016-11-18T16:09:41","date_gmt":"2016-11-18T16:09:41","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=546115aa8fd4399a069e5b6720360ea1"},"modified":"2016-11-18T16:09:41","modified_gmt":"2016-11-18T16:09:41","slug":"press-release-planned-road-works-in-west-midlands-weekly-summary-for-monday-21-november-to-sunday-27-november-2016","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=76292","title":{"rendered":"Press release: Planned road works in West Midlands: weekly summary for  Monday 21 November to Sunday 27 November 2016"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 18 November 2016 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--hilliards-cross-exit-slip-road-carriageway-work\">A38 \u2013 Hilliards Cross exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed 24 hours a day until 21 December. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--branston-northbound-bridge-inspections\">A38 \u2013 Branston northbound: bridge inspections<\/h2>\n<p>The northbound carriageway will be closed overnight for one night from 8pm on 21 November until 5am the following morning (22 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--streethay-to-swinfen-carriageway-work\">A38 \u2013 Streethay to Swinfen: carriageway work<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 10pm 25 November until 6am the following morning (26 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38m--m6-links-from-out-of-city-a38m-carriageway-work\">A38M \u2013 M6 Links from Out of City A38M: carriageway work<\/h2>\n<p>The links from Out of City A38M will be closed overnight between 9pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38m--tyburn-road-merge-onto-a38m-into-city-aston-expressway-f-c-links-carriageway-work\">A38M \u2013 Tyburn Road merge onto A38M into City Aston Expressway (F-C Links): carriageway work<\/h2>\n<p>The Road into City A38M will be closed overnight between 9pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a45-stonebridge-highway-eastbound-electrical-work\">A45 Stonebridge Highway eastbound: electrical work<\/h2>\n<p>The Eastbound carriageway will be closed overnight between 8pm and 6am from 23 November until 25 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--m40-junction-15-to-a46-renewal-of-road-markings\">A46 \u2013 M40 junction 15 to A46: renewal of road markings<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 9pm 21 November until 6am the following morning (22 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--coventry-eastern-bypass-carriageway-repairs\">A46 \u2013 Coventry eastern bypass: carriageway repairs<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 8pm 21 November until 6am the following morning (22 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--b4463-to-a4189-carriageway-repairs\">A46 \u2013 B4463 to A4189: carriageway repairs<\/h2>\n<p>The carriageway will be closed in both directions overnight between 9pm and 6am from 21 November until 23 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--budbrook-entry-slip-carriageway-repairs\">A46 \u2013 Budbrook entry slip: carriageway repairs<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 6am from 24 November until 26 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--hanford-to-sideway-carriageway-repairs\">A50 \u2013 Hanford to Sideway: carriageway repairs<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 6am from 21 November until 23 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--hanford-entry-slip-carriageway-repairs\">A50 \u2013 Hanford entry slip: carriageway repairs<\/h2>\n<p>The westbound entry slip will be closed overnight between 9pm and 6am from 21 November until 23 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--a5006-from-michelin-roundabout-and-a500-northbound-sideway-slip-road-material-deliveries\">A500 \u2013 A5006 from Michelin Roundabout and A500 northbound sideway slip road: material deliveries<\/h2>\n<p>The northbound carriageway and slip road will be closed overnight between 8pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5127--gravelly-hill-merge-onto-a38m-into-city-aston-expressway-d-c-link-carriageway-repairs\">A5127 \u2013 Gravelly Hill merge onto A38M into City Aston Expressway (D-C Link): carriageway repairs<\/h2>\n<p>The slip into City Aston Expressway will be closed overnight between 9pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-10-to-junction-7-camera-work\">M42 \u2013 junction 10 to junction 7: camera work<\/h2>\n<p>The southbound carriageway closed overnight between 9pm and 5am from 21 November until 26 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-major-scheme-work\">M5 \u2013 junction 6: major scheme work<\/h2>\n<p>The southbound entry slip road will be closed between 8pm and 6am from 21 November until 23 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-major-scheme-work-1\">M5 \u2013 junction 6: major scheme work<\/h2>\n<p>The northbound entry slip road will be closed overnight between 8pm and 6am from 24 November until 25 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-3-to-junction-2-carriageway-work\">M54 \u2013 junction 3 to junction 2: carriageway work<\/h2>\n<p>The eastbound carriageway will be closed overnight between 9pm and 5am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-2-entry-slip-road-to-m6-junction-10a-link-road-message-sign-repairs\">M54 \u2013 junction 2 entry slip road to M6 junction 10a link road: message sign repairs<\/h2>\n<p>The eastbound carriageway and associated slip road will be closed overnight between 8.30pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-work\">M6 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The southbound exit slip road will be closed overnight between 9pm and 6am from 21 November until 27 November.  A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-work-1\">M6 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 6am from 21 November until 27 November.  A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-to-junction-8-including-associated-slip-roads-carriageway-work\">M6 \u2013 junction 10 to junction 8 including associated slip roads: carriageway work<\/h2>\n<p>The southbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-entry-slip-road-carriageway-work\">M6 \u2013 junction 10 entry slip road: carriageway work<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-and-exit-slip-roads-carriageway-work\">M6 \u2013 junction 9 entry and exit slip roads: carriageway work<\/h2>\n<p>The southbound entry and exit slip roads will be closed overnight between 9pm and 6am from 21 November until 27 November. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-exit-slip-road-survey-work\">M6 \u2013 junction 2 exit slip road: survey work<\/h2>\n<p>The northbound exit slip road will be closed overnight for one night from 10pm 21 November until 6am the following morning (22 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-slip-road-survey-work\">M6 \u2013 junction 2 entry slip road: survey work<\/h2>\n<p>The northbound entry slip road will be closed overnight for one night from 10pm 23 November until 6am the following morning (24 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-exit-slip-road-survey-work-1\">M6 \u2013 junction 2 exit slip road: survey work<\/h2>\n<p>The southbound exit slip road will be closed overnight for one night from 10pm 24 November until 6am the following morning (25 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-slip-road-survey-work-1\">M6 \u2013 junction 2 entry slip road: survey work<\/h2>\n<p>The southbound entry slip road will be closed overnight for one night from 10pm 25 November until 6am the following morning (26 November). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m69--northbound-link-from-m69-southbound-survey-work\">M69 \u2013 northbound link from M69 southbound: survey work<\/h2>\n<p>The southbound link road will be closed overnight for one night from 8pm 22 November until 6am the following morning (23 November). A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/76292"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=76292"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/76292\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=76292"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=76292"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=76292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}