{"id":78414,"date":"2017-01-27T14:11:50","date_gmt":"2017-01-27T14:11:50","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=9b7d98fa3e05ed10b1fc9ede706d1c00"},"modified":"2017-01-27T14:11:50","modified_gmt":"2017-01-27T14:11:50","slug":"press-release-planned-roadworks-in-west-midlands-weekly-summary-for-monday-30-january-to-sunday-5-february-2017","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=78414","title":{"rendered":"Press release: Planned roadworks in West Midlands: weekly summary for Monday 30 January to Sunday 5 February 2017"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 27 January 2017 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--alrewas-to-cappers-lane-including-all-associated-slip-roads-carriageway-repairs\">A38 \u2013 Alrewas to Cappers Lane including all associated slip roads: carriageway repairs<\/h2>\n<p>The Southbound carriageway and associated Slip Road closed overnight between 8pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--cappers-lane-to-alrewas-and-associated-slip-roads-sign-inspections\">A38 \u2013 Cappers Lane to Alrewas and associated slip roads: sign inspections<\/h2>\n<p>The southbound carriageway and associated slip road closed overnight between 8pm and 6am from 30 January until 1 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38m--m6-links-from-out-of-city-a38m-carriageway-repairs\">A38M \u2013 M6 links from out of city A38M: carriageway repairs<\/h2>\n<p>The Links from Out of City A38M will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs\">A449 \u2013 Gailey roundabout to Brewood road: carriageway repairs<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a45--a4423-to-church-road-carriageway-repairs\">A45 \u2013 A4423 to Church road: carriageway repairs<\/h2>\n<p>The eastbound carriageway will be closed overnight between 8pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a456--m5-junction-3-roundabout-carriageway-repairs\">A456 \u2013 M5 junction 3 roundabout: carriageway repairs<\/h2>\n<p>The roundabout will be closed overnight between 8pm and 6am from 31 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--birmingham-road-entry-slip-road-site-investigation\">A46 \u2013 Birmingham Road entry slip road: site investigation<\/h2>\n<p>The northbound entry slip road will be closed overnight between 7pm and 7am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--warwick-bypass-link-road-northbound-site-investigation\">A46 \u2013 Warwick bypass link road northbound: site investigation<\/h2>\n<p>The northbound carriageway will be closed overnight between 7pm and 7am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--leek-wootton-entry-slip-road-site-investigation\">A46 \u2013 Leek Wootton entry slip road: site investigation<\/h2>\n<p>The northbound entry slip road will be closed overnight between 7pm and 7am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--warwick-bypass-northbound-site-investigation\">A46 \u2013 Warwick bypass northbound: site investigation<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--gledrid-roundabout-and-all-approaches-roundabout-widening-scheme\">A5 \u2013 Gledrid roundabout and all approaches: roundabout widening scheme<\/h2>\n<p>The roundabout and associated approaches will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--mile-oak-exit-slip-road-carriageway-repairs\">A5 \u2013 Mile Oak exit slip road: carriageway repairs<\/h2>\n<p>The westbound exit slip road will be closed overnight for one night from 9pm 3 February until 6am the following morning (4 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--talke-junction-island-carriageway-repairs\">A500 \u2013 Talke junction island: carriageway repairs<\/h2>\n<p>The eastside of the island will be closed for 24 hours 7 days a week from 9 January ongoing until 31 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--city-road-entry-slip-road-carriageway-repairs\">A500 \u2013 City Road entry slip road: carriageway repairs<\/h2>\n<p>The southbound entry slip road will be closed overnight for one night from 9pm 31 January until 6am the following morning (1 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a45--stonebridge-highway-westbound-carriageway-work\">A45 \u2013 Stonebridge highway westbound: carriageway work<\/h2>\n<p>The road will be closed overnight on Monday 30 and Tuesday 31 January. A diversion route will be signposted.<\/p>\n<h2 id=\"a45--stonebridge-highway-eastbound-carriageway-work\">A45 \u2013 Stonebridge highway eastbound: carriageway work<\/h2>\n<p>The road will be closed overnight on Tuesday 31 January. A diversion route will be signposted.<\/p>\n<h2 id=\"a46--coventry-eastern-bypass-southbound-carriageway-work\">A46 \u2013 Coventry eastern bypass southbound: carriageway work<\/h2>\n<p>The road will be closed overnight on 01 February. A diversion route will be signposted.<\/p>\n<h2 id=\"m42--junction-4-exit-slip-road-carriageway-work\">M42 \u2013 junction 4 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 10pm and 6am from 30 January until 9 February 23. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-1-entry-and-exit-slip-roads-off-network-carriageway-work\">M42 \u2013 junction 1 entry and exit slip roads: off network carriageway work<\/h2>\n<p>The entry and exit slip roads will be closed overnight in both directions between 9pm and 5.30am from 1st February until 5th February. A diversion route will be clearly signposted<\/p>\n<h2 id=\"m42--junction-10-entry-slip-road-carriageway-work\">M42 \u2013 junction 10 entry slip road: carriageway work<\/h2>\n<p>The northbound entry slip road will be closed overnight between 8.30pm and 5am from 2 February until 4 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-to-junction-5-northbound-major-scheme-work\">M5 \u2013 junction 6 to junction 5 northbound: major scheme work<\/h2>\n<p>The northbound carriageway  and entry slip road at junction six will be closed overnight between 8pm and 6am from 30 January until 1 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-4a-northbound-major-scheme-work\">M5 \u2013 junction 5 to 4a northbound: major scheme work<\/h2>\n<p>The northbound carriageway including the northbound entry slip road at junction five will be closed overnight between 8pm and 6am from 30 January until 2 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-6-including-southbound-entry-slip-road-major-scheme-work\">M5 \u2013 junction 5 to junction 6 including southbound entry slip road: major scheme work<\/h2>\n<p>The southbound carriageway including the entry slip road will be closed overnight between 8pm and 6am from 2 February until 3 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-to-junction-6-carriageway-repairs\">M54 \u2013 junction 5 to junction 6: carriageway repairs<\/h2>\n<p>The Westbound carriageway will be closed overnight between 8pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-entry-slip-road-carriageway-repairs\">M54 \u2013 junction 5 entry slip road: carriageway repairs<\/h2>\n<p>The westbound entry slip road will be closed overnight for one night from 8pm 30 January until 6am the following morning (31 January). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-6-to-junction-7-including-junction-6-entry-slip-road-carriageway-repairs\">M54 \u2013 junction 6 to junction 7 including junction 6 entry slip road: carriageway repairs<\/h2>\n<p>The westbound carriageway including the entry slip road will be closed overnight between 10pm and 6am from 30 January until 1 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-7-to-junction-6-including-junction-7-entry-slip-road-carriageway-repairs\">M54 \u2013 junction 7 to junction 6 including junction 7 entry slip road: carriageway repairs<\/h2>\n<p>The eastbound carriageway including the entry slip road will be closed overnight between 10pm and 6am from 1 February until 4 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-salford-circus-to-m6-carriageway-work\">M6 \u2013 junction 6 Salford Circus to M6: carriageway work<\/h2>\n<p>The carriageway will be closed overnight in both directions between 9pm and 6am from 30th January until 5th February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-slip-road-carriageway-work\">M6 \u2013 junction 2 entry slip road: carriageway work<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--m5-to-m6-junction-8-western-arm-carriageway-work\">M6 \u2013 M5 to M6 junction 8 (western arm): carriageway work<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-8-to-m5-western-arm-carriageway-work\">M6 \u2013 junction 8 to M5 (western arm): carriageway work<\/h2>\n<p>The southbound carriageway will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--hilton-park-services-exit-slip-road-carriageway-work\">M6 \u2013 Hilton Park services exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--hilton-park-services-exit-and-entry-slip-road-carriageway-work\">M6 \u2013 Hilton Park services exit and entry slip road: carriageway work<\/h2>\n<p>The southbound exit and entry slip roads will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-slip-road-carriageway-work\">M6 \u2013 junction 9 entry slip road: carriageway work<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 30 January until 5 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-16-to-junction-15-carriageway-work\">M6 \u2013 junction 16 to junction 15: carriageway work<\/h2>\n<p>The southbound carriageway will be closed overnight between 10pm and 6am from 30 January until 3 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-15-to-junction-16-including-junction-15-entry-slip-road-carriageway-work-the-northbound\">M6 \u2013 junction 15 to junction 16 including junction 15 entry slip road: carriageway work The northbound<\/h2>\n<p>carriageway and entry slip road will be closed overnight between 10pm and 6am from 30 January until 1 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-work\">M6 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The southbound exit slip road will be closed overnight for one night from 9pm 2 February until 6am the following morning (3 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-11-entry-slip-road-carriageway-work\">M6 \u2013 junction 11 entry slip road: carriageway work<\/h2>\n<p>The northbound entry slip road will be closed overnight for one night from 9pm 2 February until 6am the following morning (3 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-carriageway-work\">M6 \u2013 junction 7 entry slip road: carriageway work<\/h2>\n<p>The northbound entry slip road will be closed for 24\/7 ongoing from 3 February until 10 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-8-carriageway-work\">M6 \u2013 junction 7 to junction 8: carriageway work<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 6am from 3 February until 5 February. A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/78414"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=78414"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/78414\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=78414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=78414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=78414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}