{"id":78648,"date":"2017-02-03T16:52:42","date_gmt":"2017-02-03T16:52:42","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=8b7e6b10ec9f5c810ad3c1d9e6e759b4"},"modified":"2017-02-03T16:52:42","modified_gmt":"2017-02-03T16:52:42","slug":"press-release-planned-roadworks-in-west-midlands-weekly-summary-for-monday-6-february-to-sunday-12-february-2017","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=78648","title":{"rendered":"Press release: Planned roadworks in West Midlands: weekly summary for  Monday 6 February to Sunday 12 February 2017"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 3 February 2017 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--alrewas-to-cappers-lane-and-associated-slip-roads-carriageway-repairs\">A38 \u2013 Alrewas to Cappers Lane and associated slip roads: carriageway repairs<\/h2>\n<p>Southbound carriageway and associated slip road closed overnight between 8pm and 6am from 6 February until 8 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38m--m6-links-from-out-of-city-a38m-carriageway-repairs\">A38M \u2013 M6 links from out of city A38M: carriageway repairs<\/h2>\n<p>Links from out of city A38M will be closed overnight between 9pm and 6am from 9 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38m--m6-links-to-intercity-a38m-maintenance-scheme\">A38M \u2013 M6 links to intercity A38M: maintenance scheme<\/h2>\n<p>Links to intercity A38M will be closed overnight between 8pm and 6am from 6 February until 11 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs\">A449 \u2013 Gailey roundabout to Brewood Road: carriageway repairs<\/h2>\n<p>Southbound carriageway will be closed for 24 hours from 8pm 10 February until 6am 13 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs-1\">A449 \u2013 Gailey roundabout to Brewood Road: carriageway repairs<\/h2>\n<p>Northbound carriageway will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a456--m5-junction-3-gyratory-carriageway-repairs\">A456 \u2013 M5 junction 3 gyratory: carriageway repairs<\/h2>\n<p>The Gyratory will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46-a46a452-slip-road-carriageway-works\">A46 \u2013A46\/A452 slip road: carriageway works<\/h2>\n<p>Eastbound entry slip road will be closed overnight between 9.30pm and 6am from 7 February until 9 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46-sedgeberrow-to-evesham-drainage-works\">A46 Sedgeberrow to Evesham: drainage works<\/h2>\n<p>Carriageway will be closed in both directions overnight between 9pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--oversley-to-shottery-carriageway-repairs\">A46 \u2013 Oversley to Shottery: carriageway repairs<\/h2>\n<p>Carriageway will be closed in both directions overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--gledrid-roundabout-and-all-approaches-widening-scheme\">A5 \u2013 Gledrid roundabout and all approaches: widening scheme<\/h2>\n<p>Roundabout and associated approaches will be closed overnight between 9pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--wall-island-to-muckley-corner-carriageway-resurfacing\">A5 \u2013 Wall Island to Muckley Corner: carriageway resurfacing<\/h2>\n<p>Westbound carriageway will be closed overnight between 7pm and 6.30am from 8 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--chase-road-to-rising-sun-island-carriageway-resurfacing\">A5 \u2013 Chase Road to Rising Sun island: carriageway resurfacing<\/h2>\n<p>Westbound Carriageway including a partial closure of the Rising Sun island will be closed overnight for one night from 9pm 7 February until 6am the following morning (8 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--holy-lane-to-spon-lane-including-the-turning-to-whittington-carriageway-repairs\">A5 \u2013 Holy Lane to Spon Lane Including the turning to Whittington: carriageway repairs<\/h2>\n<p>Carriageway will be closed in both directions overnight for one night from 9pm 6 February until 6am the following morning (7 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a483--welsh-border-to-a5-mile-end-electrical-works\">A483 \u2013 Welsh border to A5 Mile End: electrical works<\/h2>\n<p>Carriageway will be closed in both directions overnight between 8pm and 6am from 6 February until 11 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-to-stanley-matthews-way-carriageway-repairs\">A50 \u2013 Meir Tunnel to Stanley Matthews Way: carriageway repairs<\/h2>\n<p>Westbound carriageway will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-to-meir-tunnel-carriageway-repairs\">A50 \u2013 Heron Cross to Meir Tunnel: carriageway repairs<\/h2>\n<p>Eastbound carriageway including associated slip roads will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-to-alhambra-interchange-carriageway-repairs\">A50 \u2013 Meir Tunnel to Alhambra Interchange: carriageway repairs<\/h2>\n<p>Westbound carriageway including associated slip roads will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-interchange-exit-slip-road-to-catchems-corner-carriageway-repairs\">A50 \u2013 Meir Interchange exit slip road to Catchems Corner: carriageway repairs<\/h2>\n<p>Eastbound Carriageway including associated slip roads will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-exit-slip-road-to-foley-road-carriageway-repairs\">A50 \u2013 Heron Cross exit slip road to Foley Road: carriageway repairs<\/h2>\n<p>Eastbound carriageway including associated slip roads will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--foley-road-exit-slip-road-to-trentham-road-exit-slip-road-to-foley-road-carriageway-repairs\">A50 \u2013 Foley Road exit slip road to Trentham Road exit slip road to Foley Road: carriageway repairs<\/h2>\n<p>Eastbound carriageway including associated slip roads will be closed overnight between 8pm and 6am from 6th February until 12th February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--blythe-bridge-entry-slip-road-to-meir-tunnel-carriageway-repairs\">A50 \u2013 Blythe Bridge entry slip road to Meir Tunnel: carriageway repairs<\/h2>\n<p>Westbound carriageway including associated slip roads will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-to-stanley-matthews-including-blurton-entry-slip-road-carriageway-repairs\">A50 \u2013 Heron Cross to Stanley Matthews including Blurton entry slip road: carriageway repairs<\/h2>\n<p>The Westbound carriageway including the associated slip Roads will be closed for 24 hours from 6am 6th February until 8pm 12th February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--blurton-road-entry-slip-road-carriageway-repairs\">A50 \u2013 Blurton Road entry slip road: carriageway repairs<\/h2>\n<p>Westbound entry slip road will be closed for 24 hours from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--talke-junction-gyratory-carriageway-repairs\">A500 \u2013 Talke junction gyratory: carriageway repairs<\/h2>\n<p>Eastside of the gyratory will be closed for 24 hours from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5127--gravelly-hill-merge-onto-a38m-carriageway-repairs\">A5127 \u2013 Gravelly Hill merge onto A38M: carriageway repairs<\/h2>\n<p>Carriageway will be closed overnight from 9pm 6 February until 6am 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-16-link-to-m42-junction-3a-carriageway-repairs\">M40 \u2013 junction 16 link to M42 junction 3a: carriageway repairs<\/h2>\n<p>Northbound link road will be closed overnight between 9pm and 6am from 6 February until 8 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--m42-junction-3a-link-to-m40-junction-16-carriageway-works\">M40 \u2013 M42 junction 3a Link to M40 Junction 16: carriageway works<\/h2>\n<p>Southbound link road will be closed overnight for one night from 9pm 7 February until 6am the following morning (8 February) A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-4-entry-slip-road-carriageway-works\">M42 \u2013 junction 4 entry slip road: carriageway works<\/h2>\n<p>Northbound slip road will be closed overnight between 10pm and 6am from 7 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-5-exit-slip-road-carriageway-works\">M42 \u2013 junction 5 exit slip road: carriageway works<\/h2>\n<p>Northbound slip road will be closed overnight between 10pm and 6am from 7 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-3-exit-slip-road-carriageway-works\">M42 \u2013 junction 3 exit slip road: carriageway works<\/h2>\n<p>Southbound slip road will be closed for one night from 9pm 7 February until 6am the following morning (8 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-4-exit-slip-road-carriageway-works\">M42 \u2013 junction 4 exit slip road: carriageway works<\/h2>\n<p>Northbound slip road closed overnight between 10pm and 6am from 6 February until 9 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junctions-4a-to-5-major-scheme-works\">M5 \u2013 junctions 4a to 5: major scheme works<\/h2>\n<p>Southbound carriageway will be closed between 8pm and 6am from 6 February until 10 February and again on 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junctions-5-to-6-major-scheme-works\">M5 \u2013 junctions 5 to 6: major scheme works<\/h2>\n<p>Southbound carriageway including southbound entry slip at junction 5 closed between 8pm and 6am from 6 February until 10 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junctions-5-to-4a-major-scheme-works\">M5 \u2013 junctions 5 to 4a: major scheme works<\/h2>\n<p>Northbound carriageway including northbound entry slip at junction 5 closed between 8pm and 6am from 7 February until 10 February and again on 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--coventry-eastern-bypass\">A46 \u2013 Coventry Eastern Bypass<\/h2>\n<p>Northbound carriageway closed between 8pm and 6am on 7 February and southbound carriageway closed at the same time on 8 and 9 and 11 and 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a45--stonebridge-highway\">A45 \u2013 Stonebridge Highway<\/h2>\n<p>Eastbound carriageway closed between 8pm and 6am from 10 to 12 February.<\/p>\n<h2 id=\"m54--junction-5-to-junction-6-carriageway-repairs\">M54 \u2013 junction 5 to junction 6: carriageway repairs<\/h2>\n<p>Westbound carriageway will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-3-to-junction-4-including-junction-3-entry-slip-road-drainage-works\">M54 \u2013 junction 3 to junction 4 including junction 3 entry slip road: drainage works<\/h2>\n<p>Westbound carriageway including the entry slip road will be closed overnight between 10pm and 6am from 9 February until 11 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-to-junction-3-including-junction-4-entry-slip-road-drainage-works\">M54 \u2013 junction 4 to junction 3 including junction 4 entry slip road: drainage works<\/h2>\n<p>Eastbound carriageway including the entry slip road will be closed overnight between 10pm and 6am from 6 February until 9 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-salford-circus-to-m6-carriageway-works\">M6 \u2013 junction 6 Salford Circus to M6: carriageway works<\/h2>\n<p>Carriageway will be closed overnight in both directions between 9pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-slip-road-carriageway-works\">M6 \u2013 junction 2 entry slip road: carriageway works<\/h2>\n<p>Southbound entry slip road will be closed overnight for one night form 9pm 5 February until 6am the following morning (6 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--hilton-park-services-exit-slip-road-carriageway-works\">M6 \u2013 Hilton Park services exit slip road: carriageway works<\/h2>\n<p>Northbound exit slip road will be closed overnight between 9pm and 6am from 6 February until 11 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--hilton-park-services-exit-and-entry-slip-road-carriageway-works\">M6 \u2013 Hilton Park Services exit and entry slip road: carriageway works<\/h2>\n<p>Southbound exit and entry slip roads will be closed overnight between 9pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-15-to-junction-16-including-junction-15-entry-slip-road-carriageway-works\">M6 \u2013 junction 15 to junction 16 including junction 15 entry slip road: carriageway works<\/h2>\n<p>Northbound carriageway and entry slip road will be closed overnight between 10pm and 6am from 8 February until 10 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-works\">M6 \u2013 junction 6 exit slip road: carriageway works<\/h2>\n<p>Southbound exit slip road will be closed overnight between 9pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-14-to-junction-15-including-junction-14-entry-slip-road-carriageway-works\">M6 \u2013 junction 14 to junction 15 including junction 14 entry slip road: carriageway works<\/h2>\n<p>Northbound carriageway and entry slip road will be closed overnight for one night from 10pm 10 February until 6am the following morning. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-13-to-junction-12-carriageway-works\">M6 \u2013 junction 13 to junction 12: carriageway works<\/h2>\n<p>The Southbound carriageway will be closed overnight between 10pm and 6am from 7th February until 9th February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-16-to-junction-15-including-junction-16-entry-slip-road-carriageway-works\">M6 \u2013 junction 16 to junction 15 including junction 16 entry slip road: carriageway works<\/h2>\n<p>Southbound carriageway and entry slip road will be closed overnight between 10pm and 6am from 6th February until 8th February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-exit-slip-road-carriageway-works-1\">M6 \u2013 junction 6 exit slip road: carriageway works<\/h2>\n<p>Northbound exit slip road will be closed overnight between 9pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-slip-road-carriageway-works\">M6 \u2013 junction 6 slip road: carriageway works<\/h2>\n<p>North and southbound entry and exit slip road will be closed for 24 hours from 9pm 6 February until 6am 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-15-to-junction-16-including-junction-15-entry-slip-road-carriageway-works-1\">M6 \u2013 junction 15 to junction 16 including junction 15 entry slip road: carriageway works<\/h2>\n<p>Northbound carriageway and entry slip road will be closed overnight between 8pm and 6am from 6 February until 11 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-8-to-m5-junction-1-link-road-western-arm-carriageway-works\">M6 \u2013 junction 8 to M5 junction 1 link road (Western Arm): carriageway works<\/h2>\n<p>Southbound link road will be closed overnight between 8pm and 6am from 6 February until 12 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m69--junction-1-to-m6-junction-2-link-road-carriageway-works\">M69 \u2013 junction 1 to M6 junction 2 link road: carriageway works<\/h2>\n<p>Northbound link road will be closed overnight between 9pm and 6am from 6 February until 8 February. A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/78648"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=78648"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/78648\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=78648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=78648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=78648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}