{"id":79257,"date":"2017-02-24T16:29:32","date_gmt":"2017-02-24T16:29:32","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=2fa744c93c3fab55cb9481b23e7b89d5"},"modified":"2017-02-24T16:29:32","modified_gmt":"2017-02-24T16:29:32","slug":"press-release-planned-road-works-in-west-midlands-weekly-summary-for-monday-27-february-to-sunday-5-march-2017","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=79257","title":{"rendered":"Press release: Planned road works in West Midlands: weekly summary for  Monday 27 February to Sunday 5 March 2017"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 24 February 2017 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--claymills-to-wood-end-lane-carriageway-repairs\">A38 \u2013 Claymills to Wood End lane: carriageway repairs<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--alrewas-to-toyota-carriageway-repairs\">A38 \u2013 Alrewas to Toyota: carriageway repairs<\/h2>\n<p>The northbound carriageway and all associated slip roads will be closed overnight between 8pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs\">A449 \u2013 Gailey roundabout to Brewood road, carriageway repairs<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs-1\">A449 \u2013 Gailey roundabout to Brewood road, carriageway repairs<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a45a46-tollbar-roundabout-underpass-street-lighting-repairs\">A45\/A46 Tollbar roundabout underpass: street lighting repairs<\/h2>\n<p>The eastbound carriageway will be closed overnight for one night from 8pm on 2 March until 6am the following morning (3 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--salford-priors-to-oversley-carriageway-repairs\">A46 \u2013 Salford Priors to Oversley: carriageway repairs<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--gledrid-roundabout-and-all-approaches-carriageway-resurfacing\">A5 \u2013 Gledrid roundabout and all approaches: carriageway resurfacing<\/h2>\n<p>The roundabout and all approaches will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--wall-island-to-muckley-corner-carriageway-resurfacing\">A5 \u2013 Wall Island to Muckley Corner: carriageway resurfacing<\/h2>\n<p>The westbound carriageway will be closed overnight between 7pm and 6.30am from 27 February until 4 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-to-stanley-matthews-way-carriageway-repairs\">A50 \u2013 Meir Tunnel to Stanley Matthews Way: carriageway repairs<\/h2>\n<p>The westbound carriageway will be closed overnight between 8pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-to-stanley-matthews-interchange-burton-road-entry-slip-carriageway-repairs\">A50 \u2013 Heron Cross to Stanley Matthews Interchange Burton Road entry slip: carriageway repairs<\/h2>\n<p>The westbound carriageway will be fully closed from 6am 8 February ongoing until 8pm on 7 July. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--foley-road-exit-slip-road-to-trentham-road-carriageway-repairs\">A50 \u2013 Foley Road exit slip road to Trentham road: carriageway repairs<\/h2>\n<p>The eastbound carriageway and all associated slip roads will be closed overnight for one night from 8pm on 27 February until 6am the following morning (28 February). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-exit-slip-road-to-meir-tunnel-carriageway-repairs\">A50 \u2013 Heron Cross exit slip road to Meir Tunnel: carriageway repairs<\/h2>\n<p>The eastbound carriageway and all associated slip roads will be closed overnight between 8pm and 6am from 27 February to 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--talke-island-including-exit-slip-roads-and-approaches-carriageway-repairs-srw-3852911\">A500 \u2013 Talke Island including exit slip roads and approaches: carriageway repairs (SRW: 3852911)<\/h2>\n<p>The eastside of the gyratory including all associated slip roads and approaches will be fully closed from midnight on 11 January until midnight on 30 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--talke-junction-carriageway-repairs\">A500 \u2013 Talke junction: carriageway repairs<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 8pm on 28 February until 6am the following morning (1 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--talke-junction-carriageway-repairs-1\">A500 \u2013 Talke junction: carriageway repairs<\/h2>\n<p>The northbound carriageway will be closed overnight for one night from 8pm on 1 March until 6am the following morning (2 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-3a-m42-to-m40-link-road-carriageway-works\">M40 \u2013 junction 3a M42 to M40 link road: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 10pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-entry-slip-road-carriageway-works\">M40 \u2013 junction 15 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-16-entry-slip-road-carriageway-work\">M40 \u2013 junction 16 entry slip road: carriageway work<\/h2>\n<p>The Northbound Entry Slip Road will be closed overnight between 9pm and 6am from 27th February until 5th March. A diversion route will be clearly signposted<\/p>\n<h2 id=\"m40--junction-15-to-m42-junction-3a-carriageway-works\">M40 \u2013 junction 15 to M42 junction 3a: carriageway works<\/h2>\n<p>The northbound carriageway and associated slip roads will be closed overnight between 10pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-5-exit-slip-road-carriageway-work\">M42 \u2013 junction 5 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 10pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--m6-junction-4a-to-m42-carriageway-works\">M42 \u2013 M6 junction 4a to M42: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 10pm and 5am from 27 February until 4 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-3a-to-junction-5-including-junction-4-entry-slip-carriageway-works\">M42 \u2013 junction 3a to junction 5 including junction 4 entry slip: carriageway works<\/h2>\n<p>The northbound carriageway including junction 4 entry slip road will be closed overnight between 10pm and 6am from 27 February until 3 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-5-entry-slip-to-junction-6-carriageway-works\">M42 \u2013 junction 5 entry slip to junction 6: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 10pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-exit-slip-road-carriageway-work\">M42 \u2013 junction 6 exit slip road: carriageway work<\/h2>\n<p>The northbound exit slip road will be closed overnight between 10pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-1-exit-and-entry-slip-road-carriageway-work\">M42 \u2013 junction 1 exit and entry slip road: carriageway work<\/h2>\n<p>The entry slip and exit slip roads will be closed overnight in both directions between 9pm and 5.30am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-4-exit-slip-road-carriageway-work\">M42 \u2013 junction 4 exit slip road: carriageway work<\/h2>\n<p>The southbound exit road will be closed overnight from 9pm 2 March until 6am the following morning (3 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--m6-junction-4a-southbound-to-m42-junction-8-northbound-carriageway-work\">M42 \u2013 M6 junction 4a southbound to M42 junction 8 northbound: carriageway work<\/h2>\n<p>The link will be closed overnight between 10pm and 6am from 2 March until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-4a-to-junction-5-carriageway-works\">M5 \u2013 junction 4a to junction 5: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am on 27, 28, 1, 2 and 3 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-4a-northbound-carriageway-works\">M5 \u2013 junction 5 to junction 4a northbound: carriageway works<\/h2>\n<p>The carriageway will be closed overnight between 8pm and 6am on 27, 28, 1, 2 and 3 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-to-junction-5-carriageway-works\">M5 \u2013 junction 6 to junction 5: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am on 27, 28, 1, 2 and 3 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-6-carriageway-works\">M5 \u2013 junction 5 to junction 6: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am on 27 and 28 February. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-to-junction-6-carriageway-repairs\">M54 \u2013 junction 5 to junction 6: carriageway repairs<\/h2>\n<p>The westbound carriageway will be closed overnight between 8pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-6-entry-slip-road-carriageway-repairs\">M54 \u2013 Junction 6 entry slip road: carriageway repairs<\/h2>\n<p>The westbound entry slip road carriageway will be closed overnight between 8pm and 6am from 3 March until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-to-junction-7-including-junction-10-and-9-entry-slip-roads-and-link-from-m5-carriageway-works\">M6 \u2013 junction 10 to junction 7 including junction 10 and 9 entry slip roads and link from M5: carriageway works<\/h2>\n<p>The southbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-11-entry-slip-road-to-junction-10-exit-including-m54-junction-1-entry-slip-road-carriageway-works\">M6 \u2013 junction 11 entry slip road to junction 10 exit including M54 junction 1 entry slip road: carriageway works<\/h2>\n<p>The southbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-10-including-junction-9-entry-slip-and-link-from-m5-northbound-carriageway-works\">M6 \u2013 junction 7 to junction 10 including junction 9 entry slip and link from M5 northbound: carriageway works<\/h2>\n<p>The northbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-entry-slip-road-to-junction-11-exit-slip-road-carriageway-works\">M6 \u2013 junction 10 entry slip road to junction 11 exit slip road: carriageway works<\/h2>\n<p>The northbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--m5-to-m6-junction-8-northbound-western-arm-carriageway-works\">M6 \u2013 M5 to M6 junction 8 northbound (western arm): carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-exit-slip-road-carriageway-works\">M6 \u2013 junction 9 exit slip road: carriageway works<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-8-to-m5-southbound-western-arm-carriageway-works\">M6 \u2013 junction 8 to M5 southbound (western arm): carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-slip-road-carriageway-works\">M6 \u2013 junction 9 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-slip-road-carriageway-works-1\">M6 \u2013 junction 9 entry slip road: carriageway works<\/h2>\n<p>The southbound Entry Slip Road will be closed overnight between 9pm and 6am from 27th February until 5th March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-5-to-junction-6-carriageway-works\">M6 \u2013 junction 5 to junction 6: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 10pm and 6am from 27 February until 4 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-12-entry-slip-road-carriageway-works\">M6 \u2013 junction 12 entry slip road: carriageway works<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 28 February until 2 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-12-to-junction-11-carriageway-works\">M6 \u2013 junction 12 to junction 11: carriageway works<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 28 February until 2 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-16-to-junction-15-carriageway-works\">M6 \u2013 junction 16 to junction 15: carriageway works<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 2 March until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-carriageway-works\">M6 \u2013 junction 7 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 9am from 3 March until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-8-carriageway-works\">M6 \u2013 junction 7 to junction 8: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 9am from 3 March until 5 March. A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79257"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=79257"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79257\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=79257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=79257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=79257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}