{"id":79463,"date":"2017-03-06T11:25:24","date_gmt":"2017-03-06T11:25:24","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=da00601d3e2067d963c8cefb4def9705"},"modified":"2017-03-06T11:25:24","modified_gmt":"2017-03-06T11:25:24","slug":"press-release-planned-roadworks-in-west-midlands-weekly-summary-for-monday-6-march-to-sunday-12-march-2017","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=79463","title":{"rendered":"Press release: Planned roadworks in West Midlands: weekly summary for Monday 6 March to Sunday 12 March 2017"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 6 March 2017 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--claymills-to-wood-end-lane-carriageway-repairs\">A38 \u2013 Claymills to Wood End Lane: carriageway repairs<\/h2>\n<p>Southbound carriageway closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--alrewas-to-toyota-carriageway-repairs\">A38 \u2013 Alrewas to Toyota: carriageway repairs<\/h2>\n<p>Northbound carriageway and all associated slip roads closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs\">A449 \u2013 Gailey roundabout to Brewood Road: carriageway repairs<\/h2>\n<p>Northbound carriageway closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs-1\">A449 \u2013 Gailey Roundabout to Brewood Road: carriageway repairs<\/h2>\n<p>Southbound carriageway closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--twyford-to-badsey-carriageway-repairs\">A46 \u2013 Twyford to Badsey: carriageway repairs<\/h2>\n<p>Carriageway closed in both directions overnight for one night from 10pm 9 March until 6am the following morning (10 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--wellington-marsh-carriageway-repairs\">A49 \u2013 Wellington Marsh: carriageway repairs<\/h2>\n<p>Carriageway closed in both directions overnight between 10pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--gledrid-roundabout-and-all-approaches-carriageway-resurfacing\">A5 \u2013 Gledrid roundabout and all approaches: carriageway resurfacing<\/h2>\n<p>Roundabout and all approaches closed overnight between 9pm and 6am from 27 February until 5 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--wall-island-to-muckley-corner-carriageway-resurfacing\">A5 \u2013 Wall Island to Muckley Corner: carriageway resurfacing<\/h2>\n<p>Westbound carriageway closed overnight between 7pm and 6.30am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-to-stanley-matthews-way-carriageway-repairs\">A50 \u2013 Meir Tunnel to Stanley Matthews Way: carriageway repairs<\/h2>\n<p>Westbound carriageway closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-to-stanley-matthews-interchange-burton-road-entry-slip-carriageway-repairs\">A50 \u2013 Heron Cross to Stanley Matthews Interchange Burton Road entry slip: carriageway repairs<\/h2>\n<p>Westbound Carriageway will be closed 24 hours 7 days a week until 7 July. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-exit-slip-road-to-foley-road-carriageway-repairs\">A50 \u2013 Heron Cross exit slip road to Foley Road: carriageway repairs<\/h2>\n<p>Eastbound carriageway and all associated slip roads closed overnight between 8pm and 6am from 6 March until 9 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-carriageway-repairs\">A50 \u2013 Meir Tunnel: carriageway repairs<\/h2>\n<p>Carriageway closed in both directions overnight between 8pm and 5.30am from 7 March until 10 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-interchange-exit-slip-road-to-catchems-corner-carriageway-repairs\">A50 \u2013 Meir Interchange exit slip road to Catchems Corner: carriageway repairs<\/h2>\n<p>Eastbound carriageway and all associated slip road closed overnight between 8pm and 6am from 9 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--porthill-exit-slip-vegetation-clearance\">A500 \u2013 Porthill exit slip: vegetation clearance<\/h2>\n<p>Northbound exit slip road closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--wolstanton-exit-slip-vegetation-clearance\">A500 \u2013 Wolstanton exit slip: vegetation clearance<\/h2>\n<p>Southbound exit slip closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-to-m42-junction-3a-west-midlands-carriageway-works\">M40 \u2013 junction 15 to M42 junction 3a. West Midlands: carriageway works<\/h2>\n<p>Northbound carriageway and associated slip roads closed overnight between 10pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-16-entry-slip-road-carriageway-works\">M40 \u2013 junction 16 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-entry-slip-road-carriageway-works\">M40 \u2013 junction 15 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-3a-m42-to-m40-link-road-carriageway-works\">M40 \u2013 junction 3a M42 to M40 link road: carriageway works<\/h2>\n<p>Southbound carriageway closed overnight between 10pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-1-exit-and-entry-slip-road-carriageway-works\">M42 \u2013 junction 1 exit and entry slip road: carriageway works<\/h2>\n<p>Northbound exit slip road closed overnight between 10pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-entry-slip-road-carriageway-works\">M42 \u2013 junction 6 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight between 10pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--m6-junction-4a-to-m42-junction-8-north-link-carriageway-works\">M42 \u2013 M6 junction 4a to M42 junction 8 north link: carriageway works<\/h2>\n<p>Northbound link road closed overnight between 10pm and 5am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-5-entry-slip-to-junction-6-carriageway-works\">M42 \u2013 junction 5 entry slip to junction 6: carriageway works<\/h2>\n<p>Northbound carriageway closed overnight between 10pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-exit-slip-road-carriageway-works\">M42 \u2013 junction 6 exit slip road: carriageway works<\/h2>\n<p>Northbound exit slip road closed overnight between 10pm and 6am from 6 March until 12March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-10-to-junction-11-carriageway-works\">M42 \u2013 junction 10 to junction 11: carriageway works<\/h2>\n<p>Northbound carriageway closed overnight for one night from 10pm 6 March until 6am the following morning (7 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-exit-slip-road-carriageway-works-1\">M42 \u2013 junction 6 exit slip road: carriageway works<\/h2>\n<p>Southbound exit slip road closed overnight between 9pm and 6am from 9 March until 14 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--m6-junction-4-exit-slip-road-northboundlink-to-m42-carriageway-works\">M42 \u2013 M6 junction 4 exit slip road northbound\/link to M42: carriageway works<\/h2>\n<p>Northbound exit slip road closed overnight between 8pm and 6am from 11 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-4a-to-junction-5-carriageway-works\">M5 \u2013 junction 4a to junction 5: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am from 6 March until 10 March and on 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-4a-carriageway-works\">M5 \u2013 junction 5 to junction 4a: carriageway works<\/h2>\n<p>The northbound carriageway including the northbound entry slip at junction 5 will be closed overnight from 6 March until 10 March and on 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-to-junction-5-carriageway-works\">M5 \u2013 junction 6 to junction 5: carriageway works<\/h2>\n<p>The northbound carriageway closure including the northbound entry slip at junction 6 will be closed overnight from 6 March until 10 March and on 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-6-carriageway-works\">M5 \u2013 junction 5 to junction 6: carriageway works<\/h2>\n<p>The southbound carriageway closure including the southbound entry slip will be closed overnight from 6 March until 10 March and on 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-2-to-junction-1-carriageway-repairs\">M50 \u2013 junction 2 to junction 1: carriageway repairs<\/h2>\n<p>Eastbound carriageway closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-4-to-junction-2-carriageway-repairs\">M50 \u2013 junction 4 to junction 2: carriageway repairs<\/h2>\n<p>Westbound carriageway closed overnight between 8pm and 6am from 8 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-to-junction-6-carriageway-repairs\">M54 \u2013 junction 5 to junction 6: carriageway repairs<\/h2>\n<p>Westbound carriageway closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-entry-slip-road-carriageway-repairs\">M54 \u2013 junction 5 entry slip road: carriageway repairs<\/h2>\n<p>Westbound entry slip road carriageway closed overnight between 8pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-6-entry-slip-road-carriageway-repairs\">M54 \u2013 junction 6 entry slip road: carriageway repairs<\/h2>\n<p>Eastbound entry slip road carriageway closed overnight for one night from 10pm 6 March until 5am the following morning (7 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-to-junction-7-including-junction-10-and-9-entry-slip-roads-and-link-from-m5-carriageway-works\">M6 \u2013 junction 10 to junction 7 including junction 10 and 9 entry slip roads and link from M5: carriageway works<\/h2>\n<p>Southbound carriageway and associated slip roads closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-11-entry-slip-road-to-junction-10-exit-including-m54-junction-1-entry-slip-road-carriageway-works\">M6 \u2013 junction 11 entry slip road to junction 10 exit including M54 junction 1 entry slip road: carriageway works<\/h2>\n<p>Southbound carriageway and associated slip roads closed overnight between 9pm and 6am from 6 March until 12 March A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-10-including-junction-9-entry-slip-and-link-from-m5-northbound-carriageway-works\">M6 \u2013 junction 7 to junction 10 including junction 9 entry slip and link from M5 northbound: carriageway works<\/h2>\n<p>Northbound carriageway and associated slip roads closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-entry-slip-road-to-junction-11-exit-slip-road-carriageway-works\">M6 \u2013 junction 10 entry slip road to junction 11 exit slip road: carriageway works<\/h2>\n<p>Northbound carriageway and associated slip roads closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-carriageway-works\">M6 \u2013 junction 7 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight between 9pm and 6am from 10 March until 13 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-8-carriageway-works\">M6 \u2013 junction 7 to junction 8: carriageway works<\/h2>\n<p>Northbound carriageway closed overnight between 9pm and 6am from 10 March until 13 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-exit-slip-road-carriageway-works\">M6 \u2013 junction 9 exit slip road: carriageway works<\/h2>\n<p>Northbound exit slip road closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-slip-road-carriageway-works\">M6 \u2013 junction 9 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight between 9pm and 6am from 6 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-13-entry-slip-road-carriageway-works\">M6 \u2013 junction 13 entry slip road: carriageway works<\/h2>\n<p>Southbound entry slip road closed overnight for one night from 10pm 6 March until 5.30am the following morning (7 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-to-junction-5-carriageway-works\">M6 \u2013 junction 6 to junction 5: carriageway works<\/h2>\n<p>Southbound carriageway closed overnight between 10pm and 6am from 6 March until 11 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-15-to-junction-14-including-junction-15-entry-slip-road-carriageway-works\">M6 \u2013 junction 15 to junction 14 including junction 15 entry slip road: carriageway works<\/h2>\n<p>Southbound carriageway and entry slip road closed overnight for one night from 10pm 7 March until 6am the following morning. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-16-entry-slip-to-junction-15-carriageway-works\">M6 \u2013 junction 16 entry slip to junction 15: carriageway works<\/h2>\n<p>Southbound carriageway and entry slip road closed overnight between 10pm and 6am from 8 March until 10 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-5-to-junction-6-carriageway-works\">M6 \u2013 junction 5 to junction 6: carriageway works<\/h2>\n<p>Northbound carriageway closed overnight for one night from 10pm 10 March until 6am the following morning (11 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-entry-slip-to-junction-7-carriageway-works\">M6 \u2013 junction 10 entry slip to junction 7: carriageway works<\/h2>\n<p>Southbound carriageway and entry slip road closed overnight for one night from 10pm 10 March until 6am the following morning (11 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-4-exit-slip-and-entry-slip-roads-carriageway-works\">M6 \u2013 junction 4 exit slip and entry slip roads: carriageway works<\/h2>\n<p>Northbound exit and entry slip roads closed overnight for one night from 10pm 11 March until 6am the following morning (12 March). A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79463"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=79463"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79463\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=79463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=79463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=79463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}