{"id":79711,"date":"2017-03-14T11:53:18","date_gmt":"2017-03-14T11:53:18","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=f7e1a37559c716d575fdee860525f081"},"modified":"2017-03-14T11:53:18","modified_gmt":"2017-03-14T11:53:18","slug":"press-release-planned-roadworks-in-west-midlands-weekly-summary-for-monday-13-march-to-sunday-19-march-2017","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=79711","title":{"rendered":"Press release: Planned roadworks in West Midlands: weekly summary for Monday 13 March to Sunday 19 March 2017"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 10 March 2017 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--claymills-to-wood-end-lane-carriageway-repairs\">A38 \u2013 Claymills to Wood End Lane: carriageway repairs<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--alrewas-to-toyota-carriageway-repairs\">A38 \u2013 Alrewas to Toyota: carriageway repairs<\/h2>\n<p>The northbound carriageway and all associated slip roads will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--claymills-to-a50-wood-end-lane-carriageway-repairs\">A38 \u2013 Claymills to A50 Wood End Lane: carriageway repairs<\/h2>\n<p>The southbound carriageway and all associated slip roads will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs\">A449 \u2013 Gailey roundabout to Brewood road: carriageway repairs<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs-1\">A449 \u2013 Gailey roundabout to Brewood road: carriageway repairs<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am from 13 March until 19  March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--leek-wooton-entry-slip-road-carriageway-repairs\">A46 \u2013 Leek Wooton entry slip road: carriageway repairs<\/h2>\n<p>The southbound entry slip road will be closed overnight for one night from 9.30pm 14 March until 6am the following morning (15 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--wellington-marsh-carriageway-repairs\">A49 \u2013 Wellington Marsh: carriageway repairs<\/h2>\n<p>The carriageway will be closed in both directions overnight between 10pm and 6am from 13 March until 15 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a49--grafton-lane-to-holme-lacy-carriageway-repairs\">A49 \u2013 Grafton Lane to Holme Lacy: carriageway repairs<\/h2>\n<p>The carriageway will be closed in both directions overnight between 7pm and 6.30am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--gledrid-roundabout-and-all-approaches-carriageway-resurfacing\">A5 \u2013 Gledrid roundabout and all approaches: carriageway resurfacing<\/h2>\n<p>The roundabout and all approaches will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--ventura-to-mile-oak-carriageway-resurfacing\">A5 \u2013 Ventura to Mile Oak: carriageway resurfacing<\/h2>\n<p>The westbound carriageway will be closed overnight for one night from 9pm 13 March until 6am the following morning (14 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--hanney-hay-to-muckley-corner-west-midlands-carriageway-resurfacing\">A5 \u2013 Hanney Hay to Muckley Corner. West Midlands. Carriageway resurfacing<\/h2>\n<p>The Carriageway will be closed in both directions overnight for one night from 9pm 15th March until 6am the following morning (16th March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-to-stanley-matthews-way-carriageway-repairs\">A50 \u2013 Meir Tunnel to Stanley Matthews Way: carriageway repairs<\/h2>\n<p>The westbound carriageway will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-to-stanley-matthews-interchange-burton-road-entry-slip-carriageway-repairs\">A50 \u2013 Heron Cross to Stanley Matthews Interchange Burton Road entry slip: carriageway repairs<\/h2>\n<p>The westbound carriageway will be closed 24\/7 from 6am on 8 February until 8pm on 7 July. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-exit-slip-road-to-foley-road-carriageway-repairs\">A50 \u2013 Heron Cross exit slip road to Foley road: carriageway repairs<\/h2>\n<p>The eastbound carriageway and all associated slip roads will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-interchange-exit-slip-road-to-catchems-corner-carriageway-repairs\">A50 \u2013 Meir Interchange exit slip road to Catchems corner: carriageway repairs<\/h2>\n<p>The eastbound carriageway and all associated slip road will be closed overnight for one night from 8pm on 13 March until 6am the following morning (14 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--porthill-exit-slip-vegetation-clearance\">A500 \u2013 Porthill exit slip: vegetation clearance<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--wolstanton-exit-slip-vegetation-clearance\">A500 \u2013 Wolstanton exit slip: vegetation clearance<\/h2>\n<p>The southbound exit slip road will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--hanchurch-to-hanford-carriageway-repairs\">A500 \u2013 Hanchurch to Hanford: carriageway repairs<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 6am from 13 March until 18 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--alsager-to-talke-carriageway-repairs\">A500 \u2013 Alsager to Talke: carriageway repairs<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am from 18 March until 20 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-to-m42-junction-3a-carriageway-works\">M40 \u2013 junction 15 to M42 junction 3a: carriageway works<\/h2>\n<p>The northbound carriageway and associated slip roads will be closed overnight between 10pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-16-entry-slip-road-carriageway-works\">M40 \u2013 junction 16 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-entry-slip-road-carriageway-works\">M40 \u2013 junction 15 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-3a-m42-to-m40-link-road-carriageway-works\">M40 \u2013 junction 3a M42 to M40 link road: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 10pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-1-exit-and-entry-slip-road-carriageway-works\">M42 \u2013 junction 1 exit and entry slip road: carriageway works<\/h2>\n<p>The northbound exit slip road will be closed overnight between 10pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-exit-slip-road-carriageway-works\">M42 \u2013 junction 6 exit slip road: carriageway works<\/h2>\n<p>The northbound exit slip road will be closed overnight between 10pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-5-entry-slip-to-junction-6-carriageway-works\">M42 \u2013 junction 5 entry slip to junction 6: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 10pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-exit-slip-road-carriageway-works-1\">M42 \u2013 junction 6 exit slip road: carriageway works<\/h2>\n<p>The southbound exit slip road will be closed overnight for one night from 9pm 13 March until 6am the following morning (14 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-entry-slip-road-carriageway-works\">M42 \u2013 junction 6 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 10pm and 6am from 13 March until 15 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--m6-junction-4-northbound-link-to-m42-southbound-carriageway-works\">M42 \u2013 M6 junction 4 northbound link to M42 southbound: carriageway works<\/h2>\n<p>The northbound link to M42 southbound will be closed overnight between 8pm and 5.30am from 13 March until 12 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-4a-to-junction-5-carriageway-works\">M5 \u2013 junction 4a to junction 5: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 8pm and 6am on 13 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-4a-carriageway-works\">M5 \u2013 junction 5 to junction 4a: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 8pm and 6am from 13 March until 17 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-to-junction-5-carriageway-works\">M5 \u2013 junction 6 to junction 5: carriageway works<\/h2>\n<p>The slip roads in both directions will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-4-to-junction-2-carriageway-repairs\">M50 \u2013 junction 4 to junction 2: carriageway repairs<\/h2>\n<p>The westbound carriageway will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-to-junction-6-carriageway-repairs\">M54 \u2013 junction 5 to junction 6: carriageway repairs<\/h2>\n<p>The westbound carriageway will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-entry-slip-road-carriageway-repairs\">M54 \u2013 junction 5 entry slip road: carriageway repairs<\/h2>\n<p>The westbound entry slip road will be closed overnight between 8pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-slip-roads-carriageway-repairs\">M54 \u2013 junction 4 slip roads: carriageway repairs<\/h2>\n<p>The eastbound slip roads will be closed overnight for one night from 8pm 13 March until 5am the following morning (14 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-to-junction-7-including-junction-10-and-9-entry-slip-roads-and-link-from-m5-carriageway-works\">M6 \u2013 junction 10 to junction 7 including junction 10 and 9 entry slip roads and link from M5: carriageway works<\/h2>\n<p>The southbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 13 March until 18 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-11-entry-slip-road-to-junction-10-exit-including-m54-junction-1-entry-slip-road-carriageway-works\">M6 \u2013 junction 11 entry slip road to junction 10 exit including M54 junction 1 entry slip road: carriageway works<\/h2>\n<p>The southbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-10-including-junction-9-entry-slip-and-link-from-m5-northbound-carriageway-works\">M6 \u2013 junction 7 to junction 10 including junction 9 entry slip and link from M5 northbound: carriageway works<\/h2>\n<p>The northbound carriageway and associated slip roads will be closed overnight between 9pm and 6am from 13 March until 18 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-carriageway-works\">M6 \u2013 junction 7 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 6am from 17 March until 20 March. These works are only taking place Friday, Saturday and Sunday nights only. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-8-carriageway-works\">M6 \u2013 junction 7 to junction 8: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight between 9pm and 6am from 17 March until 20 March. These works are only taking place Friday, Saturday and Sunday nights only. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-exit-slip-road-carriageway-works\">M6 \u2013 junction 9 exit slip road: carriageway works<\/h2>\n<p>The northbound exit slip road will be closed overnight between 9pm and 6am from 13 March until 18 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-8-to-m5-southbound-western-arm-carriageway-works\">M6 \u2013 junction 8 to M5 southbound (Western Arm): carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-slip-road-carriageway-works\">M6 \u2013 junction 9 entry slip road: carriageway works<\/h2>\n<p>The northbound entry slip road will be closed overnight between 9pm and 6am from 13 March until 18 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-slip-road-carriageway-works-1\">M6 \u2013 junction 9 entry slip road: carriageway works<\/h2>\n<p>The southbound entry slip road will be closed overnight between 9pm and 6am from 13 March until 18 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-exit-slip-road-carriageway-works-1\">M6 \u2013 junction 9 exit slip road: carriageway works<\/h2>\n<p>The southbound exit slip road will be closed overnight between 9pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-slip-to-junction-4-entry-slip-carriageway-works\">M6 \u2013 junction 2 entry slip to junction 4 entry slip: carriageway works<\/h2>\n<p>The northbound carriageway and associated slip roads will be closed overnight between 10pm and 6am from 13 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-12-exit-slip-road-carriageway-works\">M6 \u2013 junction 12 exit slip road: carriageway works<\/h2>\n<p>The northbound exit slip road will be closed overnight for one night from 9pm 14 March until 6am the following morning (15 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-16-to-junction-15-carriageway-works\">M6 \u2013 junction 16 to junction 15: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 10pm 14 March until 6am the following morning (15 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-6-carriageway-works\">M6 \u2013 junction 7 to junction 6: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 9pm on 15 March until 6am the following morning (16 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-5-to-junction-6-carriageway-works\">M6 \u2013 junction 5 to junction 6: carriageway works<\/h2>\n<p>The northbound carriageway will be closed overnight for one night from 10pm on 18 March until 6am the following morning (19 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-6-to-junction-5-carriageway-works\">M6 \u2013 junction 6 to junction 5: carriageway works<\/h2>\n<p>The southbound carriageway will be closed overnight for one night from 10pm on 19 March until 6am the following morning (20 March). A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79711"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=79711"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79711\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=79711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=79711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=79711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}