{"id":79920,"date":"2017-03-21T09:23:05","date_gmt":"2017-03-21T09:23:05","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=99a28854565b8ea8f24177e75c0ef260"},"modified":"2017-03-21T09:23:05","modified_gmt":"2017-03-21T09:23:05","slug":"press-release-planned-roadworks-in-west-midlands-weekly-summary-for-monday-20-march-to-sunday-26-march-2017","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=79920","title":{"rendered":"Press release: Planned roadworks in West Midlands: weekly summary for Monday 20 March to Sunday 26 March 2017"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The following summary of planned new and ongoing road improvements over the coming week is correct as of 17 March 2017 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.<\/p>\n<h2 id=\"a38--alrewas-to-toyota-carriageway-repairs\">A38 \u2013 Alrewas to Toyota: carriageway repairs<\/h2>\n<p>Southbound carriageway and all associated slip roads closed overnight between 8pm and 6am from 23 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a38--claymills-to-a50-wood-end-lane-carriageway-repairs\">A38 \u2013 Claymills to A50 Wood End Lane: carriageway repairs<\/h2>\n<p>Southbound carriageway and all associated slip roads closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs\">A449 \u2013 Gailey roundabout to Brewood Road: carriageway repairs<\/h2>\n<p>Northbound carriageway closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a449--gailey-roundabout-to-brewood-road-carriageway-repairs-1\">A449 \u2013 Gailey roundabout to Brewood Road: carriageway repairs<\/h2>\n<p>Southbound carriageway closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a46--kenilworth-exit-slip-road-to-stivichall-rounadbout-carriageway-repairs\">A46 \u2013 Kenilworth exit slip road to Stivichall rounadbout: carriageway repairs<\/h2>\n<p>Southbound carriageway closed overnight for one night from 8pm 21 March until 6am the following morning (22 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--gledrid-roundabout-and-all-approaches-carriageway-resurfacing\">A5 \u2013 Gledrid roundabout and all approaches: carriageway resurfacing<\/h2>\n<p>Roundabout and all approaches closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a5--m54-junction-7-to-preston-boats-island-carriageway-works\">A5 \u2013 M54 junction 7 to Preston Boats island: carriageway works<\/h2>\n<p>East and westbound carriageway closed overnight between 9pm and 6am from 20 March until 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-tunnel-to-stanley-matthews-way-carriageway-repairs\">A50 \u2013 Meir tunnel to Stanley Matthews Way: carriageway repairs<\/h2>\n<p>Westbound carriageway closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--heron-cross-to-stanley-matthews-interchange-burton-road-entry-slip-carriageway-repairs\">A50 \u2013 Heron Cross to Stanley Matthews Interchange Burton Road entry slip: carriageway repairs<\/h2>\n<p>Westbound carriageway closed 24 hour 7 days a week until 7 July. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a50--meir-interchange-exit-slip-road-to-catchems-corner-carriageway-repairs\">A50 \u2013 Meir Interchange exit slip road to Catchems Corner: carriageway repairs<\/h2>\n<p>Eastbound carriageway and slip road closed overnight between 8pm and 6am from 20 March until 25 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--wolstanton-entry-slip-and-porthill-exit-slip-roads-carriageway-works\">A500 \u2013 Wolstanton entry slip and Porthill exit slip roads: carriageway works<\/h2>\n<p>Northbound entry and exit slip roads closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--porthill-entry-and-wolstanton-exit-slip-roads-carriageway-works\">A500 \u2013 Porthill entry and Wolstanton exit slip roads: carriageway works<\/h2>\n<p>Southbound entry and exit slip roads will be closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--m6-junction-16-to-alsager-exit-and-entry-slip-roads-carriageway-repairs\">A500 \u2013 M6 junction 16 to Alsager exit and entry slip roads: carriageway repairs<\/h2>\n<p>Southbound exit and entry slip roads closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"a500--m6-junction-16-to-talke-exit-slip-road-carriageway-repairs\">A500 \u2013 M6 junction 16 to Talke exit slip road: carriageway repairs<\/h2>\n<p>Southbound carriageway and associated exit slip road closed overnight between 8pm and 6am from 24 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-to-m42-junction-3a-carriageway-works\">M40 \u2013 junction 15 to M42 junction 3a: carriageway works<\/h2>\n<p>Northbound carriageway and associated slip roads will be closed overnight between 10pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-16-entry-slip-road-carriageway-works\">M40 \u2013 junction 16 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-15-entry-slip-road-carriageway-works\">M40 \u2013 junction 15 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road will be closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m40--junction-3a-m42-to-m40-link-road-carriageway-works\">M40 \u2013 junction 3a M42 to M40 link road: carriageway works<\/h2>\n<p>Southbound carriageway closed overnight between 10pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-1-exit-and-entry-slip-road-carriageway-works\">M42 \u2013 junction 1 exit and entry slip road: carriageway works<\/h2>\n<p>Northbound exit slip road will be closed overnight between 10pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-6-exit-slip-road-carriageway-works\">M42 \u2013 junction 6 exit slip road: carriageway works<\/h2>\n<p>Northbound exit slip road closed overnight between 10pm and 6am from 20 March until 19 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-5-entry-slip-to-junction-carriageway-works\">M42 \u2013 junction 5 entry slip to junction: carriageway works<\/h2>\n<p>Northbound carriageway closed overnight between 10pm and 6am from 13 March until 25 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-5-entry-and-exit-slip-roads-carriageway-works\">M42 \u2013 junction 5 entry and exit slip roads: carriageway works<\/h2>\n<p>Northeast exit slip road and southwest exit and entry slip roads closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m42--junction-2-entry-slip-road-carriageway-works\">M42 \u2013 junction 2 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight for one night from 9pm 23 March until 6am the following morning (24 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-4a-to-junction-5-carriageway-works\">M5 \u2013 junction 4a to junction 5: carriageway works<\/h2>\n<p>Southbound carriageway closed between 8pm and 6am from 20 March until 21 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-4a-carriageway-works\">M5 \u2013 junction 5 to junction 4a: carriageway works<\/h2>\n<p>Northbound carriageway including northbound entry slip at junction 5 closed on 20 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-6-to-junction-5-carriageway-works\">M5 \u2013 junction 6 to junction 5: carriageway works<\/h2>\n<p>Northbound carriageway including northbound entry slip at junction 6 closed from 20 March to 24 March and on 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m5--junction-5-to-junction-6-carriageway-works\">M5 \u2013 junction 5 to junction 6: carriageway works<\/h2>\n<p>Southbound carriageway including southbound entry slip closed from 20 March until 24 March and 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-4-to-junction-2-carriageway-repairs\">M50 \u2013 junction 4 to junction 2: carriageway repairs<\/h2>\n<p>Westbound carriageway closed overnight between 8pm and 6am from 20 March until 25 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m50--junction-4-to-junction-2-carriageway-repairs-1\">M50 \u2013 junction 4 to junction 2: carriageway repairs<\/h2>\n<p>Eastbound carriageway closed overnight between 8pm and 6am from 24 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-to-junction-6-carriageway-repairs\">M54 \u2013 junction 5 to junction 6: carriageway repairs<\/h2>\n<p>Westbound carriageway closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-5-entry-slip-road-carriageway-repairs\">M54 \u2013 junction 5 entry slip road: carriageway repairs<\/h2>\n<p>Westbound entry slip road closed overnight between 8pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-slip-roads-carriageway-repairs\">M54 \u2013 junction 4 slip roads: carriageway repairs<\/h2>\n<p>Eastbound slip roads closed overnight between 8pm and 5am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-slip-roads-carriageway-repairs-1\">M54 \u2013 junction 4 slip roads: carriageway repairs<\/h2>\n<p>Westbound slip roads closed overnight between 8pm and 5am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m54--junction-4-entry-slip-road-to-junction-3-carriageway-repairs\">M54 \u2013 junction 4 entry slip road to junction 3: carriageway repairs<\/h2>\n<p>Eastbound carriageway and entry slip road closed overnight for one night from 10pm 22 March until 6am the following morning (23 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-to-junction-7-including-junction-10-and-9-entry-slip-roads-and-link-from-m5-carriageway-works\">M6 \u2013 junction 10 to junction 7 including junction 10 and 9 entry slip roads and link from M5: carriageway works<\/h2>\n<p>Southbound carriageway and associated slip roads closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-11-entry-slip-road-to-junction-10-exit-including-m54-junction-1-entry-slip-road-carriageway-works\">M6 \u2013 junction 11 entry slip road to junction 10 exit including M54 junction 1 entry slip road: carriageway works<\/h2>\n<p>Southbound carriageway and associated slip roads closed overnight between 9pm and 6am from 25 March until 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-10-including-junction-9-entry-slip-and-link-from-m5-northbound-carriageway-works\">M6 \u2013 junction 7 to junction 10 including junction 9 entry slip and link from M5 northbound: carriageway works<\/h2>\n<p>Northbound carriageway and associated slip roads closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-10-entry-slip-to-junction-11-exit-slip-road-carriageway-works\">M6 \u2013 junction 10 entry slip to junction 11 exit slip road: carriageway works<\/h2>\n<p>Northbound carriageway and associated slip roads closed overnight between 9pm and 6am from 25 March until 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-entry-slip-road-to-junction-4-entry-slip-road-carriageway-works\">M6 \u2013 junction 2 entry slip road to junction 4 entry slip road: carriageway works<\/h2>\n<p>Northbound carriageway and associated slip roads closed overnight between 9pm and 6am from 20 March until 24 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-8-southbound-to-m5-junction-1-southbound-western-arm-carriageway-works\">M6 \u2013 junction 8 southbound to M5 junction 1 southbound (Western Arm): carriageway works<\/h2>\n<p>Southbound Western Arm closed overnight between 8pm and 6am from 20 March until 25 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-entry-slip-road-carriageway-works\">M6 \u2013 junction 7 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road will be closed from 9pm 24 March ongoing until 6am 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-7-to-junction-8-carriageway-works\">M6 \u2013 junction 7 to junction 8: carriageway works<\/h2>\n<p>Northbound carriageway closed overnight between 9pm and 9am from 24 March until 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-8-to-m5-southbound-western-arm-carriageway-works\">M6 \u2013 junction 8 to M5 southbound (Western Arm): carriageway works<\/h2>\n<p>Southbound carriageway closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-11-entry-slip-road-carriageway-works\">M6 \u2013 junction 11 entry slip road: carriageway works<\/h2>\n<p>Northbound entry slip road closed overnight for one night from 8pm 20 March until 6am the following morning (21 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--hilton-park-services-exit-and-entry-slip-roads-carriageway-works\">M6 \u2013 Hilton Park Services exit and entry slip roads: carriageway works<\/h2>\n<p>Southbound exit and entry slip roads closed overnight between 9pm and 6am from 20 March until 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-exit-slip-road-carriageway-works\">M6 \u2013 junction 9 exit slip road: carriageway works<\/h2>\n<p>Southbound exit slip road closed overnight between 9pm and 6am from 20 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-9-entry-slip-road-carriageway-works\">M6 \u2013 junction 9 entry slip road: carriageway works<\/h2>\n<p>Southbound entry slip road will be closed overnight between 9pm and 6am from 20th March until 26th March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-15-entry-slip-road-junction-16-carriageway-works\">M6 \u2013 junction 15 entry slip road junction 16: carriageway works<\/h2>\n<p>Northbound entry slip road to junction 16 will be closed overnight between 8pm and 6am from 21 March until 24 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-16-to-junction-15-carriageway-works\">M6 \u2013 junction 16 to junction 15: carriageway works<\/h2>\n<p>Southbound carriageway closed overnight between 10pm and 6am from 21 March until 24 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-13-exit-slip-road-carriageway-works\">M6 \u2013 junction 13 exit slip road: carriageway works<\/h2>\n<p>Southbound exit slip road closed overnight for one night from 9.45pm 22 March until 5.30am the following morning (23 March). A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-2-exit-slip-road-carriageway-works\">M6 \u2013 junction 2 exit slip road: carriageway works<\/h2>\n<p>Southbound exit sip road closed overnight between 10pm and 6am from 24 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-4-to-junction-3-including-m42-junction-7a-link-and-junction-4-entry-slip-road-carriageway-works\">M6 \u2013 junction 4 to junction 3 including M42 junction 7a link and junction 4 entry slip road: carriageway works<\/h2>\n<p>Southbound carriageway, link road and entry slip road closed overnight between 10pm and 6am from 25 March until 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m6--junction-3-entry-slip-road-to-junction-2-exit-slip-including-m69-link-road-carriageway-works\">M6 \u2013 junction 3 entry slip road to junction 2 exit slip including M69 link road: carriageway works<\/h2>\n<p>Southbound carriageway including the slip roads and link road closed overnight between 10pm and 6am from 25 March until 27 March. A diversion route will be clearly signposted.<\/p>\n<h2 id=\"m69--junction-2-exit-slip-road-carriageway-works\">M69 \u2013 junction 2 exit slip road: carriageway works<\/h2>\n<p>Northbound exit slip road closed overnight between 10pm and 6am from 24 March until 26 March. A diversion route will be clearly signposted.<\/p>\n<h3 id=\"general-enquiries\">General enquiries<\/h3>\n<p>Members of the public should contact the Highways England customer contact centre on 0300 123 5000.<\/p>\n<h3 id=\"media-enquiries\">Media enquiries<\/h3>\n<p>Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Summary of planned new and ongoing road improvements over the coming week.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79920"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=79920"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/79920\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=79920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=79920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=79920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}