{"id":89941,"date":"2018-03-14T15:05:41","date_gmt":"2018-03-14T15:05:41","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=453a7b9ea040ccacb788b0065a9c5b43"},"modified":"2018-03-14T15:05:41","modified_gmt":"2018-03-14T15:05:41","slug":"news-story-new-storage-facility-is-ready-for-waste","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=89941","title":{"rendered":"News story: New storage facility is ready for waste"},"content":{"rendered":"<div class=\"govspeak\">\n<p>The <abbr title=\"ISF\">Interim Storage Facility<\/abbr> is paving the way for intermediate level waste to be removed from one of the sites priority high hazard retrieval facilities.<\/p>\n<p>The completion of the waste store was marked by a special event attended by the project teams, the ISF supply chain and representatives from <abbr title=\"NDA\">Nuclear Decommissioning Authority<\/abbr> (NDA).<\/p>\n<p>Sellafield Ltd\u2019s Waste Retrievals Director John Oliver said:<\/p>\n<blockquote>\n<p>We talk about moving legacy waste to a safer place; well, this is one of those safer places \u2013 a modern, fit-for-purpose storage facility which has been built using a design template already successfully proven within the NDA estate.<\/p>\n<p class=\"last-child\">Along with the other stores currently under construction, the <abbr title=\"ISF\">Interim Storage Facility<\/abbr> will be a vital part of our waste retrievals mission in the future.<\/p>\n<\/blockquote>\n<p>Duncan Thompson, NDA Sellafield Programme Director added:<\/p>\n<blockquote>\n<p>The completion of the ISF project is a fantastic example of the progress Sellafield has made in developing and implementing a fit-for-purpose facility that is helping to accelerate the mission of decommissioning and reducing the hazards of the UK\u2019s civil nuclear legacy.<\/p>\n<p class=\"last-child\">Developing and implementing innovative approaches to the challenges of nuclear decommissioning and clean-up is what we do and this is a great example of success at Sellafield, delivered safely, early and well below the estimated cost.<\/p>\n<\/blockquote>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sellafield Ltd\u2019s Interim Storage Facility (ISF) project is ready to support waste retrievals.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/89941"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=89941"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/89941\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=89941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=89941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=89941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}