{"id":96657,"date":"2018-10-17T10:30:05","date_gmt":"2018-10-17T10:30:05","guid":{"rendered":"http:\/\/mostafa.openonline.co.uk\/?guid=3482de91503b7863e551e5b61d361bcb"},"modified":"2018-10-17T10:30:05","modified_gmt":"2018-10-17T10:30:05","slug":"news-story-automated-design-for-a-more-efficient-railway-apply-for-funding","status":"publish","type":"post","link":"https:\/\/mostafa.openonline.co.uk\/?p=96657","title":{"rendered":"News story: Automated design for a more efficient railway: apply for funding"},"content":{"rendered":"<div class=\"govspeak\">\n<p><a rel=\"external\" href=\"https:\/\/assets.publishing.service.gov.uk\/government\/uploads\/system\/uploads\/attachment_data\/file\/663116\/rail-factsheet-2017.pdf\">Figures show that around 1.7 billion passengers<\/a> use the UK\u2019s railways every year. This number has more than doubled in the last 20 years &#8211; requiring innovative ways to design railway infrastructure that will support growth in future capacity.<\/p>\n<p>Working with <a rel=\"external\" href=\"https:\/\/www.networkrail.co.uk\">Network Rail<\/a>, Innovate UK has up to \u00a3300,000 for businesses with projects to fast-track automated design. The aim is to build safer and higher-capacity railway infrastructure, save money and improve services.<\/p>\n<h2 id=\"long-term-planning-and-capacity\">Long-term planning and capacity<\/h2>\n<p>Planning for the long-term future of the UK\u2019s railways involves navigating a complex range of systems.<\/p>\n<p>As well as crossing many different types of terrain and land uses, there are underlying considerations such as stock and track maintenance, bridges and tunnels. Importantly, planning must reflect passenger need.<\/p>\n<p>This competition is looking for ways to make automated design more efficient, allowing Network Rail to accelerate new designs, explore long-term performance and assess demand.<\/p>\n<h2 id=\"building-on-existing-technology\">Building on existing technology<\/h2>\n<p>The competition is open to industrial research projects as well as experimental development projects that are closer to market.<\/p>\n<p>Projects should automate the design of at least one of the following:<\/p>\n<ul>\n<li>track layout<\/li>\n<li>overhead line electrification<\/li>\n<li>traction power supply system<\/li>\n<li>signalling systems<\/li>\n<li>other railway infrastructure not mentioned here<\/li>\n<\/ul>\n<p>All projects must show how they build on existing automated design technology and work in a simulated rail infrastructure design environment.<\/p>\n<h2 id=\"competition-information\">Competition information<\/h2>\n<ul>\n<li>the competition opens on 22 October 2018 and the deadline for applications is at midday on 19 December 2018<\/li>\n<li>a briefing event will be held on <a rel=\"external\" href=\"https:\/\/www.eventbrite.co.uk\/e\/planning-rail-capacity-through-automated-infrastructure-design-competition-briefing-registration-51200029667\">1 November 2018 in London<\/a>, where you can find out more about the competition and how to make a quality application<\/li>\n<li>total project costs must be between \u00a350,000 and \u00a3200,000<\/li>\n<li>projects can last between 6 months and one year<\/li>\n<li>businesses could get up to 70% of their costs<\/li>\n<\/ul>\n<div class=\"call-to-action\">\n<p><a rel=\"external\" href=\"https:\/\/apply-for-innovation-funding.service.gov.uk\/competition\/252\/overview\">Find out more about this competition and apply<\/a>.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>UK organisations can apply for a share of up to \u00a3300,000 to develop new ways to plan railway infrastructure and meet passenger demand.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"_links":{"self":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/96657"}],"collection":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96657"}],"version-history":[{"count":0,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/96657\/revisions"}],"wp:attachment":[{"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mostafa.openonline.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}